Changxiang Lu

Dr. Changxiang Lu


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 October 2025 in Systems
Verified
Journal Article
Open access
PDF file
CLChangxiang Lu
Changxiang Lu
YYYong Ye
Yong Ye
ZSZhiming Shi
Zhiming Shi
This study investigates how process manufacturing enterprises can optimize semi-finished inventory (SFI) distribution in delayed production models, with particular attention to differences in cost volatility between single- and multi-period planning scenarios. To address this research gap, we develop a mixed-integer programming model that determines optimal customer order decoupling point (CODP)/product differentiation point (PDP) positions and SFI quantities (both generic and dedicated) for each production period, employing particle swarm optimization for solution derivation and validating findings through a comprehensive case study of a steel manufacturer with characteristic long-period production processes. The analysis yields two significant findings: (1) single-period operations demonstrate marked cost sensitivity to service level requirements and delay penalties, necessitating end-stage inventory buffers, and (2) multi-period optimization generates a distinctive cost-smoothing effect through strategic order deferrals and cross-period inventory reuse, resulting in remarkably stable total costs (≤2% variation observed). The study makes seminal theoretical contributions by revealing the convex cost sensitivity of short-term inventory decisions versus the near-flat cost trajectories achievable through multi-period planning, while establishing practical guidelines for process industries through its empirically validated two-period threshold for optimal order deferral and inventory positioning strategies.