Stefan Winter

Dr. Stefan Winter

orcid

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 September 2014 in Journal of Civil Structural Health Monitoring
Verified
Journal Article
Closed access
PDF file
KHKlaudius Henke
Klaudius Henke
RPRobert Pawlowski
Robert Pawlowski
PSPeter Schregle
Peter Schregle
SWStefan Winter
Stefan Winter

7 June 2022 in Bulletin of Earthquake Engineering
Verified
Journal Article
Open access
PDF file
LBLorenzo Badini
Lorenzo Badini
SOStephan Ott
Stephan Ott
PAPatrik Aondio
Patrik Aondio
SWStefan Winter
Stefan Winter
In this study a timber-based integrated solution is presented to solve at once common issues affecting typical reinforced concrete (RC) existing buildings, such as seismic and energy performances, providing an eco-friendly alternative to steel external bracing systems. Cross-laminated timber (CLT) walls are provided perpendicularly to the external façades as strengthening elements while interposed CLT slabs are foreseen at each floor level to host new architectural units together with a new envelope. While the connections to the foundations and to the existing RC frames are provided respectively with steel brackets and axial-connectors distributed along the height of the building, a post-tensioned connection, between CLT panels (PT-CLT connection), is implemented in the system to guarantee resistance to horizontal actions acting parallel to existing façades with consequent structural independence and architectural freedom. On this regards a first look at the findings of an experimental campaign carried on the Technical University of Munich are presented. A numerical model is developed with finite element software characterizing each type of connector for linear and non-linear analyses. Modal analyses with response spectrum are performed to verify structural elements and connectors, while pushover analyses with target displacement checks are performed to assess the obtained seismic improvement. Finally, the preassembled architectural components that allow to renovate the envelope and the provided assembly procedure are revealed.

2 January 2013 in Bautechnik
Verified
Journal Article
Closed access
PDF file
SOStephan Ott
Stephan Ott
SLStefan Loebus
Stefan Loebus
SWStefan Winter
Stefan Winter


28 October 2014 in Journal of Civil Engineering and Architecture
Verified
Journal Article
Open access
AHAnnette Hafner
Annette Hafner
SOStephan Ott
Stephan Ott
EBEva Bodemer
Eva Bodemer
SWStefan Winter
Stefan Winter

15 September 2017 in Bautechnik
Verified
Journal Article
Closed access
PDF file
MGMartin Gräfe
Martin Gräfe
CBChristopher Bert
Christopher Bert
SWStefan Winter
Stefan Winter