Hongzhi Mao

Dr. Hongzhi Mao

orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
29 May 2020 in Bulletin of Environmental Contamination and Toxicology
Verified
Journal Article
Closed access
PDF file
CFChengran Fang
Chengran Fang
BCBinhui Chen
Binhui Chen
HZHaifeng Zhuang
Haifeng Zhuang
HMHongzhi Mao
Hongzhi Mao

1 January 2020 in Chinese Journal of Chemical Engineering
Verified
Journal Article
Closed access
QWQun Wang
Qun Wang
LJLanhui Jiang
Lanhui Jiang
CFChengran Fang
Chengran Fang
HMHongzhi Mao
Hongzhi Mao
HZHaifeng Zhuang
Haifeng Zhuang

29 March 2025 in Renewable Energy
Verified
Journal Article
Closed access
HMHongzhi Mao
Hongzhi Mao
WLWeili Liu
Weili Liu
XCXie Chen
Xie Chen
Zhiyong TianZhiyong Tian
Zhiyong Tian
AZAngelo Zarrella
Angelo Zarrella
Wentao WuWentao Wu
Wentao Wu

17 September 2025 in Buildings
Verified
Journal Article
Open access
PDF file
YHYue Hu
Yue Hu
YLYuce Liu
Yuce Liu
YZYu Zhang
Yu Zhang
HDHongwei Dong
Hongwei Dong
CLChongzheng Li
Chongzheng Li
MWMeng Wang
Meng Wang
Against the global backdrop of energy transition, the precise assessment of urban rooftop photovoltaic (PV) system capacity is recognized as crucial for optimizing the energy structure and enhancing the sustainable utilization efficiency of spatial resources. Publicly available aerial imagery is characterized by non-orthorectified issues; direct utilization is known to lead to geometric distortions in rooftop PV and errors in capacity prediction. To address this, a dual-optimization framework is proposed in this study, integrating monocular vision-based 3D reconstruction with a lightweight linear model. Leveraging the orthogonal characteristics of building structures, camera self-calibration and 3D reconstruction are achieved through geometric constraints imposed by vanishing points. Scale distortion is suppressed via the incorporation of a multi-dimensional geometric constraint error control strategy. Concurrently, a linear capacity-area model is constructed, thereby simplifying the complexity inherent in traditional multi-parameter fitting. Utilizing drone oblique photography and Google Earth public imagery, 3D reconstruction was performed for 20 PV-equipped buildings in Wuhan City. Two buildings possessing high-precision field survey data were selected as typical experimental subjects for validation. The results demonstrate that the 3D reconstruction method reduced the mean absolute percentage error (MAPE)—used here as an estimator of measurement uncertainty—of PV area identification from 10.58% (achieved by the 2D method) to 3.47%, while the coefficient of determination (R2) for the capacity model reached 0.9548. These results suggest that this methodology can provide effective technical support for low-cost, high-precision urban rooftop PV resource surveys. It has the potential to significantly enhance the reliability of energy planning data, thereby contributing to the efficient development of urban spatial resources and the achievement of sustainable energy transition goals.