The T3 railway tunnel—under construction within the scope of the Bursa-Yenişehir high-speed train project—is located in northwestern Turkey and has a length of 1250 m. The tunnel is being constructed entirely in silty clay/clayey silt, sand, and clay units, and it is designed in accordance with the principles of weak ground tunneling described by the new Austrian tunneling method (NATM). When the tunnel excavations began in 2013, during and after portal excavations, a failure occurred at the entrance of the tunnel; thus, a revision of the support systems became mandatory. While the excavation works proceeded after the revision phase, a collapse occurred again at the tunnel face where the overburden thickness was low. This study presents the mechanisms of the collapse that took place at the portal location and in the middle of the tunnel. The proposed tunnel support systems and their numerical analyses are also discussed, because the case is interesting for the tunnel community and will inform future tunnel construction work. For this reason, the relationship between portal excavation and tunnel excavation stability is described. Consequently, tunnels excavated through weak ground conditions are considered, and the importance of considering the face stability of tunnels in tunneling studies is underlined.
The Bolu tunnel is located between the Istanbul-Ankara Highway and its construction took approximately 13 years. Since the beginning of the tunnel excavation, serious deformations and stability problems have been encountered. The basis of the problems encountered during the tunnel excavation is the fact that the geological units through which the tunnel passes are very weak and fault lines cut the tunnel location. The fault lines pass through secondary faults in the seismically active North Anatolian Fault. At these fault crossings, deformations occurred continuously so that revisions had to be made in the support systems. The 12 November 1999 Düzce earthquake occurred on the Düzce fault and a surface rupture 40 km long was caused. The rupture terminated 1.5 km west of the tunnel; it did not reach the tunnel. Throughout the earthquake, instances of collapse occurred at the areas excavated on the fault line at the entrance of Elmalık and where the deformations exceeded 1.0 m; this section of the tunnel had to be abandoned. After these problems, a new improved design for tunnel excavation was developed. These new support systems, which are Bernold lining and bench pilot tunnel systems, contain allowance for rigid lining that is the opposite of the new Austrian tunneling method (NATM) principles. Within the scope of this study, the causes of the collapse in the tunnel are investigated and the effect of the Düzce earthquake on the tunnel is discussed. Also, the applicability of the NATM in tunnels excavated on weak zones is also discussed.
The problems experienced in tunnels excavated under high cover in graphitic schists generally vary according to the squeezing mechanism. During the tunnel excavation, slips occur on the slickenside surfaces in the tunnel face from time to time and collapse occurs. Most of the time, failures in the support systems are observed due to the squeezing mechanism in the long term in the sections whose tunnel excavations have been completed. In addition, if tunnel excavations are carried out from both entrance faces, it is possible to encounter excessive deformations at the junction points of the tunnels. Especially on weak ground, the importance of the distances between the stages increases in the case of opening the tunnels in the form of top heading, bench, and invert gradually. As a tunnel excavation method, excavation in stages directly affects the stability of the tunnel. Within the scope of this study, the collapsed mechanism in the junction area of the tunnels of the T6 tunnel is examined. For this purpose, 3-dimensional numerical analysis are performed with the Flac3d program. Analysis results are compared with site deformation measurements. As a result, an excavation methodology is proposed for the junction area of tunnels in weak ground.
13 December 2025 in Geotechnical and Geological Engineering
Son dönemlerde altyapı çalışmalarına ağırlık verilmiş olan ülkemizde tünelcilik faaliyetleri çok hızlı bir şekilde artış göstermiştir. Özellikle Yüksek Hızlı Demiryolu Projelerinde güzergahın kısıtlamalarından dolayı tünel sayısının arttığı daha net görülmüştür. Ülkemizdeki büyük alt yapı projelerinden olan Ankara İstanbul, Bursa Yenişehir, Ankara Konya, Kars Tiflis, Ankara Sivas ve Ankara İzmir arası Yüksek Hızlı Tren Projelerinde kazı çalışmaları devam etmektedir. Bu kesimlerde yer alan tünellerden bir kısmı tamamlanmış olup diğerlerinde kazı çalışmaları devam etmektedir. Söz konusu büyük projelerden edinilen tecrübeler ile bu çalışmada kapsamında tünel projelendirilmesi sırasında takip edilen yöntemler anlatılarak yöntemlerdeki kısıtlamalar, avantajlar ve dezavantajlar değerlendirilecektir.
Tunnels excavated in weak ground can develop problems due to squeezing phenomena. This situation is much more critical in large-diameter and double-tube tunnels. The effects of the tubes on each other are also important. The NATM (New Austrian Tunneling Method) is employed in the design of the support systems for these types of tunnels, which is based on the flexible outer arch principle and allows for deformations or minimization of deformations by increasing the lining thickness and using a rigid pavement. The risk of deformations occurring in a flexible outer arch is determined by the occurrence of deformations in shallow tunnels, which can affect the surface; a ground reaction curve can quickly develop and lead to a collapse. It is also known that the stability of the tunnel whose support and excavation is completed first can be impacted by subsequent excavations for the other tunnel. The purpose of the present study was to describe the geological and geotechnical conditions of a shallow tunnel excavated in weak ground and to assess its stability using three-dimensional numerical analysis. For this purpose, the Cukurcayir 1 tunnel—a double-tube tunnel—was employed as a case study. The 3D numerical analyses were performed using the Flac3d V2.10-222 software. The results are discussed in detail and recommendations for the necessary support system for tunnel roof and face stability are given.