The high proportion of renewable energy connected to the grid has resulted in insufficient consumption capacity in distribution networks, while the construction of new-type power distribution systems has imposed higher reliability requirements. With its flexible power synchronization control capabilities, grid-forming energy storage systems possess the ability to both promote the consumption of distributed energy resources in new-type distribution networks and enhance their reliability. However, current control methods are still hindered by drawbacks such as high computational complexity and a singular optimization objective. To address this, this paper proposes an optimized strategy for unified active–reactive power coordinated control in high-proportion renewable energy distribution networks with the participation of multiple grid-forming energy storage systems. Firstly, to optimize the parameters of grid-forming energy storage systems more accurately, this paper employs an improved iterative self-organizing data analysis technique algorithm to generate typical scenarios consistent with the scheduling time scale. Quantile regression (QR) and Gaussian mixture model (GMM) clustering are utilized to generate typical scenarios for renewable energy output. Subsequently, considering operational constraints and equipment state constraints, a unified active–reactive power coordinated control model for the distribution network is established. Meanwhile, to ensure the optimality of the results, this paper adopts an improved northern goshawk optimization (NGO) algorithm to solve the model. Finally, the effectiveness and feasibility of the proposed method are validated and illustrated through an improved IEEE-33 bus test system tested on MATLAB 2024B. Through analysis, the proposed method can reduce the average voltage fluctuation by 6.72% and increase the renewable energy accommodation rate by up to 8.64%.
This paper investigates the multi-objective siting and sizing problem of a transformer–energy storage deeply integrated system (TES-DIS) that serves as a grid-side common interest entity. This study is motivated by the critical role of energy storage systems in generation–grid–load–storage resource allocation and the superior capability of artificial intelligence algorithms in addressing multi-dimensional, multi-constrained optimization challenges. A multi-objective optimization model is first formulated with dual objectives: minimizing voltage deviation levels and comprehensive economic costs. To overcome the limitations of conventional methods in complex power systems—particularly regarding solution quality and convergence speed—an enhanced Q-learning with hybrid guidance algorithm is proposed. The improved algorithm demonstrates strengthened local search capability and accelerated late-stage convergence performance. Validation using a real-world urban power grid in China confirms the method’s effectiveness. Compared to traditional approaches, the proposed solution achieves optimal TES-DIS planning through autonomous learning, demonstrating (1) 70.73% cost reduction and (2) 89.85% faster computational efficiency. These results verify the method’s capability for intelligent, simplified power system planning with superior optimization performance.
Parallel grid-forming energy storage converters based on virtual synchronous generator (VSG) control are prone to active power oscillation and interphase circulating current under load disturbance, unit switching, and parameter mismatch conditions. To address these problems, this paper proposes a dual-layer damping control strategy that combines adaptive virtual damping in the power loop with capacitor current feedback damping in the current loop. First, the small-signal models of the LCL filter, VSG power loop, and parallel converter system are established, and the dominant oscillation modes are analyzed using eigenvalue and participation factor methods. Then, an adaptive damping coefficient is designed according to the active power deviation and frequency dynamic response to suppress low-frequency power oscillation, while a capacitor current feedback branch is introduced to reshape the LCL filter’s resonant poles and attenuate circulating current resonance. Compared with the conventional fixed-damping VSG control, the proposed method reduces active power overshoot and accelerates power redistribution under load step and unit switching conditions. In the traditional control case, the active power peaks of VSG1 and VSG2 reach approximately 30 kW and 40 kW, with an oscillation period of about 1.8 s, whereas the proposed strategy suppresses the oscillatory process and enables the output powers to rapidly reach the preset sharing ratio. In addition, the system frequency can recover to the rated value of 50 Hz without obvious steady-state deviation, and the high-frequency component of the grid-connected current and the interphase circulating current are significantly attenuated. MATLAB/Simulink simulation results verify that the proposed dual-layer damping strategy provides better power oscillation suppression, circulating current mitigation, and frequency dynamic performance than the conventional VSG control.