Yajuan Deng

Dr. Yajuan Deng


Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 May 2026 in Buildings
Verified
Journal Article
Open access
PDF file
YDYajuan Deng
Yajuan Deng
ZFZhang Feng
Zhang Feng
WTWeilun Tao
Weilun Tao
QMQian Meng
Qian Meng
CLChongying Ling
Chongying Ling
Hanwen CuiHanwen Cui
Hanwen Cui
Reducing carbon emissions during construction is essential for meeting dual carbon targets. Current green scheduling methods assume fixed emission factors, overlooking time-dependent variations driven by grid peak-valley patterns. Under interval duration uncertainty coupled with tight dynamic carbon budgets, conventional algorithms struggle with sparse feasible solutions and slow Pareto front convergence. We formulate a bi-objective interval RCPSP model with time-varying carbon emission factors that minimizes both interval makespan and total carbon emissions. A possibility degree measure converts scalar carbon budgets into linearized hard constraints. To solve this NP-hard problem, we propose the Knowledge-Driven Interval Multi-Objective Evolutionary Algorithm (KD-IMOEA), which integrates four components: Knowledge-Driven Initialization (KDI), Adaptive Time-window Carbon-aware Decoding (TCD), Carbon Budget-aware Repair Mutation (CBM), and Interval Pareto Elite Archive (IPA), forming an end-to-end carbon-aware optimization pipeline. We validate KD-IMOEA on J30 through J120 benchmark instances; results show it outperforms four established algorithms, including NSGA-II, in both convergence and distribution, with hypervolume (HV) gains up to 6.3%. A green building case study confirms that KD-IMOEA exploits spatiotemporal decoupling to identify float time and assign energy-intensive machinery to lower-carbon operating profiles. At the optimal compromise makespan of 169.5 days, this strategy cuts carbon emissions by 3.07% over traditional baselines, enabling management-driven emission savings without extending project duration.