Nelson Morales

Prof. Dr. Nelson Morales

Advanced Mining Technology Center, University of Chile, Santiago 8370448, Chile

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 February 2019 in Minerals
Verified
Journal Article
Open access
PDF file
NMNelson Morales
Nelson Morales
SSSebastián Seguel
Sebastián Seguel
ACAlejandro Cáceres
Alejandro Cáceres
Enrique JelvezEnrique Jelvez
Enrique Jelvez
MAMaximiliano Alarcón
Maximiliano Alarcón
Long-term open-pit mine planning is a critical stage of a mining project that seeks to establish the best strategy for extracting mineral resources, based on the assumption of several economic, geological and operational parameters. Conventionally, during this process it is common to use deterministic resource models to estimate in situ ore grades and to assume average values for geometallurgical variables. These assumptions cause risks that may negatively impact on the planned production and finally on the project value. This paper addresses the long-term planning of an open-pit mine considering (i) the incorporation of geometallurgical models given by equiprobable scenarios that allow for the assessing of the spatial variability and the uncertainty of the mineral deposit, and (ii) the use of stochastic integer programming model for risk analysis in direct block scheduling, considering the scenarios simultaneously. The methodology comprises two stages: pit optimization to generate initial ultimate pit limit per scenario and then to define a single ultimate pit based on reliability, and stochastic life-of-mine production scheduling to define block extraction sequences within the reliability ultimate pit to maximize the expected discounted value and minimize the total cost of production objective deviations. To evaluate the effect of the geometallurgical information, both stages consider different optimization strategies that depend on the economic model to be used and the type of processing constraints established in the scheduling. The results show that geometallurgical data with their associated uncertainties can change the decisions regarding pit limits and production schedule and, consequently, to impact the financial outcomes.

29 June 2020 in Minerals
Verified
Journal Article
Open access
PDF file
Mohammad MalekiMohammad Maleki
Mohammad Maleki
Enrique JelvezEnrique Jelvez
Enrique Jelvez
Xavier EmeryXavier Emery
Xavier Emery
NMNelson Morales
Nelson Morales
Production planning decisions in the mining industry are affected by geological, geometallurgical, economic and operational information. However, the traditional approach to address this problem often relies on simplified models that ignore the variability and uncertainty of these parameters. In this paper, two main sources of uncertainty are combined to obtain multiple simulated block models in an iron ore deposit that include the rock type and seven quantitative variables (grades of Fe, SiO2, S, P and K, magnetic ratio and specific gravity). To assess the effect of integrating these two sources of uncertainty in mine planning decision, stochastic and deterministic production scheduling models are applied based on the simulated block models. The results show the capacity of the stochastic mine planning model to identify and minimize risks, obtaining valuable information in ore content or quality at early stages of the project, and improving decision-making with respect to the deterministic production scheduling. Numerically speaking, the stochastic mine planning model improves 6% expected cumulative discounted cash flow and generates 16% more iron ore than deterministic model.

18 March 2020 in Optimization and Engineering
Verified
Journal Article
Closed access
PDF file
FMFabián Manríquez
Fabián Manríquez
JPJavier Pérez
Javier Pérez
NMNelson Morales
Nelson Morales

1 April 2018 in REM - International Engineering Journal
Verified
Journal Article
Open access
PCPedro Henrique Alves Campos
Pedro Henrique Alves Campos
ICIvo Eyer Cabral
Ivo Eyer Cabral
COCarlos Enrique Arroyo Ortiz
Carlos Enrique Arroyo Ortiz
NMNelson Morales
Nelson Morales
Historically, since the 60's, traditional mine planning consists of several distinct stages:

6 July 2021 in HAL
Verified
Preprint
Open access
PDF file
GNGonzalo Nelis
Gonzalo Nelis
FMFrédéric Meunier
Frédéric Meunier
NMNelson Morales
Nelson Morales
In this work we propose a novel approach to solve the mining cut definition problem in open pit mines with geometallurgical interactions. Mining cut definition deals with the aggregation of blocks into clusters which are extracted and processed as a single unit. The aggregation must fulfill operational considerations given by the loading equipment selectivity and should maximize the objectives given by the mine operation. The proposed approach utilizes mixed integer programming and a model inspired by column generation that, contrarily to previous works, has its decision variables defined directly on the set of all feasible cuts. The advantage of this is that the model does not require linear approximations of the geometallurgical behavior of the cuts based on the blocks it contains, and therefore, can utilize any non-linear function. We apply our methodology to a real-size case study to show that the model can be solved in reasonable time, but also that non-linear recovery functions influence the destination policy and expected profit, i.e., that following the traditional free selection policy (based on cutoff grade) is not the best strategy when realistic geometallurgical interactions are considered.