Deborah Horton

Ms. Deborah Horton

orcid

Research Focus & Metrics

Academic Career Length

36Years (1991-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 September 2022 in Drones
Verified
Journal Article
Open access
PDF file
JDJairaj Chetas Desai
Jairaj Chetas Desai
JMJijo K. Mathew
Jijo K. Mathew
YZYunchang Zhang
Yunchang Zhang
RHRobert Hainje
Robert Hainje
DHDeborah Horton
Deborah Horton
DBDarcy Bullock
Darcy Bullock
Many public safety agencies in the US have initiated a UAS-based procedure to document and map crash scenes. In addition to significantly reducing the time taken to document evidence as well as ensuring first responder safety, UAS-based mapping reduces incident clearance time and thus the likelihood of a secondary crash occurrence. There is a wide range of cameras used on these missions, but they are predominantly captured by mid-priced drones that cost in the range of $2000 to $4000. Indiana has developed a centralized processing center at Purdue University that has processed 252 crash scenes, mapped using 29 unique cameras, from 35 public agencies over the past three years. This paper includes a detailed case study that compares measurements obtained from a traditional ground-based real-time kinematic positioning base station and UAS-based photogrammetric mapping. The case study showed that UAS derived scale errors were within 0.1 ft (3 cm) of field measurements, a generally accepted threshold for public safety use cases. Further assessment was done on the 252 scenes using ground control scale error as the evaluation metric. To date, over 85% of the measurement errors were found to be within 0.1 ft (3 cm). When substantial errors are identified by the Purdue processing center, they are flagged for further dialog with the agency. In most of the cases with larger errors, the ground control distance was incorrectly measured, which is easily correctable by returning to the scene and performing new distance control measurements.

9 November 2023 in Future Transportation
Verified
Journal Article
Open access
PDF file
JDJairaj Chetas Desai
Jairaj Chetas Desai
JMJijo K. Mathew
Jijo K. Mathew
HLHowell Li
Howell Li
Rahul Suryakant SakhareRahul Suryakant Sakhare
Rahul Suryakant Sakhare
DHDeborah Horton
Deborah Horton
DBDarcy Bullock
Darcy Bullock
Traditional techniques of monitoring roadway mobility during winter weather have relied on embedded road sensors, roadside cameras, radio reports from public safety staff, or public incident reports. However, widely available connected vehicle (CV) data provides government agencies and media with a unique opportunity to monitor the mobility impact of inclement weather events in near real-time. This study presents such a use case that analyzed over 500 billion CV records characterizing the spatial and temporal impact of a winter storm that moved across the country from 21 to 26 December 2022. The analysis covered 97,000 directional miles of interstate roadway and processed over 503 billion CV records. At the storm’s peak on 22 December at 5:26 PM Eastern Time, nearly 4800 directional miles of interstate roadway were operating under 45 mph, a widely accepted indicator of degraded interstate conditions. The study presents a methodological approach to systematically assess the mobility impact of this winter event on interstate roadways at a national and regional level. The paper then looks at a case study on Interstate 70, a 4350 directional mile route passing through ten states. Statewide comparison showed Ohio was most impacted, with 9% of mile-hours operating below 45 mph on 23 December. High-Resolution Rapid Refresh weather data provided by the National Oceanic and Atmospheric Administration was integrated into the analysis to provide a visualization of the storm’s temporal path and severity. We believe the proposed metrics and visualizations are effective tools for communicating the severity and geographic impact of extreme weather events to broad non-technical audiences.

20 October 2025 in IEEE Access
Verified
Journal Article
Open access
SHSungwoong Hyung
Sungwoong Hyung
JDJairaj Chetas Desai
Jairaj Chetas Desai
RHRobert Hainje
Robert Hainje
DHDeborah Horton
Deborah Horton
Ayman HabibAyman Habib
Ayman Habib
DBDarcy Bullock
Darcy Bullock
Crash scene mapping is an important activity performed by law enforcement at fatal and serious bodily injury crashes. In 2019, the Indiana Criminal Justice Institute initiated a program with Purdue University to develop training and centralized image processing of Unmanned Aircraft System (UAS) missions. During this period, the center conducted 77 training sessions for 2773 participants, at 24 locations, for 64 agencies. Public safety personnel that have participated in this training have submitted 732 scenes, through June 30, 2025. The number of UAS images submitted by an agency for a scene varies somewhat based upon scene size and agency practices, but the median number of images submitted was 177 and the median duration of flight missions was 11 minutes. The orthomosaic images produced by the mapping center had a median ground sampling distance of 0.1 cm (0.039 in) and a scale measurement error of 2.13 cm (0.83 in). Not surprising, as agencies became more experienced in UAS image acquisition, the mapping accuracy improved. Agencies that routinely submitted more than 5 scenes per year had scenes with even better scale measurement errors, with 95% of the scenes having scale measurement errors less than 1.16 cm (0.45 in). The training courses and centralized processing of the center provided a mechanism for agile feedback to agencies on opportunities to improve their field procedures and was particularly valuable to smaller public safety agencies that did not have resources for processing UAS images.


1 January 2025
Verified
Report
Closed access
MOMyles Overall
Myles Overall
JMJustin Mukai
Justin Mukai
Rahul Suryakant SakhareRahul Suryakant Sakhare
Rahul Suryakant Sakhare
JDJairaj Chetas Desai
Jairaj Chetas Desai
DHDeborah Horton
Deborah Horton
DBDarcy Bullock
Darcy Bullock
From July 2023 to July 2025, the team has performed several dozen after-action reviews of interstate work zones and the associated maintenance of traffic (MOT). These after-action reports generally contain the following information: Date, location, visual images, connected vehicle summary graphics, qualitative discussion of activity, and in some cases press releases or media posts. In general, these themes emerged: 1. MOT plans in some cases do not accurately capture the geometry constraints placed by bridges, guardrail and or barrier wall. It is important that design reviews place careful focus on ensuring lane widths, shoulders, and shoulder treatments fit across the entire cross section of each phase or requests for design exceptions be initiated. In some cases, performing some type of LiDAR survey prior to design may assist MOT designers in effectively capturing more accurate location and dimensions of existing geometrics, particularly edge of pavement, edge of bridge, guardrails, and embankments. 2. When lane shifts are initiated, the designers should examine the path of the vehicle at both the start and end of the transition. In some cases, the end of the transition occurs quite close to either a guardrail or narrow section of pavement. In some cases, either gentler transitions or additional horizontal clearance should be considered. 3. There is relatively little dialog between the temporary traffic control contractors and designers on what are the best practices and requirements for implementing a change in MOT. 4. To sustain this engagement between designers, and MOT contractors, it is recommended that selected projects include MOT review with design engineers, and contractor as part of the close out process to document lessons learned. 5. Rolling slows downs have a role in MOT, but there appears to be inconsistent use of rolling slowdowns for short term closures. It is recommended that requirements for rolling slowdowns be identified in the MOT plans. If contractors are required to use rolling slowdowns not documented in MOT plans, they should be required to obtain approval from the Indiana Department of Transportation and notify the Traffic Management Center. 6. Barrier walls are an important tool for MOT. However, their set up can have significant impact on traffic capacity and create queues. Project plans should define days/time periods these are permitted to be installed and/or removed.