Sara Walker

Dr. Sara Walker

School of Engineering, Newcastle University, Newcastle upon Tyne NE1 7RU, United Kingdom
orcid

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 August 2022 in Engineering Applications of Artificial Intelligence
Verified
Journal Article
Closed access
MKMohamad Khalil
Mohamad Khalil
AMA. Stephen McGough
A. Stephen McGough
ZPZoya Pourmirza
Zoya Pourmirza
MPMehdi Pazhoohesh
Mehdi Pazhoohesh
Sara WalkerSara Walker
Sara Walker

1 July 2021 in Renewable and Sustainable Energy Reviews
Verified
Journal Article
Closed access
ABA.E.H. Berjawi
A.E.H. Berjawi
Sara WalkerSara Walker
Sara Walker
CPC. Patsios
C. Patsios
SHS.H.R. Hosseini
S.H.R. Hosseini


1 June 2014 in Energy Research & Social Science
Verified
Journal Article
Closed access
Sara WalkerSara Walker
Sara Walker
DLD. Lowery
D. Lowery
KTK. Theobald
K. Theobald

28 October 2020 in IEEE Access
Verified
Journal Article
Open access
Ling Ai WongLing Ai Wong
Ling Ai Wong
VRVigna Kumaran Ramachandaramurthy
Vigna Kumaran Ramachandaramurthy
Sara WalkerSara Walker
Sara Walker
Janake EkanayakeJanake Ekanayake
Janake Ekanayake
This paper suggests a method to place and size the battery energy storage system (BESS) optimally to minimise total system losses in a distribution system. Subsequently, the duck curve phenomenon is taken into consideration while determining the location and sizing. The locations and sizing of BESS were optimised using a metaheuristic algorithm with high exploration and exploitation ability which is known as the Whale Optimisation Algorithm (WOA). Meanwhile, the performance of WOA was validated using other algorithms, i.e., Particle Swarm Optimisation and Firefly Algorithm. The results demonstrated the capability of WOA to determine the optimal BESS location and sizing for all cases, with and without considering the duck curve issue for loss reduction. Besides that, the duck curve issue can be mitigated by appropriately optimising the energy storage system (ESS) to reduce the steep ramp of the duck neck and ducktail and to lift the duck belly. In conclusion, although less loss reduction was achieved as a tradeoff to fulfil the constraint on net load ramp limit, the required BESS sizing was much smaller than the case without those constraints and charging operation, which makes this solution economically viable.

17 October 2024 in Renewable and Sustainable Energy Reviews
Verified
Journal Article
Open access
TZTong Zhang
Tong Zhang
MQMeysam Qadrdan
Meysam Qadrdan
JWJianzhong Wu
Jianzhong Wu
BCBenoit Couraud
Benoit Couraud
MSMartin Stringer
Martin Stringer
GSGoran Strbac
Goran Strbac