Smart design and construction have emerged as pivotal forces in the construction industry. Numerous studies have been conducted in the realm of design optimization, using artificial intelligence data-driven approaches and optimization theories. This increase in research has sparked interest in generative design, a process that automatically generates algorithm-based design alternatives, thereby reducing human effort and time by a significant margin. The objective of this study was to explore the potential of generative design to boost productivity within architectural practices and reduce redundant and unnecessary tasks for an aging construction workforce. Specifically, it illustrates the process of selecting superior alternatives by generating various three-dimensional layouts, using a generative design methodology. This occurs during the creation of a building layout concept with subsequent partial evaluations. The methodology of this study was mainly divided into four stages: objective setting, design algorithm development, the establishment of evaluation methodology, and the comparison of the results’ values. The findings of this study confirmed that the design algorithm and evaluation methodology form a single loop, generating a multitude of design alternatives that satisfy the algorithm designer’s evaluation criteria.
Spatial Allocation Problems (SAP) in multistory buildings present significant challenges, as they require the simultaneous satisfaction of complex geometric constraints and conflicting functional requirements. To address this problem, this study proposes an integrated pipeline utilizing Generative Design (GD) methodologies within a Building Information Modeling (BIM) environment to automate and optimize a 3.3 m modular multi-story spatial allocation. The core of the proposed methodology lies in the clear distinction and application of design requirements formalized as ‘Hard Constraints’ (mandatory conditions for feasibility) and ’Soft Objectives’ (metrics for performance evaluation). Hard constraints include the implementation of a boundary constraint, ensuring that all spaces remain within defined limits, and a vertical alignment constraint for fixed elements (e.g., cores), thereby ensuring geometric and structural validity. To quantify functional efficiency, three soft objectives were defined: positional preference, circulation efficiency, and functional cohesion. The methodology was validated using a four-story case study. The implemented system successfully generated numerous valid design alternatives that satisfied all hard constraints while simultaneously optimizing the three soft objectives. Aimed at architects, building designers, and computational specialists, this study offers significant practical value by providing a tool that automates the complex initial phases of space planning. This allows designers to rapidly explore and quantitatively evaluate a wide array of optimized and valid layouts. This study contributes to a systematic framework for balancing geometric validity and functional efficiency during the early design stages by presenting a concrete procedure for integrating GD and BIM to solve complex SAPs.
Industry Foundation Classes (IFC) files are the main deliverable for the digital safety management of public buildings, but a file that passes a schema check is not necessarily usable. Most checking tools reduce model quality to a single pass/fail result, blame the model for rules that do not apply or are themselves wrong, and drop the objects they could not process. We present a validation framework that keeps these questions distinct: it checks each element separately against the IFC4 schema and the project’s information requirements; reports one of seven verdict states that distinguishes model defects from inapplicable, unspecified, or defective requirements; accounts for every element so that none disappears from the audit; and labels all simplified geometry as authored or derived. Applied to eight production models from two authoring pipelines (5994 elements; 88,499 element–rule pairs), the verdicts were reproducible, agreed with an independent oracle on all 39,334 pairs it could decide, and detected eight of ten injected defect types in every case. Separating the two checks reclassified 274 valid elements of one model from violations to rule gaps, and every model from one pipeline arrived without authored axes. The framework supports procurement-side quality assurance and data-readiness screening for aging public buildings.
Generative design (GD) in Building Information Modelling (BIM) frequently yields infeasible or uninformative alternatives. Within the scope of this study, we examine how GD outcomes relate to preparation before optimization: how placement rules are encoded and how the search space is parameterized so that an evolutionary engine can exploit a stable genotype–phenotype mapping. We present a three-module preparation framework for facility layout GD in BIM, implemented in Dynamo with the NSGA-II-based Revit GD engine. Module A abstracts spaces as rectangular units and maintains a list of valid, unoccupied candidate locations through surface-based containment tests and Boolean-mask filtering. Module B enumerates discrete rotation and adjacency scenarios and prunes true collisions with a tolerance-controlled intersection test (16 of 32 raw scenarios rejected in a worked example). Module C replaces shuffle-based randomization, which re-maps a genotype to a different layout at every evaluation, with a deterministic, locality-preserving normalized-coordinate (UV) encoding. Modules A and B are demonstrated through worked geometric examples and Module C through a synthetic proof-of-concept run with three space groups and piping-length objectives on an irregular site, in which later-generation layouts showed reduced routing values and clustering of connected spaces, consistent with the representational argument. An additional run on the same case connects the three module operations under a restricted rotation–adjacency construction. The framework is offered as a documented preparation protocol bounded by a single illustrative case.
The rapid growth of the semiconductor industry has created a bottleneck in which traditional manual methods for designing fabrication plants (fabs) cannot keep pace with their high complexity and short technological lifecycles. This problem stems from the critical mismatch between a fab’s multiyear construction timeline and the rapidly shrinking lifecycle of the advanced chips it is built to produce. To address this challenge, the present study proposes a methodological framework that uses dynamic generative design within a Building Information Modelling (BIM) environment. This approach applies algorithms to generalized models to generate and evaluate numerous potential design solutions automatically. For facility layouts, the framework produces plans that balance spatial efficiency, material flow, and stringent cleanroom protocols. For complex utility systems, it moves beyond simple clash detection to proactively generate resource-efficient, clash-free routing paths that consider both constructability and long-term maintainability. The primary contribution of this study is a standardized, data-agnostic design process that enhances design quality without requiring sensitive project data, establishing a robust foundation for future Digital Twin integration.
Determining the design elevations of multiple development parcels on rugged terrain is a key cost driver in large-scale site preparation. In practice, however, elevations are still selected largely by manual iteration in commercial software—a process that terminates when a design is acceptable rather than optimal, examines only a few alternatives at days to weeks per cycle, and verifies constructability only after the elevations are fixed. This paper proposes a constructability-aware optimization framework that determines optimal parcel elevations by combining linear programming for cut, fill, and inter-parcel haul volumes with a second-order cone program (SOCP) for slope earthwork, whose volume grows quadratically with elevation differences. Constructability requirements—slope feasibility, retaining wall fallback, and road longitudinal grades—are embedded as constraints rather than checked after the fact. The discrete interface modes are assigned by a deterministic feasibility screening step before the solve, so that each optimization is a convex second-order cone program whose global optimality certificate applies under the assigned modes. The comparative experiments apply the slope term as a cost penalty on every interface (penalty variant); a strict variant that enforces the screened slope footprint constraints raises the material cost by 44.2% and is incompatible with zero off-site exchange on this site. The convex formulation guarantees a global optimum and solves in under one second of solver time (210 model variables) using CVXPY and Gurobi within a Rhino/Grasshopper pipeline. Applied to a 13-parcel semiconductor industrial complex in South Korea with up to 100 m of relief, the computed cut volume of 51.19 million m3 agreed with two independent external estimates to within 0.4%. Ablation experiments showed that prohibiting inter-parcel haul multiplies material cost by 3.4, while slope-aware optimization prices in a further 7.4% that slope-blind designs defer to construction. Against a prescribed fixed surface baseline with identically optimized haulage, the optimized elevations reduce the total material cost by 32.8%. An ε-constraint Pareto analysis quantified the trade-off between cost and maximum elevation difference, supporting transparent, reproducible decision-making in site-grading design.