Uncertainty in short-term grade estimations can significantly affect destination policies and dig-limit definitions in open-pit mining. However, most dig-limit techniques still rely on deterministic methods and manual procedures. This study proposes a stochastic optimization model for the dig-limit definition problem that incorporates geological uncertainty through multiple grade scenarios and explicitly controls deviations from production targets. Two real case studies were evaluated to compare the stochastic formulation against deterministic and manual definitions. Results show that the stochastic model systematically improves economic performance, with profit increases of up to 2.3% over deterministic policies and up to 4.3% when compared against manual solutions. The stochastic solution also reduces deviations from metal and grade targets, producing more stable outcomes across scenarios. The model is computationally efficient, with solution times below 25 s for all case studies, which are compatible with practical short-term planning workflows. Overall, our findings demonstrate that incorporating grade variability into the dig-limit definition improves profitability and reliability in short-term mine planning horizons.
Mining-induced seismicity presents significant challenges to the safety and operational continuity of underground mines, particularly in deep and highly stressed environments. This study proposes a methodological framework for seismic risk evaluation inspired by predictive-maintenance principles and applied to a high-resolution microseismic catalog from a Chilean underground mine. Using a combination of data filtering and correlation analyses, we identify the seismic parameters that control the most variability in the dataset: moment magnitude, frequency corner, and both dynamic and static stresses. Based on this, we perform a Principal Component Analysis (PCA), which clearly demonstrates the physical interconnection between the selected parameters, thereby helping to better characterize the seismic events and the mining environment. Using these results, a PCA-based risk map is constructed, enabling the delineation of zones with different levels of seismic risk. Additionally, a temporal tracking of potentially hazardous seismicity is included. The proposed methodology demonstrates that microseismic behavior can be effectively represented in a reduced-dimension space, offering a promising foundation for predictive and data-driven risk-assessment tools capable of supporting real-time decision-making in underground mining operations.