Weibin Huang

Dr. Weibin Huang


Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
9 April 2018 in Energies
Verified
Journal Article
Open access
PDF file
XZXinshuo Zhang
Xinshuo Zhang
GMGuangwen Ma
Guangwen Ma
WHWeibin Huang
Weibin Huang
SCShijun Chen
Shijun Chen
SZShuai Zhang
Shuai Zhang
How to effectively use clean renewable energy to improve the capacity of the power grid to absorb new energy and optimize the power grid structure has become one of China’s current issues. The Yalong River Wind-PV-Hydro complementary clean energy base was chosen as the research object from which to analyze the output complementarity principle and characteristics of wind farms, photovoltaic power plants, and hydropower stations. Then, an optimization scheduling model was established with the objective of minimizing the amount of abandoned wind and photovoltaic power and maximizing the stored energy in cascade hydropower stations. A Progress Optimality Algorithm (POA) was used for the short-term optimal operation of Wind-PV-Hydro combinations. The results show that use of cascaded hydropower storage capacity can compensate for large-scale wind power and photovoltaic power, provide a relatively sustained and stable power supply for the grid. Wind-PV-Hydro complementary operation not only promotes wind power and photovoltaic power consumption but also improves the efficiency of using the original transmission channel of hydropower. This is of great significance to many developing countries in formatting a new green approach, realizing low-carbon power dispatch and trade and promoting regional economic development.

26 October 2021 in Electrical Engineering
Verified
Journal Article
Closed access
PDF file
HXHang Xie
Hang Xie
SCShijun Chen
Shijun Chen
CLChunyang Lai
Chunyang Lai
GMGuangwen Ma
Guangwen Ma
WHWeibin Huang
Weibin Huang

1 January 2018 in Journal of Renewable and Sustainable Energy
Verified
Journal Article
Closed access
PDF file
YYYujian Ye
Yujian Ye
WHWeibin Huang
Weibin Huang
GMGuangwen Ma
Guangwen Ma
JWJinlong Wang
Jinlong Wang
YLYue Liu
Yue Liu
YHYanlong Hu
Yanlong Hu
The use of hydropower has expanded in recent years in southwest China, playing a key role in the success of China's West-to-East energy strategy. Although installed hydropower capacity has reached a record high, the problem of abandoned water has intensified and has been gradually highlighted by researchers. Abandoned water has resulted in a significant waste of carbon-free and inexpensive renewable energy, which is not conducive to China's goals to reduce emissions to save energy. This waste has seriously affected the development of China's hydropower industry. Therefore, now is the time to analyze the main reasons for the abandoned water problem and to identify the crux of the problem. In this paper, we collected the actual operation data of all the power stations in the case area and established the mathematical model according to the quantity of abandoned water as well as the actual and the theoretical output curve of the power station to quantify the abandoned water into energy loss. We then classified the abandoned water according to three groups of causes, namely, generation-side, line-side, and market-side causes. In 2016, the total energy loss of abandoned water of Sichuan Province was 28.73 × 109 kW h, of which the generation-, line-, and market-side causes account for 7.76%, 11.68%, and 80.56% of the energy loss, respectively. Therefore, the market-side causes are the main cause for the abandoned water problem. Such market-side causes primarily include the imbalance between electricity supply and demand, the provincial barriers of the local government system and its mechanisms, and the hysteresis congestion of the transmission lines. Seizing the favorable opportunity presented by new power system reforms in China, this study proposes several market-oriented measures to improve hydropower consumption capacity.

31 July 2018 in Water Policy
Verified
Journal Article
Closed access
PDF file
YLYue Liu
Yue Liu
WHWeibin Huang
Weibin Huang
GMGuangwen Ma
Guangwen Ma
SCShijun Chen
Shijun Chen
JWJinlong Wang
Jinlong Wang
Tibet and the Sichuan-Yunnan Tibetan area have enormous potential for hydropower development. Therefore, accelerating hydropower development in these areas can contribute to water resource utilisation and help relieve the poverty, which has also become a necessary choice of national strategic importance to comply with energy-saving, emission reduction, and ‘power transmission from west to east’ policies. Under existing policies, research has shown that the basic costs of electricity from the typical plants in Tibet and the Sichuan-Yunnan Tibetan area are high and uncompetitive, so that investment enthusiasm for hydropower companies will wane and water resource utilisation will be affected. In this study, we suggest policies to improve the competitiveness and sustainability of the hydropower development in the Tibet and Sichuan-Yunnan Tibetan areas; eventually, the water resources therein can be more effectively utilised. Research has indicated that drafted preferential policies can effectively decrease the cost price. Additionally, the hydropower industry in these areas should be incorporated into the national primary energy balance, forming a government-dominated market mechanism. This would consist of a mandatory market share of the hydropower transmitted from Tibet and the Sichuan-Yunnan Tibetan area and hydropower–carbon trade mechanism – the aim being to promote the consumption of hydropower across the nation.

7 September 2015 in Water Supply
Verified
Journal Article
Closed access
PDF file
JWJinlong Wang
Jinlong Wang
WHWeibin Huang
Weibin Huang
GMGuangwen Ma
Guangwen Ma
YWYuhua Wang
Yuhua Wang
An operational model that analyzes the relationship between annual energy output and year-end stored energy of a reservoir system was developed and used for determining the optimal year-end water level of a multi-year regulating storage reservoir. The model accounts for the capacity benefit of a multi-annual storage plant and was validated using the case of the Longyangxia reservoir in the upper reaches of the Yellow River, China. The critical elements for determining the optimal year-end water level for multi-year regulating storage reservoirs were revealed through analysis of the impacts of runoff and year-start water level on year-end water level. Simulated operational results from the model were compared with practical operational results for the Longyangxia reservoir system from 1990–2012. A comparison shows that the operating mode for Longyangxia reservoir (after 2006) achieved significant improvement versus before 2006, in making the reservoir run at a higher water level and increasing benefits. In addition, our study indicates that the model can be effectively used for multi-year regulating storage reservoir operation.

1 January 2015 in Journal of Renewable and Sustainable Energy
Verified
Journal Article
Closed access
PDF file
YHYanlong Hu
Yanlong Hu
WHWeibin Huang
Weibin Huang
SCShijun Chen
Shijun Chen
JWJinlong Wang
Jinlong Wang
YLYue Liu
Yue Liu
This study systematically investigated electricity production cost in Tibet and analyzed the affordability of the on-grid price for newly built hydropower plants. According to the investigation, the ratio of the power generation cost to the power transmission and distribution cost is 5:5 in Tibet's Central grid, whereas the ratios are 4.5:5.5 and 6:4 in the Changdu and Ali grids, respectively. It was determined that the increased financial expense of newly built independent power plants is the main cause of their higher electricity production cost. Based on the particular conditions prevalent in Tibet, we established a new affordability evaluation model that takes into account the local resident living standard, the potential for cost reduction for industrial production, the capacity for surrendering profits, and the capability of transferring price for each industry. The results indicate that the highest affordable on-grid price of the Central, Changdu, and Ali grids are 0.3274, 0.2398, and 0.9212 RMB/kW h, respectively. These values do not meet the breakeven point for a newly built hydropower plant, which indicates a serious electricity price problem. In this article, alternatives are investigated for mitigating the mismatch between the hydropower generation cost and the local affordability of the on-grid price to protect the investment motivation of independent power enterprises. The alternatives considered are the acceleration of electrical system reform in Tibet, the value added tax rebate for independent hydropower enterprises, and extension of loan payment periods for power generation enterprises.