Dakanali Eirini

Dr. Dakanali Eirini


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 August 2022 in Energies
Verified
Journal Article
Open access
PDF file
DKDimitris Katsaprakakis
Dimitris Katsaprakakis
APAntonia Proka
Antonia Proka
Dimitrios ZafirakisDimitrios Zafirakis
Dimitrios Zafirakis
MDMarkos Damasiotis
Markos Damasiotis
Panos KotsampopoulosPanos Kotsampopoulos
Panos Kotsampopoulos
DXDimitrios Xevgenos
Dimitrios Xevgenos
Energy transition in islands constitutes a major challenge. Apart from a necessity, it can also be a great opportunity for sustainable social and economic development. Toward this direction, a new, promising movement has emerged recently in Greek islands. Straight from the roots of the insular population, development of energy communities comes as the result of increased awareness of local people, raised also by the legacy of lighthouse projects and initiatives. Kythnos, Ikaria, Sifnos, Tilos, Agios Efstratios, Crete, and Chalki, are all islands that have embraced the implementation of successful, local-scale innovation projects and/or initiatives, generating meaningful results across different energy aspects and contributing to positive social change. Our study provides an overview of the broader energy transition aspects in Greek islands, discusses the impact of the aforementioned exemplary cases, and further elaborates on the model of energy communities. According to our analysis, leveraging on the experience of lighthouse projects and initiatives, and on the dynamics of the emerging energy community movement, could lead to increased social and economic benefits for the insular populations, to broad public acceptance, and to minimum environmental impacts for the islands’ natural ecosystems.

1 May 2020 in Energies
Verified
Journal Article
Open access
PDF file
DKDimitris Katsaprakakis
Dimitris Katsaprakakis
GZGeorge Zidianakis
George Zidianakis
YYYiannis Yiannakoudakis
Yiannis Yiannakoudakis
VMVaggelis Manioudakis
Vaggelis Manioudakis
DEDakanali Eirini
Dakanali Eirini
SKSpyros Kanouras
Spyros Kanouras
This article aims to present the results from studies on the energy performance upgrade of buildings and facilities located in Crete, Greece, in a typical Mediterranean climate. In Mediterranean islands, the most buildings remain uninsulated, classified in C or even lower energy performance rank. In this article four reference buildings and one sports facility are investigated: a residential building, a municipality building, a school building, a museum and the Pancretan Stadium. Detailed calculations based on the computational simulation of each examined facility were executed, giving accurate results on the heating and cooling loads, both for the existing conditions and after the integration of the proposed passive measures. Thorough dimensioning and energy calculations have been executed for specific active energy systems too, particularly proposed for each examined case. With this parametric approach, the article indicates the effect and the economic efficiency of the proposed active or passive measures for each examined facility, expressed with specific key performance indicators. The common conclusion for all investigated cases is the huge margin for energy saving, which can reach 65% with regard to the existing annual consumptions. The payback period of the introduced energy upgrade measures can be as low as 15 years.

4 March 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
DKDimitris Katsaprakakis
Dimitris Katsaprakakis
DEDakanali Eirini
Dakanali Eirini
ADApostolos Dimopoulos
Apostolos Dimopoulos
YGYiannis Gyllis
Yiannis Gyllis
This article aims to present the potential of energy transition in insular systems for social and economic transition and development, when planned and implemented appropriately, with the active involvement of local communities. To this end, the example of Sifnos Energy Community is examined and presented as a pilot case. It proves that energy transition, apart from its obvious energy conservation and climate necessity, can provide a strong contribution to the development of remote areas and the remedying of crucial issues, especially in insular communities, such as unemployment, low standards of living, isolation and energy supply security. Energy transition on Sifnos has been undertaken by the Sifnos Energy Community (SEC), with the target to achieve 100% energy independency through effective and rational projects. The major project is a centralized hybrid power plant consisting of a wind park and a pumped hydro storage system. It was designed to fully cover the current electricity demand and the anticipated forthcoming load due to the overall transition to e-mobility for the transportation sector on the island. Through the exploitation of the excess electricity production with the production of potable water and hydrogen, energy transition can facilitate the development of new professional activities on the island and reduce the local economy’s dependence on tourism. Additionally, a daily link to the neighboring larger Cyclades islands can be established with a hydrogen powered-passenger vessel, ensuring the secure and cheap overseas transportation connection of Sifnos throughout the whole year. The overall energy transition process is executed with the active involvement of the Sifnos citizens, ensuring wide public acceptance and the minimization of the projects’ impacts on the natural and human environment. At the same time, the anticipated benefits for the insular communities are maximized, highlighting the energy transition process on Sifnos as a new sustainable development pattern. For all this effort and the already achieved results, Sifnos has been declared as one of the six pilot islands of the European Community’s initiative “Clean Energy for EU Islands”.

