Shaodong Li

Dr. Shaodong Li


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 January 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
SZShizhong Zhang
Shizhong Zhang
CRChuangnan Ren
Chuangnan Ren
XGXinyao Gao
Xinyao Gao
YGYongsheng Gao
Yongsheng Gao
LNLianyi Nie
Lianyi Nie
MJMoulie Jiang
Moulie Jiang
Hard roof top-cutting and gob-side roadway retention is an effective way to improve the panel recovery ratio and reduce ground pressure. Based on the condition of Pingmei No.2 Mine, this paper establishes a stability mechanics model for the roof in a trapezoidal top-cutting roadway with inclined coal seam, in order to analyze the factors influencing the stability of the roof. This paper studies the deformation characteristics and control mechanism of the surrounding rock in a trapezoidal top-cutting roadway, and proposes targeted stability control technologies for the surrounding rock. The results showed that: (1) in a trapezoidal top-cutting roadway in the hard roof with inclined coal seam, the tensile stress of the uncut roof was inversely proportional to the coal seam dip angle, roof thickness and top-cutting height, while it was proportional to the top-cutting angle. According to actual engineering conditions, the top-cutting angle and height of the roof of the 21,100-panel were determined to be 10° and 5.0 m, respectively; (2) the special structure of the trapezoidal roadway led to asymmetric stress distribution in the surrounding rock, especially in the roof and rib. Using top-cutting, the pressure relief reduced the roof stress from 6.73 MPa to 2.04 MPa, the high stress zone moved to the inside of the solid coal, and the roof slid and deformed along the top line, showing characteristics of a “large deformation on the top side”; and (3) high-strength long anchor cables were used to reinforce the roof on the cut top side. Telescopic U-shaped steel and windshield cloth were used to block gangue and prevent wind leakage in the roadway. The on-site industrial test measured the maximum subsidence of the roof at 120 mm, and the maximum layer separation was 29 mm. Relative to non-top-cutting methods, the roof and sides showed significantly reduced deformation throughout the mining operations, which verified the reliability of the control technology.

8 December 2025 in Sustainability
Verified
Journal Article
Open access
PDF file
TLTao Luo
Tao Luo
Gangwei FanGangwei Fan
Gangwei Fan
SZShizhong Zhang
Shizhong Zhang
ZKZihan Kong
Zihan Kong
SLShaodong Li
Shaodong Li
ZWZhenxiang Wei
Zhenxiang Wei
Investigating the evolution mechanism of overlying strata fractures during mining and identifying the key factors that influence the development height of water-conducting fracture zones (WCFZs) are essential for preventing roof water inrush disasters, protecting mine water resources, and ensuring safe and sustainable mine development. To investigate the height of WCFZs and the evolution law of roof water inflow in a syncline structure working face under high-confined aquifer conditions, the 203 working face of Gaojiapu Coal Mine in Binchang Coalfield is selected as the engineering case. This paper analyzes the characteristics and control mechanisms of roof water inflow in a syncline structure mining area using UDEC 7.0 and COMSOL Multiphysics 6.0 multiphysics numerical simulation software. The results indicate that under different mining heights and advancing speeds, the height of the WCFZ in the overlying strata of a syncline structure working face continuously increases during the downward mining stage and in areas below the axis, and decreases thereafter, eventually stabilizing after reaching its maximum value at the initial stage of upward mining. When the WCFZ communicates with the strong aquifer of the Cretaceous Luohe Formation during the mining process, roof water inflow into the working face increases abruptly. The effectiveness of controlling water inflow by adjusting mining height is superior to that of controlling mining speed. Based on the response relationship between mining height, mining speed, and roof WCFZ, an on-site drainage prevention strategy was implemented involving reduced mining height and increased mining speed. Consequently, the roof water inflow at the working face has decreased from an initial rate of 950 m3/h to 360 m3/h. This study is of great significance for the safe and efficient extraction of coal seams under high-confined aquifers in the Binchang Coalfield, supporting the efficient development of coal resources while safeguarding regional water resources, thereby offering considerable engineering and practical value in promoting green mining and sustainable mining practices in large-scale coal production bases with similar geological conditions.

7 November 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
MZMingjian Zhang
Mingjian Zhang
HTHaochen Tong
Haochen Tong
SZShizhong Zhang
Shizhong Zhang
SZShizhong Zhang
Shizhong Zhang
ZKZihan Kong
Zihan Kong
CRChuangnan Ren
Chuangnan Ren
To optimize the support performance of rock bolts in high-stress environments, this study employs the ANSYS (Version 2022 R2) finite element numerical simulation method to systematically investigate the influence of bolt geometrical parameters (rib spacing, rib height, and bolt diameter) on the stress state of the anchoring system. A bolt–resin–sleeve model was established to analyze Mises equivalent stress distribution and peaks under a 150 kN pull-out load. The simulation results indicate that a rib spacing of 36 mm effectively promotes the diffusion of pre-stress into deeper regions, with peak stress in the bolt rod and resin ring increasing by 34.42% and 61.64%, respectively, compared to a spacing of 12 mm. Further increase in rib spacing provides limited enhancement in peak stress. A rib height of 1.0 mm achieves optimal system performance without excessively compromising the interfacial stress level. Increasing the diameter to 22 mm raised peak stress in the bolt, sleeve, and resin by 14.19%, 30.48%, and 50.77%, respectively, compared to 18 mm, balancing load capacity and material use efficiently. The optimal parameter set (36 mm spacing, 1.0 mm height, and 22 mm diameter) was validated in a field trial in Zhongmacun Mine’s 3903 East Transportation Bottom Drainage Roadway. Monitoring recorded maximum roof subsidence of 102.9 mm, stabilizing within 25 days (daily deformation < 0.2 mm), confirming the excellent performance of the bolt support system with this parameter combination in high-stress roadways. This study provides a theoretical basis and engineering reference for the optimal design of high-performance rock bolts.

