20 February 2023 in Frontiers in Engineering and Built Environment
Verified
Journal Article
Open access
PDF file
EEEmmanuel Chidiebere Eze
Emmanuel Chidiebere Eze
OSOnyinye Sofolahan
Onyinye Sofolahan
OOOlayinka Gideon Omoboye
Olayinka Gideon Omoboye
Sustainable/Green building materials (SBMs/GBMs) offer a wide range of benefits which cut across the economic, social and environmental dimensions of sustainability. The incorporation of these materials in construction projects in most developing countries is still low owing to some factors. This study assessed the major barriers to the incorporation of SBMs in the delivery of construction projects in developing countries, with Nigeria as a case in point. The well-structured quantitative questionnaire was used to gather data from the key players in the construction industry, using the snowball sampling method and electronic means of questionnaire administration. Frequencies, percentile, relative importance index, Kruskal–Wallis H test, Kendall's coefficient of concordance and exploratory factor analysis were used to analyse the gathered data. The study revealed that the major constructs of barriers to SBM adoption in construction projects are: (1) resistance and information barriers (Eigenvalues = 5.237; % of V = 23.806), (2) regulation and funding of R&D (Eigenvalues = 2.741; % of V = 12.457), (3) cost and market barriers (Eigenvalues = 2.223; % of V = 10.105), (4) government incentive and suppliers' availability (Eigenvalues = 1.728; % of V = 7.852) and (5) GB experts and labour barriers (Eigenvalues = 1.307; % of V = 5.942). This study assessed the view of construction experts in the five states of the south-eastern geo-political zone of Nigeria, particularly as regards the barriers to the incorporation of sustainable building materials in construction projects in the region.

19 December 2022 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
EEEmmanuel Chidiebere Eze
Emmanuel Chidiebere Eze
Douglas AghimienDouglas Aghimien
Douglas Aghimien
CAClinton Ohis Aigbavboa
Clinton Ohis Aigbavboa
OSOnyinye Sofolahan
Onyinye Sofolahan
Purpose: This paper aims to present the result of an assessment of the potential effect of building information modelling (BIM) adoption on the reduction of construction waste (CW) from a developing country's perspective. This was done with a view to reducing the waste generated in construction projects particularly at the design and pre-contract stages.Design/methodology/approach: The study adopted a post-positivism philosophical approach, which informed the use of a quantitative research design and a questionnaire as instrument for data collection. The data gathered from construction professionals in the Nigeria construction industry were analysed using an array of statistical tools such as frequency, percentage, Kruskal–Wallis H-test, Kendall's coefficient of concordance, chi-square and exploratory factors analysis.Findings: The study revealed five major groups of factors causing CW at the design and pre-contract stages that can be avoided or minimised through BIM implementation. These are; (1) errors in design and documentation, (2) specification and quality factors, (3) estimating and site condition factors, (4) planning of work factors and (5) procurement related factors.Practical implications: The findings of the study offer practical insight for industry participants on the need for BIM implementation to reduce CW by identifying the diverse areas responsible for these waste generation.Originality/value: While there has been significant literature on BIM implementation, contributions on the effect of this technology in reducing waste generation particular at the design and pre-contract stages in developing countries has been almost non-existent. This study strives to fill in this gap by showcasing the major waste generating activities that can be avoided through the use of BIM.

29 March 2021 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
SESamuel Egwunatum
Samuel Egwunatum
AAAnthony Chukwunedum Anumudu
Anthony Chukwunedum Anumudu
EEEmmanuel Chidiebere Eze
Emmanuel Chidiebere Eze
IAImoleayo Abraham Abraham AWODELE
Imoleayo Abraham Abraham AWODELE
Purpose: Lack of strict compliance to the principles of total quality management (TQM) by construction organizations has brought about poor quality of the finished building projects. This has been blamed for the incessant structural failure reported in Nigeria. This study appraised TQM implementation in the Nigerian construction industry, with a view to mitigating structural failure rate of construction projects. To achieve this aim, the study aims to assess the practice level of TQM and the factors hindering TQM implementation on construction projects.Design/methodology/approach: The study utilized a well-structured questionnaire and convenient sampling method in the gathering and sampling of data among construction professionals in Imo state, Nigeria. Data analyses were done using, frequency, percentage, mean analytics and Pareto analysis.Findings: The study revealed that major practice of TQM principles with respect to structural failure rate are purchasing: ensuring the procurement of materials of the specified quality standard, ensuring the use of a quality improvement construction process of the organization, site management responsibility: this entails ensuring quality supervision by the project management leadership and monitoring and control of quality during the construction to guarantee firm observance quality standards. Also, the major factors hindering TQM implementation on construction projects are: inadequacy of the necessary machineries, equipment, tools and facilities for the effective execution of work on construction site; breakdown in communication and information exchange between the management and supervisory teams on site; poor attitudes and strategies toward maintenance of equipment, tools and machines; and absence of prompt salary and incentive payment. It was recommended that construction firms must require the suppliers of construction materials to strictly comply with quality specification evidence in quality certification of delivered materials to mitigate structural failure.Research limitations/implications: This study appraised TQM implementation in the construction industry of Nigeria, with emphasis on Imo state. The study underscores the practice level of TQM and the key factors hindering TQM implementation on construction projects. Following the localized geographical limitation of the study area, a similar research in other part/states of Nigeria or even in other developing countries of African is necessary.Practical implications: The practices level of TQM and the factors hindering TQM implementation were identified. This will be useful in guiding construction firms, other industry's key stakeholders and regulatory agencies in bringing about a sustainable quality management system for improve profit and value maximization and avoiding incessant structural failure.Originality/value: This is one of the few studies that have assessed the practice level of TQM and the factors hindering TQM implementation on construction projects in Nigeria. This study took place in Imo state with records of periodic structural failure and building collapse.