20 April 2022 in Energies
Verified
Journal Article
Open access
PDF file
DKDimitris Katsaprakakis
Dimitris Katsaprakakis
AMApostolos Michopoulos
Apostolos Michopoulos
Vasiliki (Vicky) SkoulouVasiliki (Vicky) Skoulou
Vasiliki (Vicky) Skoulou
DEDakanali Eirini
Dakanali Eirini
AMAngeliki Maragkaki
Angeliki Maragkaki
CCConstantinos Condaxakis
Constantinos Condaxakis
This article proposes a mixture of actions for the development of an effective and rational energy transition plan for all sectors and for all types of onshore final energy use in Crete. Energy transition is initiated with an appropriate capacity building campaign. The plan is based on the introduction of energy saving measures and the exploitation of all the locally available energy resources (wind, solar, geothermal potential, biomass), integrated in a cluster of centralized and decentralized power plants and smart grids to produce electricity and heat and for the transition to e-mobility. The core of the energy transition in Crete will be a set of 14 wind parks and Pumped Hydro Storage systems (PHS) for electricity generation and 12 Combined Heat and Power plants, properly designed and dispersed in the insular territory. Economic analysis is executed for the proposed essential power plants on the island. Biomass, solar and geothermal potential can cover the heating demand in Crete several times. Heat can be produced with a specific cost of 0.05 EUR/kWhth from cogeneration plants fired with solid biomass and biogas. The wind parks-PHS systems exhibit payback periods of approximately 10 years with a final electricity selling price at 0.12 EUR/kWhel. The article shows that 100% energy transition in Crete constitutes a feasible target.

3 November 2025 in Energies
Verified
Journal Article
Open access
PDF file
DKDimitris Katsaprakakis
Dimitris Katsaprakakis
George S. StavrakakisGeorge S. Stavrakakis
George S. Stavrakakis
NSNikolaos Savvakis
Nikolaos Savvakis
DEDakanali Eirini
Dakanali Eirini
YYYiannis Yiannakoudakis
Yiannis Yiannakoudakis
SYSofia Yfanti
Sofia Yfanti
This article presents the accumulated technical and scientific knowledge from energy performance upgrade work in emblematic and essential municipal and public buildings in Crete and the Greek islands, such as the Venetian historical building Loggia, which is used as the Heraklion City Hall, the Natural History Museum of Crete, Pancretan Stadium, the municipal swimming pool of the municipality of Minoa Pediadas, the indoor sports hall in Leros, primary schools, high schools and a cultural center. Each one of the aforementioned buildings has a distinct use, thus covering almost all different categories of municipal or public buildings and facilities. The applied energy performance upgrade process in general terms is: (1) Mapping of the current situation, regarding the existing infrastructure and final energy consumption. (2) Formulation and sizing of the proposed passive measures and calculation of the new indoor heating and cooling loads. (3) Selection, sizing and siting of the proposed active measures and calculation of the new expecting energy sources consumption. (4) Sizing and siting of power and heat production systems from renewable energy sources (RES). Through the work accomplished and presented in this article, practically all the most technically and economically feasible passive and active measures were studied: insulation of opaque surfaces, opening overhangs, natural ventilation, replacement of openings, daylighting solar tubes, open-loop geo-exchange plants, refrigerant or water distribution networks, air-to-water heat pumps, solar thermal collectors, lighting systems, automation systems, photovoltaics etc. The main results of the research showed energy savings through passive and active systems that can exceed 70%, depending mainly on the existing energy performance of the facility. By introducing photovoltaic plants operating under the net-metering mode, energy performance upgrades up to zero-energy facilities can be achieved. The payback periods range from 12 to 45 years. The setup budgets of the presented projects range from a few hundred thousand euros to 7 million euros.

24 June 2025 in Energies
Verified
Journal Article
Open access
PDF file
DKDimitris Katsaprakakis
Dimitris Katsaprakakis
NPNikolaos C Papadakis
Nikolaos C Papadakis
NSNikolaos Savvakis
Nikolaos Savvakis
AVAndreas Vavvos
Andreas Vavvos
DEDakanali Eirini
Dakanali Eirini
CCConstantinos Condaxakis
Constantinos Condaxakis
The Greek islands have been blessed with excellent wind potential, with hundreds of sites featuring annual average wind velocity higher than 8–10 m/s. Due to specific regulations in the legal framework, some GWs of wind parks have been submitted since the late 2000s by a small number of large investors in the Greek islands, favoring the creation of energy monopolies and imposing serious impacts on natural ecosystems and existing human activities. These projects have caused serious public reactions against renewables, considerably decelerating the energy transition. This article aims to summarize the legal points in the Greek framework that caused this distorted approach and present the imposed potential social and environmental impacts. Energy monopolies distort the electricity wholesale market and lead to energy poverty and a low standard of living by imposing higher electricity procurement prices on the final users. The occupation of entire insular geographical territories by large wind park projects causes important deterioration of the natural environment, which, in turn, leads to loss of local occupations, urbanization, and migration by affecting negatively the countryside life. Serious concerns from the local population are clearly revealed through an accomplished statistical survey as well as a clear intention to be engaged in future wind park projects initiated by local stakeholders. The article is integrated with specific proposed measures and actions toward the rational development of renewable energy projects. These refer mainly on the formulation of a truly supportive and just legal framework aiming at remedying the currently formulated situation and the strengthening of the energy communities’ role, such as through licensing priorities, funding mechanisms, and tools, as well as additional initiatives such as capacity-building activities, pilot projects, and extensive activation of local citizens. Energy communities and local stakeholders should be involved in the overall process, from the planning to the construction and operation phase.