Yehia Miky

Prof. Yehia Miky

Geomatics Department, King Abdulaziz University,, Jeddah, Makkah al Mukarramah, Saudi Arabia
orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
Verified
Journal Article
Open access
PDF file
YAYahya Alshawabkeh
Yahya Alshawabkeh
Ahmad Hamed BaikAhmad Hamed Baik
Ahmad Hamed Baik
Yehia MikyYehia Miky
Yehia Miky
Digital 3D capture and reliable reproduction of architectural features is the first and most difficult step towards defining a heritage BIM. Three-dimensional digital survey technologies, such as TLS and photogrammetry, enable experts to scan buildings with a new level of detail. Challenges in the tracing of parametric objects in a TLS point cloud include the reconstruction of occluded parts, measurement of uncertainties relevant to surface reflectivity, and edge detection and location. In addition to image-based techniques being considered cost effective, highly flexible, and efficient in producing a high-quality 3D textured model, they also provide a better interpretation of surface linear characteristics. This article addresses an architecture survey workflow using photogrammetry and TLS to optimize a point cloud that is sufficient for a reliable HBIM. Fusion-based workflows were proposed during the recording of two heritage sites—the Matbouli House Museum in Historic Jeddah, a UNESCO World Heritage Site; and Asfan Castle. In the Matbouli House Museum building, which is rich with complex architectural features, multi-sensor recording was implemented at different resolutions and levels of detail. The TLS data were used to reconstruct the basic shape of the main structural elements, while the imagery’s superior radiometric data and accessibility were effectively used to enhance the TLS point clouds for improving the geometry, data interpretation, and parametric tracing of irregular objects in the facade. Furthermore, in the workflow that is considered to be the ragged terrain of the Castle of Asfan, here, the TLS point cloud was supplemented with UAV data in the upper building zones where the shadow data originated. Both datasets were registered using an ICP algorithm to scale the photogrammetric data and define their actual position in the construction system. The hybrid scans were imported and processed in the BIM environment. The building components were segmented and classified into regular and irregular surfaces, in order to perform detailed building information modeling of the architectural elements. The proposed workflows demonstrated an appropriate performance in terms of reliable and complete BIM mapping in the complex structures.

3 March 2022 in Buildings
Verified
Journal Article
Open access
PDF file
UIUsama Issa
Usama Issa
FSFam F. Abdelmalak Saeed
Fam F. Abdelmalak Saeed
Yehia MikyYehia Miky
Yehia Miky
MAMuwaffaq Awadh Alqurashi
Muwaffaq Awadh Alqurashi
EOEmad Osman
Emad Osman
This paper introduces and further applies an approach to support the decision makers in construction projects differentiating among a variety of deep excavation supporting systems (DESSs). These kinds of problems include dealing with uncertainty in data, multi-criteria affecting the decision, and multi-alternatives to select one from them. The proposed approach combines the analytic hierarchy process (AHP) with the fuzzy technique for order of preference by similarity to ideal solution (fuzzy TOPSIS) in a multicriteria decision-making (MCDM) model. The MCDM model emphasize the ability to combine expert knowledge, cost calculations, and laboratory test results for soil properties to achieve the scope. The model proved it had a superior ability to deal with the complexity and vague data that are related to construction projects. Furthermore, it was applied to a real case study for a governmental housing project in Egypt. Secant pile walls, sheet pile walls, and soldier piles and lagging are selected and studied as being the most common DESSs and as they satisfy the project requirements. The model utilized four criteria and fourteen comparing factors, including site characteristics, safety, cost, and environmental impacts. Based on the results of the model application on the investigated case study, a decision was reached that using secant piles as a supporting system in this project is mostly preferred. Furthermore, sheet pile wall, and soldier piles and lagging, come next in the ranking order. A sensitivity analysis is carried out to investigate how sensitive the results are to the criteria weights. In addition, the paper discusses in detail the reasons and factors which affect and control the decision-making process.