26 April 2024 in Smart and Sustainable Built Environment
Verified
Journal Article
Closed access
OSOnyinye Sofolahan
Onyinye Sofolahan
EEEmmanuel Chidiebere Eze
Emmanuel Chidiebere Eze
EAErnest Effah Ameyaw
Ernest Effah Ameyaw
JNJovita Nnametu
Jovita Nnametu
Purpose: The purpose of this study is to investigate barriers to the adoption of digital technologies (DTs) in the circular economy (CE) transition in the construction industry. The aim is to quantitatively investigate what the barriers to DTs-driven CE are in the Nigerian construction industry.Design/methodology/approach: A review of existing literature identified 32 barriers to DTs-led CE. A well-structured quantitative research questionnaire was developed and administered to construction experts using a convenient sampling technique via hand delivery and Google form. The gathered data were analysed using arrays of both descriptive and inferential statistical methods.Findings: The study revealed that the awareness of the digitalisation of CE is high, but the adoption is low. Five themes of the leading 10 factors responsible for the low adoption of DTs in CE transition in the Nigerian construction industry are (1) finance and demand barrier, (2) data management and information vulnerability, (3) skills shortage and infrastructure challenge, (4) poor government and management support and (5) interoperability and resistance problems.Practical implications: This study could be helpful to decision-makers and policy formulators, which would provide an avenue for higher adoption of DTs in CE transition in the construction industry, better performance and environmental protection. It also provides a foundation for further research efforts in Nigeria and other developing countries of Africa and beyond.Originality/value: Studies on the barriers to DT adoption in CE transition are still growing, and this is even non-existent in the Nigerian construction context. This offers a unique insight and original findings by pioneering the identification and assessment of barriers to the digitalisation of CE transition in Nigeria’s construction industry.

31 December 2021 in International Journal of Construction Supply Chain Management
Verified
Journal Article
Closed access
EEEmmanuel Chidiebere Eze
Emmanuel Chidiebere Eze
RURex Asibuodu Ugulu
Rex Asibuodu Ugulu
OOOnyealilam Peter Onyeagam
Onyealilam Peter Onyeagam
DADesoji Anthony Adegboyega
Desoji Anthony Adegboyega
The complexity and fragmented nature and the multiple stakeholders in the construction industry often make it difficult to come up with a firm decision regarding sustainable building materials selection. The wrong choice could negatively impact the project objective and performance outcome. This study assessed the critical factor influencing the choice of sustainable building materials (SBM) selection on construction projects in the Southeast geopolitical zone of Nigeria. Data were collected using a well-structured questionnaire, non-probability (purposive and snowball) sampling techniques, and an internet-mediated survey. Data analyses were carried out using the appropriate descriptive and inferential statistical tools and exploratory factor analysis (EFA). The study revealed recycled plastic, natural clay and mud, stone, bricks and tile, cellulose, stray bales, grasses, limestone, and wood timber, are the commonly used sustainable building materials. Also, their level of awareness is high while their adoption is moderate. EFA revealed that the major clusters of determinants of the choice of green building materials are: emissions minimisation, low running cost and reusability, low thermal and energy consumption efficiency, low cost and high health and safety consideration and waste minimisation. The key factors influencing the choice of sustainable building materials selection in construction are: reducing greenhouse gas emissions from buildings, materially embodied energy cost, operating and maintenance costs, non-toxic or low toxic emissions generated by the products/materials, recyclability of the building materials, availability of the technical skills, renewable (reusable) properties, inhibiting the impact of buildings on the environment, safety and health of the occupants, and appearance and aesthetic. It is recommended that consideration be given to these factors in selecting sustainable/green building materials in the designs and specifications of construction projects.

12 February 2024 in Heliyon
Verified
Journal Article
Open access
IAImoleayo Abraham Abraham AWODELE
Imoleayo Abraham Abraham AWODELE
MMModupe C. Mewomo
Modupe C. Mewomo
Angel GentoAngel Gento
Angel Gento
Albert ChanAlbert Chan
Albert Chan
ADAmos Darko
Amos Darko
OAOluwaseyi A. Awodele
Oluwaseyi A. Awodele
The railway industry has witnessed increasing adoption of digital technologies, known as Railway 4.0, that is revolutionizing operations, infrastructure, and transportation systems. However, developing countries face challenges in keeping pace with these technological advancements. With limited research on Railway 4.0 adoption in developing countries, this study was motivated to investigate the awareness, readiness, and challenges faced by railway professionals towards implementing Railway 4.0 technologies. The aim was to assess the level of awareness and preparedness and identify the key challenges influencing Railway 4.0 adoption in Nigeria's railway construction industry. A questionnaire survey (was distributed to professionals in the railway construction sector to gather their perspectives on awareness of, preparation for, and challenges associated with the use of Railway 4.0 technologies. The results revealed that awareness of Railway 4.0 technologies was moderate, while readiness was low among the professionals. Using exploratory factor analysis, 10 underlying challenge constructs were identified including lack of technical know-how, resistance to change, infrastructure limitations, and uncertainty about benefits, amongst others. Partial Least Square Structural Equation Modelling (PLS-SEM) confirmed these constructs, with reliability and availability, lack of technical know-how, lack of training and resources, and uncertainties in benefit and gains having significant influence on awareness and readiness. The study concludes that focused efforts in training, infrastructure improvement, supportive policies, and communicating the advantages of Railway 4.0 are critical to drive adoption in Nigeria and other developing economies. The findings provide insights into tailoring Railway 4.0 implementation strategies for developing contexts.