Shuxu Chen

Mrs. Shuxu Chen

orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 September 2024
Verified
Book Chapter
Closed access
PDF file
SCShuxu Chen
Shuxu Chen
WMWenxin Mu
Wenxin Mu
XJXianing Jin
Xianing Jin
MLMinghong Liu
Minghong Liu
JGJuanqiong Gou
Juanqiong Gou

20 August 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
MLMinghong Liu
Minghong Liu
SCShuxu Chen
Shuxu Chen
XJXianing Jin
Xianing Jin
WMWenxin Mu
Wenxin Mu
HZHuan Zhang
Huan Zhang
With the increasing complexity of grid project systems, it is difficult for an individual project management perspective to meet the macro management needs of the project, unapplicable to overall project layout management. However, the current grid project portfolio management (PPM) configuration lacks systematic methodological support, and the synergistic relationships between projects in terms of resources, strategy, and other aspects have not been effectively utilized, making it difficult to optimize the effectiveness of management and investment schemes. Therefore, in this paper, we propose a method called CNMI-PGPC, which combines complex networks and multidimensional indicators to explore the correlations among grid projects, deeply mines the key grid project clusters and the optimal allocation strategy, and is devoted to improving the comprehensive efficiency of grid projects. The methodology was validated on data derived from the Grid Multi-Category Reserve Project (including grid infrastructure, production technology improvement, and grid digitization). The results show that the proposed method can effectively provide a scientific basis for configuring and managing grid projects, support the preferential decision-making tasks of projects, and optimize the layouts of grid projects. We shift from single-project optimization to global synergy, quantify the comprehensive benefits of the project team in terms of economics, strategy, and other dimensions, bridge the gap between the previous individual project assessment perspectives, and provide a systematic decision-making basis for grid project portfolio planning.

2 October 2026 in Applied Sciences
Verified
Journal Article
Open access
PDF file
XJXianing Jin
Xianing Jin
JYJicong You
Jicong You
LMLiang Ma
Liang Ma
DZDONG ZHAO
DONG ZHAO
SCShuxu Chen
Shuxu Chen
HWHongwei Wang
Hongwei Wang
Power grid companies have established a feasibility study reserve phase to optimize the rolling schedule of annual investments, in which projects undergo preliminary feasibility studies, are incorporated into a project reserve pool, and subsequently proceed through release, implementation, and monitoring. However, the lack of synergy among projects in this process makes it difficult to maximize investment returns. To address this issue, this paper proposes a multiscale feature integration approach to power grid project portfolio management to optimize project management and investment efficiency. The proposed method constructs a multidimensional project association network integrating strategic, geographic, and semantic factors, and it extracts and fuses multiscale features to support project portfolio decision-making. Experimental results demonstrate that the proposed method effectively optimizes power grid project portfolios and is better suited to power grid projects than existing project optimization methods.