Contractors are the main implementers to achieve green construction, and the contractor’s green construction capability (CGCC) is far-reaching for green construction. Research on CGCC exists in a number of disciplines, with major contributions in construction management, environment management, and sustainable management research. Despite the fact that CGCC is widely utilised in both research and practice, its formation and action mechanism remain obscure due to the multi-disciplinary nature of CGCC. This study is motivated by this research gap. This study conducted a comprehensive investigation of CGCC by using a systematic review covering 74 relevant publications published from 2005 to the first half of 2022. Five main research clusters were identified: (1) CGCC implementation; (2) CGCC performance; (3) CGCC profound impact; (4) CGCC and green building; and (5) CGCC and sustainability. Existing research collaborations on CGCC are infrequent, although this is an area of research that requires multi-disciplinary collaboration. Studies such as CGCC enhancement mechanisms and evaluation systems have received less attention. An integrative framework was proposed for future scholars to build upon as well as a guidance for executives.
Smart Construction Sites (SCS) are important drivers for the construction of high-quality development. In order to determine the evolution of SCS advancement systems, an evolutionary game model consisting of government, enterprises and projects was constructed. The experimental simulations were performed by using a system dynamics approach. The findings were as follows: (1) There are three stable equilibrium strategies in the evolution of the game system: government, enterprises and projects all adopt positive strategies; government intervention, enterprises’ advancement, and projects’ non-participation; and government intervention, enterprises and projects adopting negative strategies. (2) Government penalties and balance of interests between enterprises and projects are the main factors affecting the evolution. (3) In the state (1,1,1), the influence of a government regulatory system is more significant in encouraging enterprises to promote SCS and projects to participate in building an SCS platform. (4) Government rewards and penalties, costs and benefits of corporate support for SCS, benefits when projects do not participate in SCS, are the main factors influencing the adoption of proactive strategies by companies and projects, and there are significant differences in the strategic directions and marginal impacts of each factor on stakeholders’ choices. These findings provide a reference for further refining stakeholder theory and for promoting the sustainable development of SCS.
1 March 2024 in Journal of Construction Engineering and Management
A major railway project is a complex, giant system with multi-party participation, one characterized by complex geological conditions, long construction periods and large scale, which leads to an increased likelihood of safety risk events during construction. In order to solve the problem of scientific selection and formulation of safety risk prevention and control strategies for major railway projects, an auxiliary selection method of safety risk prevention and control strategies for major railway projects based on weighted Euclidean distance (WED) is proposed. The relevant ontology is used to conceptualize and formalize the knowledge of safety risks of major railroad projects, and combine the characteristics of major railroad projects; it refers to the prevention and control measures of historical safety risk events associated with major railroad projects, and then constructs the knowledge structure and case base around safety risks of major railroad projects and the circumstances of the case. In determining the comprehensive weights, the G1 method is used to determine the subjective weights, the anti-entropy weight method is used to determine the objective weights and game theory combines the subjective and objective weights. In comparing the array of safety risk prevention and control cases associated with major railway projects, the weighted Euclidean distance is used to calculate the similarity between these cases and the target case, which in turn assists project managers in determining the safety risk prevention and control strategies appropriate for major railway projects. This study takes Landslide No. 1 in the Tunnel A inlet planning area as an example. It utilizes the WED method to assist in selecting safety risk prevention and control strategies for major railway projects, which verifies the method’s feasibility. The proposed method enriches the method of the assisted selection of safety risk prevention and control strategies for major railway projects, makes strategy formulation more scientific, has specific reference significance for the formulation of safety risk prevention and control strategies for major railway projects, and promotes the improvement of safety risk prevention and risk control for participating units.
During the digital transformation of construction projects, the significant volume of project data raise a multitude of data responsibility issues. Project stakeholders, often motivated by financial interests and other considerations, frequently engage in data fraud, namely the alienation of project digital responsibility (APDR), which ultimately hinders the benefits released by the digital transformation of projects. However, the causes of APDR are still unclear. This study aims to bridge this knowledge gap by empirically investigating the factors influencing APDR and delineating their pathways. A model outlining the mechanism of APDR formation, rooted in fraud risk factor theory (FRFT) and information asymmetry theory (IAT), is proposed. To collect data from 276 Chinese construction project practitioners, a questionnaire was meticulously designed. Confirmatory factor analysis (CFA) was subsequently applied to assess the validity of the proposed model. Finally, the proposed model consisting of six variables was examined using structural equation modeling (SEM). The results showed that opportunity (OPP), motivation (MOT), and information asymmetry (INF) had a positive effect on APDR, while exposure probability (EXP), penalty strength (PEN), and ethics (ETH) had a negative effect on APDR. Through revealing the formation mechanism of APDR, the findings are beneficial for understanding why stakeholders adopt APDR at the risk of being penalized. This study aims at deepening the systematic understanding of APDR and enriches the relevant theories on project digital responsibility (PDR). Such knowledge would also contribute to project managers proposing effective interventions to inhibit APDR and promote PDR.
Major railway projects are large-scale infrastructure investments facing significant safety challenges due to complex geological conditions, extreme environments, and uncertain risks. This study integrates resilience theory into railway construction safety management, shifting from traditional risk management (Safety-I) to resilience-based management (Safety-II). A resilience evaluation framework was developed using the 4Rs (robustness, redundancy, resourcefulness, rapidity) and ARRA (absorptive, resistant, restorative, adaptive) capabilities. Adversarial Interpretative Structural Modeling (AISM) and systematic clustering analysis were applied to identify key safety resilience factors and construct an evaluation index system. The findings highlight that optimized personnel allocation, adaptive machinery, standardized material use, comprehensive emergency response, and a stable construction environment are crucial for enhancing safety resilience. The proposed framework provides practical insights for improving safety strategies, minimizing risks, and ensuring sustainable railway infrastructure development.