Qingwei Wang

Qingwei Wang

Auto-generated profile, based on publicly available information

Qingwei Wang


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 September 2025 in Energies
Verified
Journal Article
Open access
PDF file
ZSZhou Shu
Zhou Shu
QWQingwei Wang
Qingwei Wang
Fengzhang LuoFengzhang Luo
Fengzhang Luo
XQXiaoyu Qiu
Xiaoyu Qiu
The large-scale integration of new power loads, such as electric vehicles and energy storage devices, has led to challenges including insufficient regulation capacity and low resource coordination efficiency in low-voltage distribution transformer areas. To address these issues, this paper proposes an optimal configuration model for flexible interconnected distribution transformer areas based on load aggregation. First, a flexible interconnection architecture is constructed using multi-port power electronic conversion devices, enabling mutual power support and voltage stabilization between adjacent areas. Second, a load aggregator scheduling model is established to quantitatively assess the dispatchable potential of electric vehicle charging loads. On this basis, a multi-objective optimization configuration model is formulated with the objectives of minimizing the comprehensive cost of the system and minimizing the average peak-valley difference of substation transformer loads. Case study results demonstrate that the proposed model significantly improves both economic efficiency and operational reliability. Compared to the traditional independent operation mode, the coordinated optimization scheme reduces the comprehensive system cost by 29.6% and narrows the average load peak-valley difference by 50.8%. These findings verify the synergistic effectiveness of flexible interconnection and load aggregation technologies in enhancing equipment utilization, reducing distribution losses, and improving power supply resilience.

6 March 2026 in Energies
Verified
Journal Article
Open access
PDF file
ZSZhou Shu
Zhou Shu
QWQingwei Wang
Qingwei Wang
Fengzhang LuoFengzhang Luo
Fengzhang Luo
ZSZhihui Shan
Zhihui Shan
In the context of high penetration of distributed energy resources and new load integration, existing research primarily focuses on capacity optimization under pre-established interconnection structures, addressing issues such as uneven spatiotemporal distribution of loads and low equipment utilization in distribution transformer areas. However, these studies lack a planning-stage interconnection object selection mechanism. To address this, this paper proposes a planning-oriented flexible interconnection potential assessment and optimization configuration method for distribution transformer areas. First, a quantitative interconnection potential assessment model is developed, integrating load rate improvement after interconnection and geographical connection costs, enabling the ranking and selection of candidate transformer area combinations. On this basis, a flexible interconnection system optimization configuration model is established, aiming to minimize the overall system cost, and collaboratively optimizing converter and energy storage capacities. A case study of 20 distribution transformer areas in a certain city shows that the optimal transformer area combination increases the load factor from 64.6% to 79.4%, an improvement of 22.9%; when considering energy storage configuration, the total economic cost of the interconnection system is reduced by approximately 20.2% compared to the independent operation mode. The results validate the effectiveness of the proposed method in improving equipment utilization and reducing the system’s total lifecycle cost, providing decision support for flexible planning of urban distribution networks.