Accurate very short-term load forecasting (VSTLF) is critical to ensure a secure operation of power systems under increasing uncertainty due to renewables. This study proposes an eXtreme Gradient Boosting (XGBoost)-based VSTLF model that incorporates day-ahead load forecasts (DALF) results and load variation features. DALF results provide trend information for the target time, while load variation, the difference in historical electric load, captures residual patterns. The load reconstitution method is also adapted to mitigate the forecasting uncertainty caused by behind-the-meter (BTM) photovoltaic (PV) generation. Input features for the proposed VSTLF model are selected using Kendall’s tau correlation coefficient and a feature importance score to remove irrelevant variables. A case study with real data from the Korean power system confirms the proposed model’s high forecasting accuracy and robustness.
The integration of electric vehicles (EVs) and fuel-cell electric vehicles (FCEVs) requires accessible and profitable facilities for fast charging. To promote fast-charging stations (FCSs), a systematic analysis that encompasses both planning and operation is required, including the incorporation of multi-energy resources and uncertainty. This paper presents an optimization framework that addresses a joint strategy for the configuration and operation of an EV/FCEV fast-charging station (FCS) integrated with distributed energy resources (DERs) and hydrogen systems. The framework incorporates uncertainties related to solar photovoltaic (PV) generation and demand for EVs/FCEVs. The proposed joint strategy comprises a four-phase decision-making framework. Phase 1 involves modeling EV/FECE demand, while Phase 2 focuses on determining an optimal long-term infrastructure configuration. Subsequently, in Phase 3, the operator optimizes daily power scheduling to maximize profit. A real-time uncertainty update is then executed in Phase 4 upon the realization of uncertainty. The proposed optimization framework, formulated as mixed-integer quadratic programming (MIQP), considers configuration investment, operational, maintenance, and penalty costs for excessive grid power usage. A heuristic algorithm is proposed to solve this problem. It yields good results with significantly less computational complexity. A case study shows that under the most adverse conditions, the proposed joint strategy increases the FCS owner’s profit by 3.32% compared with the deterministic benchmark.