Contractors are the main implementers to achieve green construction, and the contractor’s green construction capability (CGCC) is far-reaching for green construction. Research on CGCC exists in a number of disciplines, with major contributions in construction management, environment management, and sustainable management research. Despite the fact that CGCC is widely utilised in both research and practice, its formation and action mechanism remain obscure due to the multi-disciplinary nature of CGCC. This study is motivated by this research gap. This study conducted a comprehensive investigation of CGCC by using a systematic review covering 74 relevant publications published from 2005 to the first half of 2022. Five main research clusters were identified: (1) CGCC implementation; (2) CGCC performance; (3) CGCC profound impact; (4) CGCC and green building; and (5) CGCC and sustainability. Existing research collaborations on CGCC are infrequent, although this is an area of research that requires multi-disciplinary collaboration. Studies such as CGCC enhancement mechanisms and evaluation systems have received less attention. An integrative framework was proposed for future scholars to build upon as well as a guidance for executives.
The active involvement of private sectors in Public-Private-Partnership (PPP) projects is critical for sustainable development of the PPP mode. While there have been many studies on PPP in the literature, limited research has been conducted to investigate the critical factors that affect the intention of the private sector to participate in PPP projects. To bridge the knowledge gap, this study proposed a theoretical model based upon the theory of planned behavior (TPB), and then tested it based upon empirical data collected from China. Partial least squares structural equation modeling (PLS-SEM) was employed in testing the model. Results indicated that “perceived behavioral control”, “governmental influence”, and “private sectors’ attitude toward PPP” were the three most significant latent variables affecting the intention of private sectors to participate in PPP projects; and “financial capability”, “full compliance with PPP contracts”, and “profitability” were the three most significant observable variables affecting the intention of the private sector. The research findings contribute to the body of knowledge about private sector involvement in PPP projects in a Chinese context, and also provide solid support for the government to issue relevant polices or undertake reforms to attract more private sectors to participate in the PPP projects.
Smart Construction Sites (SCS) are important drivers for the construction of high-quality development. In order to determine the evolution of SCS advancement systems, an evolutionary game model consisting of government, enterprises and projects was constructed. The experimental simulations were performed by using a system dynamics approach. The findings were as follows: (1) There are three stable equilibrium strategies in the evolution of the game system: government, enterprises and projects all adopt positive strategies; government intervention, enterprises’ advancement, and projects’ non-participation; and government intervention, enterprises and projects adopting negative strategies. (2) Government penalties and balance of interests between enterprises and projects are the main factors affecting the evolution. (3) In the state (1,1,1), the influence of a government regulatory system is more significant in encouraging enterprises to promote SCS and projects to participate in building an SCS platform. (4) Government rewards and penalties, costs and benefits of corporate support for SCS, benefits when projects do not participate in SCS, are the main factors influencing the adoption of proactive strategies by companies and projects, and there are significant differences in the strategic directions and marginal impacts of each factor on stakeholders’ choices. These findings provide a reference for further refining stakeholder theory and for promoting the sustainable development of SCS.
1 March 2024 in Journal of Construction Engineering and Management
A major railway project is a complex, giant system with multi-party participation, one characterized by complex geological conditions, long construction periods and large scale, which leads to an increased likelihood of safety risk events during construction. In order to solve the problem of scientific selection and formulation of safety risk prevention and control strategies for major railway projects, an auxiliary selection method of safety risk prevention and control strategies for major railway projects based on weighted Euclidean distance (WED) is proposed. The relevant ontology is used to conceptualize and formalize the knowledge of safety risks of major railroad projects, and combine the characteristics of major railroad projects; it refers to the prevention and control measures of historical safety risk events associated with major railroad projects, and then constructs the knowledge structure and case base around safety risks of major railroad projects and the circumstances of the case. In determining the comprehensive weights, the G1 method is used to determine the subjective weights, the anti-entropy weight method is used to determine the objective weights and game theory combines the subjective and objective weights. In comparing the array of safety risk prevention and control cases associated with major railway projects, the weighted Euclidean distance is used to calculate the similarity between these cases and the target case, which in turn assists project managers in determining the safety risk prevention and control strategies appropriate for major railway projects. This study takes Landslide No. 1 in the Tunnel A inlet planning area as an example. It utilizes the WED method to assist in selecting safety risk prevention and control strategies for major railway projects, which verifies the method’s feasibility. The proposed method enriches the method of the assisted selection of safety risk prevention and control strategies for major railway projects, makes strategy formulation more scientific, has specific reference significance for the formulation of safety risk prevention and control strategies for major railway projects, and promotes the improvement of safety risk prevention and risk control for participating units.