5 June 2026 in Applied Sciences
Verified
Journal Article
Open access
PDF file
LFLI Feng
LI Feng
JLJia Lei
Jia Lei
DZDi Zhang
Di Zhang
Gangwei FanGangwei Fan
Gangwei Fan
GXGuangzheng Xu
Guangzheng Xu
SLShaodong Li
Shaodong Li
Gob-side roadways driven along the floor while retaining top coal in thick soft coal seams are prone to instability under strong mining-induced dynamic loading. To clarify the instability mechanism and develop an effective control method, the 1609 return airway of Jiulishan Mine was investigated using field survey, borehole imaging, FLAC3D numerical simulation, industrial testing, and field monitoring. The results show that, under the combined effects of large mining height, insufficient filling of the gob by the caved immediate roof, weak retained top coal, and low coal strength, shear failure planes tend to develop within the narrow coal pillar and extend from the gob-side roof toward the floor. Once the dominant shear plane cuts through the pillar, the overall bearing structure is destroyed, leading to shear slip, asymmetric rib deformation, roof subsidence toward the coal-pillar side, and rib–roof coupled instability. Based on a multi-index evaluation of pillar load-bearing capacity, plastic zone development, stress concentration, roadway deformation, and coal recovery, a 3 m coal pillar was determined as the rational width. A coordinated “narrow coal pillar + cross-rib anchorage” scheme was proposed, and field verification confirmed its effectiveness in controlling roof separation, roadway surface displacement, and internal surrounding-rock damage.

14 October 2026 in Sustainability
Verified
Journal Article
Open access
PDF file
JXJiaotao Xu
Jiaotao Xu
XLXiangling Li
Xiangling Li
SZShizhong Zhang
Shizhong Zhang
TATieliang An
Tieliang An
SZShizhong Zhang
Shizhong Zhang
ZWZiquan Wu
Ziquan Wu
With the gradual depletion of high-quality and readily mineable coal resources, recovering coal beneath buildings while controlling surface subsidence is important for sustainable resource development and protection of surface structures. Using the 11205 working face of Taitou Coal Mine as a case study, a three-roadway continuous mining and backfilling scheme combined with compact backfilling by grout injection into bags was proposed, and Fast Lagrangian Analysis of Continua in 3 Dimensions (FLAC3D) simulations were performed to evaluate the effects of branch-roadway width and backfilling ratio. At a 97% backfilling ratio, increasing branch-roadway width from 4 to 6 m increased maximum roof subsidence from 40.41 to 65.21 mm, maximum horizontal displacement from 1.220 to 2.174 mm, and the stress concentration factor from 2.62 to 2.96. At a 5 m width, increasing the backfilling ratio from 83% to 89% reduced maximum roof subsidence by 14.4%, whereas increasing it from 90% to 97% reduced subsidence by only 0.35 mm, indicating a pronounced diminishing-return response with markedly reduced sensitivity around 89–90%. Considering both subsidence control and construction efficiency, a branch-roadway width of 5 m and a backfilling ratio of 95% were selected. Field monitoring showed maximum strike and dip subsidence of 16.60 and 17.93 mm within 30 days. These results provide a reference for subsidence-controlled coal recovery beneath buildings under similar conditions.

6 January 2026 in Applied Sciences
Verified
Journal Article
Open access
PDF file
HJHaiyu Ji
Haiyu Ji
CLChong Li
Chong Li
FYFeng xin Yang
Feng xin Yang
LELee Edison
Lee Edison
SLShaodong Li
Shaodong Li
SFShuzhao Feng
Shuzhao Feng
The recovery and comprehensive utilization of tailings resources can effectively mitigate or eliminate safety hazards in the upper zones of open-pit mines. To ensure the safe recovery of accumulated tailings and enhance resource utilization efficiency, this study establishes a two-dimensional model based on the Discrete Element Method (DEM) for the overall stability of tailings recovery, which is integrated with the existing slope and ore pillar models of the open-pit mine. Leveraging the mechanical parameters of tailings and waste rock obtained from laboratory tests, this study systematically investigates the effects of tailings recovery on the stability of existing slopes. Results show that due to differences in fracture characteristics and tailings reserves, complete tailings extraction causes no landslides in some sections, but large-scale or varying landslides occur on southern/northern flank slopes in specific sections at certain excavation depths or after full extraction. Targeted recovery recommendations are proposed: “segmented excavation with bench reservation” prevents overall landslides on southern flank slopes of landslide-prone sections; 35° slope cutting ensures stability of northern flank slopes in all sections. Further field verification considering rainfall and seismic loading factors is required for practical applications.