1 December 2017 in Beni-Suef University Journal of Basic and Applied Sciences
Verified
Journal Article
Open access
FSFam F. Abdelmalak Saeed
Fam F. Abdelmalak Saeed
UIUsama Issa
Usama Issa
Yehia MikyYehia Miky
Yehia Miky
EOEmad A. Osman
Emad A. Osman
Multi-Criteria Decision-Making (MCDM) techniques are found to be useful tools in project managersâ hands to overcome decision-making (DM) problems in Civil Engineering Projects (CEPs). The main contribution of this paper includes selecting and studying the popular MCDM techniques that uses different and wide ranges of data types in CEPs. A detailed study including advantages and pitfalls of using the Analytic Hierarchy Process (AHP) and Fuzzy Technique for Order of Preference by Similarity to Ideal Solution (Fuzzy TOPSIS) is introduced. Those two techniques are selected for the purpose of forming a package that covers most available data types in CEPs. The results indicated that AHP has a structure which simplifies complicated problems, while Fuzzy TOPSIS uses the advantages of linguistic variables to solve the issue of undocumented data and ill-defined problems. Furthermore, AHP is a simple technique that depends on pairwise comparisons of factors and natural attributes, beside it is preferable for widely spread hierarchies. On the other hand, Fuzzy TOPSIS needs more information but works well for the one-tier decision tree as well as it shows more flexibility to work in fuzzy environments. The two techniques have the facility to be integrated and combined in a new module to support most of the decisions required in CEPs. Keywords: Decision-making, AHP, Fuzzy TOPSIS, CBA, Civil Engineering Project

8 February 2019 in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
Verified
Journal Article
Open access
PDF file
UIUsama Issa
Usama Issa
Yehia MikyYehia Miky
Yehia Miky
FSFam F. Abdelmalak Saeed
Fam F. Abdelmalak Saeed
This paper develops a model, introduced in software, namely Multi-Criteria Decision-Making Model (MCDMM). The model helps decision makers selecting the most suitable alternative based on the customer requirements and preferences. Analytic Hierarchy Process (AHP) and Fuzzy Technique for Order of Preference by Similarity to Ideal Solution (Fuzzy TOPSIS) form a package that covers most available data types in construction projects. In MCDMM, AHP produces criteria relative weights according to their influence on the discussed problem, while Fuzzy TOPSIS is applied to rank the available alternatives. The model consists of two modules, first one uses AHP only to deal with precise, qualitative alongside quantitative data, while the other module combines AHP with Fuzzy TOPSIS due to the importance of linguistic variables to cover undocumented data. MCDMM is verified using two real case studies. The model is applied to a real case project for constructing solar power plants at Saudi Arabia. A decision required to select the most suitable surveying technique for producing Digital Terrain Model (DTM) among four alternatives (Total Station, Remote Sensing, Photogrammetry, and Global Positioning Systems). This issue is studied and key points are identified for prioritizing among them. Total Station is selected based on the model results.

Verified
Journal Article
Open access
PDF file
YAYahya Alshawabkeh
Yahya Alshawabkeh
Ahmad Hamed BaikAhmad Hamed Baik
Ahmad Hamed Baik
Yehia MikyYehia Miky
Yehia Miky
Building information modeling (BIM) has recently become more popular in historical buildings as a method to rebuild their geometry and collect relevant information. Heritage BIM (HBIM), which combines high-level data about surface conditions, is a valuable tool for conservation decision-making. However, implementing BIM in heritage has its challenges because BIM libraries are designed for new constructions and are incapable of accommodating the morphological irregularities found in historical structures. This article discusses an architecture survey workflow that uses TLS, imagery, and deep learning algorithms to optimize HBIM for the conservation of the Nabatean built heritage. In addition to creating new resourceful Nabatean libraries with high details, the proposed approach enhanced HBIM by including two data outputs. The first dataset contained the TLS 3D dense mesh model, which was enhanced with high-quality textures extracted from independent imagery captured at the optimal time and location for accurate depictions of surface features. These images were also used to create true orthophotos using accurate and reliable 2.5D DSM derived from TLS, which eliminated all image distortion. The true orthophoto was then used in HBIM texturing to create a realistic decay map and combined with a deep learning algorithm to automatically detect and draw the outline of surface features and cracks in the BIM model, along with their statistical parameters. The use of deep learning on a structured 2D true orthophoto produced segmentation results in the metric units required for damage quantifications and helped overcome the limitations of using deep learning for 2D non-metric imagery, which typically uses pixels to measure crack widths and areas. The results show that the scanner and imagery integration allows for the efficient collection of data for informative HBIM models and provide stakeholders with an efficient tool for investigating and analyzing buildings to ensure proper conservation.

1 November 2021 in Ocean Engineering
Verified
Journal Article
Closed access
Yehia MikyYehia Miky
Yehia Miky
MKMosbeh R. Kaloop
Mosbeh R. Kaloop
MEMohamed T. Elnabwy
Mohamed T. Elnabwy
ABAhmad Baik
Ahmad Baik
AAAhmed Alshouny
Ahmed Alshouny