Aleksandra Łukomska

Ms. Aleksandra Łukomska


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2024 in Journal of Ecological Engineering
Verified
Journal Article
Open access
AŁAleksandra Łukomska
Aleksandra Łukomska
Jakub PulkaJakub Pulka
Jakub Pulka
MBMichał Broński
Michał Broński
Jacek DachJacek Dach
Jacek Dach
In recent years, Poland has seen a rapid increase in installed capacity in the Renewable Energy Sources (RES) sector. This increase mainly concerns weather-dependent sources such as PV and wind installations, whose intermittent operation destabilizes the Polish power system (PPS). The solution to...

25 July 2025 in Processes
Verified
Journal Article
Open access
PDF file
AŁAleksandra Łukomska
Aleksandra Łukomska
Kamil WitaszekKamil Witaszek
Kamil Witaszek
Jacek DachJacek Dach
Jacek Dach
Renewable energy sources (RES) are the foundation of the ongoing energy transition in Poland and worldwide. However, increased use of RES has brought several challenges, as most of these sources are dependent on weather conditions. The instability and lack of control over electricity production lead to both overloads and power shortages in transmission and distribution networks. A significant advantage of biogas plants over sources such as photovoltaics or wind turbines is their ability to control electricity generation and align it with actual demand. Biogas produced during fermentation can be temporarily stored in a biogas tank above the digester and later used in an enlarged CHP unit to generate electricity and heat during peak demand periods. While demand-driven biogas plants operate similarly to traditional installations, their development requires navigating regulatory and administrative procedures, particularly those related to the grid connection of the generated electricity. In Poland, it has only recently become possible to obtain grid connection conditions for such installations, following the adoption of the Act of 28 July 2023, which amended the Energy Law and certain other acts. However, the biogas sector still faces challenges, particularly the need for effective incentive mechanisms and the removal of regulatory and economic barriers, especially given its estimated potential of up to 7.4 GW.

1 July 2026 in Energies
Verified
Journal Article
Open access
PDF file
AŁAleksandra Łukomska
Aleksandra Łukomska
Kamil WitaszekKamil Witaszek
Kamil Witaszek
Jacek DachJacek Dach
Jacek Dach
ADAlla Dudnyk
Alla Dudnyk
YKYurii Kharchenko
Yurii Kharchenko
EKEryk Kosiński
Eryk Kosiński
This study addresses the increasing need for flexibility in the Polish Power System (PPS), particularly in the context of growing price volatility on the Day-Ahead Market (DAM) resulting from the rising share of renewable energy sources (RESs). The aim of the study was to assess the feasibility of implementing demand-driven operation in an existing linear biogas plant in Poland and to develop a Decision-Making Model (DMM) for optimizing its operation based on electricity price forecasts. A machine learning model based on Extreme Gradient Boosting (XGBoost) was developed using historical electricity price, demand and weather data and integrated into the DMM to generate hourly operating schedules. The model achieved high predictive accuracy, with a Mean Absolute Error (MAE) of approximately 51 PLN/MWh, and effectively captured nonlinear price dynamics. Based on predefined decision thresholds—biogas production rate, current biogas storage level, upper and lower limits of pressure in biogas storage capacity, maximum biogas storage duration, power quotient (PQ) and electricity price levels—optimal operating strategies were determined. The results indicate that while demand-driven operation is technically feasible and enables better alignment with market signals, its economic viability remains limited under current market and regulatory conditions. Investment in additional cogeneration capacity was not justified, as costs significantly exceeded potential revenues. Consequently, a more viable approach involves optimizing existing infrastructure through flexible production strategies.

25 December 2025 in Energies
Verified
Journal Article
Open access
PDF file
Kamil WitaszekKamil Witaszek
Kamil Witaszek
SSSergey Shvorov
Sergey Shvorov
OOOleksii Opryshko
Oleksii Opryshko
ADAlla Dudnyk
Alla Dudnyk
Denys ZhukDenys Zhuk
Denys Zhuk
Jacek DachJacek Dach
Jacek Dach
Biogas production plays a key role in the development of renewable energy systems; however, forecasting biomethane yield remains challenging due to the nonlinear nature of anaerobic digestion. The objective of this study was to develop a predictive model based on Radial Basis Function Neural Networks (RBF-NN) to approximate biomethane production using operational data from the Przybroda biogas plant in Poland. Two separate models were constructed: (1) the relationship between process temperature and daily methane production, and (2) the relationship between methane fraction and total biogas flow. Both models were trained using Gaussian activation functions, individually adjusted neuron parameters, and a zero-level correction algorithm. The developed RBF-NN models demonstrated high approximation accuracy. For the temperature-based model, root mean square error (RMSE) decreased from 531 m3 CH4·day−1 to 52 m3 CH4·day−1, while for the methane-fraction model, RMSE decreased from 244 m3 CH4·day−1 to 27 m3 CH4·day−1. The determination coefficients reached R2 = 0.99 for both models. These results confirm that RBF-NN provides an effective and flexible tool for modeling complex nonlinear dependencies in anaerobic digestion, even when only limited datasets are available, and can support real-time monitoring and optimization in biogas plant operations.

1 October 2026 in Energies
Verified
Journal Article
Open access
PDF file
AŁAleksandra Łukomska
Aleksandra Łukomska
Kamil WitaszekKamil Witaszek
Kamil Witaszek
Krzysztof KoszelaKrzysztof Koszela
Krzysztof Koszela
Jacek DachJacek Dach
Jacek Dach
The aim of the study was to conduct an energy and economic analysis of construction of a demand-driven biogas plant. Two capacity configurations, 0.249 MW and 0.499 MW, were analyzed using four demand-driven operating variants and a linear reference case. Revenues were calculated under the Feed-in Premium (FIP) system based on electricity prices on the Day-Ahead Market (DAM) in 2025. Among the analyzed variants, D4 was the most favorable, combining the predetermined curtailment schedule introduced by the recent amendment to the Polish Energy Law, with additional price-responsive operation during the remaining months. For D4, net present value (NPV) reached PLN 3.826 million, with an internal rate of return (IRR) of 12.87% and a discounted payback period (DPBP) of 9.93 years for the 0.249 MW configuration, and PLN 17.045 million, with an IRR of 20.61% and a DPBP of 6.21 years for the 0.499 MW configuration. Although D4 generated a higher NPV than the linear variants, its higher investment costs resulted in less favorable IRR and DPBP values. Increasing the reference price for demand-driven biogas plants to approximately 1100 PLN/MWh could reduce this profitability gap. An indicative comparison showed similar expenditure per unit of energy capacity for the additional infrastructure required for demand-driven operation and battery energy storage system (BESS); however differences between the technologies and the cost assumptions prevent a direct assessment of their economic competitiveness.