Yuhui Jin

Dr. Yuhui Jin

orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 April 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
DLDunwen Liu
Dunwen Liu
XZXiaotian Zhang
Xiaotian Zhang
YTYu Tang
Yu Tang
YJYuhui Jin
Yuhui Jin
KCKunpeng Cao
Kunpeng Cao
With the acceleration of transportation infrastructure and the densification of transportation networks, there has been an increase in bridge pile construction near oil and gas pipelines. Selecting bridge pile construction methods with minimal impact and reducing the adverse effects of bridge pile construction on nearby oil and gas pipelines are of great importance. This paper uses FLAC3D 6.0 software to simulate and analyze the impact of two different pile construction methods, rotary drilling and impact drilling, on adjacent oil pipelines. The results show that the horizontal displacement of oil pipelines during rotary drilling construction is nearly 90% lower than that of the traditional impact drilling method, and the axial stress is reduced by nearly 85%. Furthermore, numerical simulations of rotary drilling under different conditions were conducted to analyze and summarize the patterns of how different conditions affect construction vibration and stress. This study provides a reference for bridge pile construction near oil and gas pipelines or important buildings.