Epari Ritesh Patro

Dr. Epari Ritesh Patro

Department of Civil and Environmental Engineering, Politecnico di Milano, 20133 Milan, Italy
orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2021 in Energy Conversion and Management
Verified
Journal Article
Open access
Emanuele QuarantaEmanuele Quaranta
Emanuele Quaranta
GAGeorge Aggidis
George Aggidis
Robert BoesRobert Boes
Robert Boes
CCClaudio Comoglio
Claudio Comoglio
CMCarlo De Michele
Carlo De Michele
APAlberto Pistocchi
Alberto Pistocchi

17 May 2021 in Energies
Verified
Journal Article
Open access
PDF file
TKT. S. Kishore
T. S. Kishore
Epari Ritesh PatroEpari Ritesh Patro
Epari Ritesh Patro
VHV S K V Harish
V S K V Harish
Ali Torabi HaghighiAli Torabi Haghighi
Ali Torabi Haghighi
In terms of fuel resource, hydropower possesses a prominent advantage over any other large power plants which burn fossil fuels to generate electricity. Moreover, due to the abundance in resource availability (as a domestic source in small streams and rivers), small hydropower (SHP) plants are showing prominence all over the world. SHP plants have led to improved access to electricity usage in under-developed and developing nations, thereby contributing to sustainable development goals and social empowerment. SHP, as a technology, is regarded as the largest density renewable resource with high adaptability, and low investment costs. The primary objective of the paper is to study and analyze recent developments in SHP technologies with reporting statistical figures in terms of installed capacity and MW potential in several parts of the world. Methodologies adopted by researchers to conduct techno-economic analysis of SHP projects are reviewed. Various costs involved in conducting pre-feasibility studies—such as constructing, maintaining, and sustainably operating SHP projects—are studied. The results of the study indicate cost and regulatory issues are the major factors affecting the growth of the small hydropower sector in many nations. Major impediments to construction, development and deployment of SHP projects, mutually existing among the nations worldwide, are also reported. Technical hindrances include non-availability of the grid and very limited accessibility to SHP sites, emissions due to storage of water, disruptive technologies with limited manpower and non-technical hindrances include discouragement from local bodies and groups, lack of suitable and precise pathways to accomplish SHP goals of a nation, lack of incentives for encouraging private players to invest in SHP projects, complex approval processes, and many more.

15 December 2023 in Journal of Cleaner Production
Verified
Journal Article
Open access
PPPanos Panagos
Panos Panagos
FMFrancis Matthews
Francis Matthews
EPEdouard Patault
Edouard Patault
Carlo De MicheleCarlo De Michele
Carlo De Michele
Emanuele QuarantaEmanuele Quaranta
Emanuele Quaranta
PBPasquale Borrelli
Pasquale Borrelli

21 March 2023 in Solar Energy Materials and Solar Cells
Verified
Journal Article
Open access
BSBade Venkata Suresh
Bade Venkata Suresh
YSYegireddi Shireesha
Yegireddi Shireesha
TKTeegala Srinivasa Kishore
Teegala Srinivasa Kishore
GDGaurav Dwivedi
Gaurav Dwivedi
AHAli Torabi Haghighi
Ali Torabi Haghighi
Epari Ritesh PatroEpari Ritesh Patro
Epari Ritesh Patro

8 August 2022 in Journal of Environmental Management
Verified
Journal Article
Open access
Epari Ritesh PatroEpari Ritesh Patro
Epari Ritesh Patro
Carlo De MicheleCarlo De Michele
Carlo De Michele
GGGianluca Granata
Gianluca Granata
CBChiara Biagini
Chiara Biagini
Sedimentation has a prominent impact on the functionality and lifetime of reservoirs and is a growing concern for stakeholders. Various parameters influence sedimentation caused by soil erosion. Here we have examined fifty Italian reservoirs to determine sedimentation rates and storage capacity loss. The reservoirs studied have an average age of 78 years as of 2021, with the highest loss of capacity observed, equal to 100%, for Ceppo Morelli. For the fifty Italian catchments covering north, south, central and islands of Italy, we found the mean annual sediment yield varying between 17-4000 m3/km2. year. Six of fifty reservoirs studied (Quarto, Colombara, Ceppo Morelli, Fusino, Vodo and Valle di Cadore) are already in a very critical situation in terms of storage capacity loss. Out of the fifty reservoirs, half of them will reach their half-life year by 2050. For example, for the Fusino reservoir located in northern Italy, we observed a loss of 90% of the storage volume as of 2020 with respect to its operation year 1974, compared to 6% in 2015 as available in literature. Modelling the sediment delivery ratio (SDR) is an open question, due to the lack of adequate data and uncertainties about the variability in hydrological, geomorphological, climate and landcover parameters. Here, we addressed the issue with a simplified multiple regression approach based on sediment delivery ratio values retrieved by the RUSLE model. We found different multi regressions for reservoirs belonging to the Alpine and Apennine regions. This analysis offers a starting point for the management and prioritization of adaptation and remediation policies necessary to address reservoir sedimentation.

11 January 2023 in Energies
Verified
Journal Article
Open access
PDF file
Julian D HuntJulian D Hunt
Julian D Hunt
BZBehnam Zakeri
Behnam Zakeri
Jakub JuraszJakub Jurasz
Jakub Jurasz
Wenxuan TongWenxuan Tong
Wenxuan Tong
PDPaweł Bronisław Dąbek
Paweł Bronisław Dąbek
Keywan RiahiKeywan Riahi
Keywan Riahi
Low-carbon energy transitions taking place worldwide are primarily driven by the integration of renewable energy sources such as wind and solar power. These variable renewable energy (VRE) sources require energy storage options to match energy demand reliably at different time scales. This article suggests using a gravitational-based energy storage method by making use of decommissioned underground mines as storage reservoirs, using a vertical shaft and electric motor/generators for lifting and dumping large volumes of sand. The proposed technology, called Underground Gravity Energy Storage (UGES), can discharge electricity by lowering large volumes of sand into an underground mine through the mine shaft. When there is excess electrical energy in the grid, UGES can store electricity by elevating sand from the mine and depositing it in upper storage sites on top of the mine. Unlike battery energy storage, the energy storage medium of UGES is sand, which means the self-discharge rate of the system is zero, enabling ultra-long energy storage times. Furthermore, the use of sand as storage media alleviates any risk for contaminating underground water resources as opposed to an underground pumped hydro storage alternative. UGES offers weekly to pluriannual energy storage cycles with energy storage investment costs of about 1 to 10 USD/kWh. The technology is estimated to have a global energy storage potential of 7 to 70 TWh and can support sustainable development, mainly by providing seasonal energy storage services.
1