Shijun Chen

Dr. Shijun Chen


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2021 in Renewable and Sustainable Energy Reviews
Verified
Journal Article
Closed access
JLJidong Li
Jidong Li
SCShijun Chen
Shijun Chen
YWYuqiang Wu
Yuqiang Wu
QWQinhui Wang
Qinhui Wang
XLXing Liu
Xing Liu
LGLu Gao
Lu Gao

9 April 2018 in Energies
Verified
Journal Article
Open access
PDF file
XZXinshuo Zhang
Xinshuo Zhang
GMGuangwen Ma
Guangwen Ma
WHWeibin Huang
Weibin Huang
SCShijun Chen
Shijun Chen
SZShuai Zhang
Shuai Zhang
How to effectively use clean renewable energy to improve the capacity of the power grid to absorb new energy and optimize the power grid structure has become one of China’s current issues. The Yalong River Wind-PV-Hydro complementary clean energy base was chosen as the research object from which to analyze the output complementarity principle and characteristics of wind farms, photovoltaic power plants, and hydropower stations. Then, an optimization scheduling model was established with the objective of minimizing the amount of abandoned wind and photovoltaic power and maximizing the stored energy in cascade hydropower stations. A Progress Optimality Algorithm (POA) was used for the short-term optimal operation of Wind-PV-Hydro combinations. The results show that use of cascaded hydropower storage capacity can compensate for large-scale wind power and photovoltaic power, provide a relatively sustained and stable power supply for the grid. Wind-PV-Hydro complementary operation not only promotes wind power and photovoltaic power consumption but also improves the efficiency of using the original transmission channel of hydropower. This is of great significance to many developing countries in formatting a new green approach, realizing low-carbon power dispatch and trade and promoting regional economic development.

8 February 2023 in Journal of Hydrology
Verified
Journal Article
Closed access
YYYue Yang
Yue Yang
SCShijun Chen
Shijun Chen
YZYerong Zhou
Yerong Zhou
GMGuangwen Ma
Guangwen Ma
WHWeibin Huang
Weibin Huang
YZYanmei Zhu
Yanmei Zhu

1 July 2018 in Journal of Renewable and Sustainable Energy
Verified
Journal Article
Closed access
PDF file
YZYanmei Zhu
Yanmei Zhu
SCShijun Chen
Shijun Chen
WHWeibin Huang
Weibin Huang
LWLi Wang
Li Wang
GMGuangwen Ma
Guangwen Ma
The hydro-wind-solar hybrid power system of interest is in the upper reaches of the Jinsha River and is composed of the Gangtuo hydropower station, the Wanjiashan solar power station in Yanbian, and the Dechang wind farm. An analysis of the output characteristics of the three stations in the system is carried out. Based on a quantitative analysis of the output complementarity over a year (using a method of Pearson correlation) and a qualitative analysis of the output complementarity in a day, a mode of complementary operation is presented in this paper. On this basis, a real-time model is built using Visual BASIC and used to carry out complementary operational research. As a result, we ascertain the mode of reservoir operation required for a given total load on the power grid, wind power, and solar output. The research reveals the complementarity between the monthly and hourly energy outputs of pairs of the three kinds of energy sources. The complementarity between hydropower and wind power is found to be better than that between hydropower and solar power. Transmitting hydro, wind, and solar power together not only lowers the impact of negative factors but can also improve the efficiency of the energy delivery channels. This may help mitigate the impact on the environment and optimise the energy structure.

21 September 2020 in Water Supply
Verified
Journal Article
Closed access
PDF file
SCShijun Chen
Shijun Chen
WQWei Qin
Wei Qin
ZYZhu Yanmei
Zhu Yanmei
MGMa Guangwen
Ma Guangwen
HXHan Xiaoyan
Han Xiaoyan
WLWang Liang
Wang Liang
Medium- and long-term runoff forecasting is closely related to the generation capacity forecasting of cascade hydropower stations, which is of great significance to power plants when arranging production plans and assisting market decisions. In order to improve the accuracy of the runoff forecasting, an attempt was made to use random forest regression (RFR) to model the medium- and long-term runoff forecasting and to further make a verification based on the actual monthly runoff data of Mupo and Chuntangba stations. By comparison with the forecast results attained through a support vector machine (SVM) and an integrated autoregressive moving average model (IARMA), the results showed that the RFR model had the lowest mean square error (MSE) among the three methods. In addition, the coefficients of determination R2 of the RFR for the two stations increased by 0.0261 and 0.0295 compared with the SVM model, and the R2 rose by 0.1134 and 0.1332 compared with the IARMA model. The comparison of the three methods showed that the RFR had higher forecasting accuracy as well as stronger reliability and practicability than the IARMA model and the SVM model, so the RFR provided a new idea and method for the study of runoff forecasting.

27 October 2021 in IEEE Transactions on Vehicular Technology
Verified
Journal Article
Closed access
Jiancun FanJiancun Fan
Jiancun Fan
XDXiaoyuan Dou
Xiaoyuan Dou
WZWei Zou
Wei Zou
SCShijun Chen
Shijun Chen
In the existing millimeter-wave (mmWave) wireless positioning systems, the method based on sparse Bayesian learning (SBL) uses the channel sparsity to estimate the parameters required for positioning, such as angle of arrival (AOA) and time delay, but most existing SBL solutions only consider the angle sparsity. In this paper, we consider the joint sparsity of the angle domain and time delay domain to propose an improved SBL algorithm by using a new two-dimensional adaptive grid refinement method in the SBL framework. This algorithm solves the grid mismatch problem caused by the fixed grid in the traditional SBL method, and reduces the algorithm complexity of the off-grid SBL (OGSBL) algorithm. We also obtain the Cramér-Rao bound (CRB) of AOA, time delay and position estimation based on the mmWave multipath signals to analyze the estimation errors. Simulation results show that the performance of the proposed algorithm is better than existing algorithms and can approach CRB.