In this paper, we propose an operational effectiveness evaluation method of the swarming UAVs air combat system. The system network model is firstly established before the evaluation. We divide the edges in the network into nine types according to the Generalized Operation Loop and give the edge attribute of operational information entropy based on node attributes. When calculating the system operational effectiveness, we focus on the striking ability and propose the concept of Operation Loop Capability to represent the target-attack effectiveness of a certain operational loop, which can be calculated from the edge operational information entropies. We can get the combat effectiveness to a certain target from the Operation Loop Capability, and the combat effectiveness of the swarming UAVs air combat system is represented by the sum of the striking capabilities to all targets. Finally, the scene of swarming UAVs air combat is taken as a case study to apply and verify our evaluation method. This paper gives a quantitative perspective on swarming UAVs combat system assessment and can help to analyze the contribution of UAVs and other weapons in the system.
Rework is a sub-task within equipment development tasks that is revised after initial completion to meet task requirements. Some sub-tasks require multiple rework iterations due to their uncertainty and complexity, or the technology and process needs of the overall task, resulting in inefficient task implementation and resource wastage. Therefore, studying the impact of rework iterations on the duration and cost of development tasks is worthwhile. This study divides rework into foreseeable and hidden types and uses several methods to express and quantify their parameters. The main influencing factors in rework iterations—the uncertainty and complexity of the development task—are quantitatively analyzed. Then, mathematical and mapping models of the dependence between sub-tasks, uncertainty, complexity, and rework parameters are established. The impacts of rework type and rework parameters on the duration and cost of equipment development tasks are analyzed via simulation based on the design structure matrix (DSM). Finally, an example is used to illustrate the influence of different rework types and rework parameters on development tasks’ duration and cost. The results show that the duration and cost of development tasks are greater, their volatility range is wider, and the distribution is more dispersed when both foreseeable and hidden rework are considered.