Public-private partnerships (P3s) have become an increasingly adopted delivery method for major U.S. highway infrastructure, with Value for Money (VfM) analysis serving as the primary analytical basis for procurement decisions. VfM assessments compare the estimated cost of conventional public delivery against the risk-adjusted cost of private delivery to determine the preferred pro-curement approach. While VfM analysis has been well-established at the procurement stage, no published peer-reviewed study has examined whether these estimates remain consistent with outcomes observed after project completion. This study addresses that gap by reconstructing pro-curement-stage and post-completion VfM values for seven completed U.S. highway projects using the FHWA P3-VALUE toolkit as a standardized analytical framework, with post-completion values updated using realized project data while maintaining a consistent model structure and discount rate. A Wilcoxon signed-rank test was applied to assess whether systematic differences existed between paired estimates. The Wilcoxon signed-rank test did not detect a statistically significant difference between procurement-stage and post-completion VfM estimates (exact two-sided p = 0.6875). VfM increased in three projects and decreased in four, while all seven projects retained their original directional VfM conclusions when the available post-completion information was incor-porated. However, the small sample size and limited statistical power mean that the non-significant result does not establish equivalence or demonstrate the general stability of procurement-stage VfM assessments.

26 October 2026 in Project Management Horizons
Verified
Journal Article
Open access
PDF file
PBPooja Basnet
Pooja Basnet
Pramen ShresthaPramen Shrestha
Pramen Shrestha
Value for Money (VfM) analysis is the primary mechanism by which U.S. state agencies evaluate whether a project should be delivered through a public-private partnership (P3) or conventional public procurement. While the methodology has been widely applied, relatively little is known about how practitioners conduct these analyses and apply VfM in practice. This study addresses that gap through semi-structured interviews with 12 practitioners participating across 10 interview sessions involving VfM analyses for U.S. highway projects. Framework analysis was used to examine practitioner perspectives on VfM objectives, assumption development, risk assessment, financing, discounting, and critical success factors. The findings indicate that VfM practice is shaped by funding constraints, reliance on professional judgment, and the quality of stakeholder engagement. Participants described project environments in which fiscal considerations strongly influenced procurement decisions and payment mechanisms. Across all major modeling components, practitioners relied heavily on historical benchmarks, expert judgment, and comparable project experience due to the limited availability of project-specific empirical data during the pre-procurement stage. Communication, stakeholder engagement, and the transparency of assumptions were consistently identified as important contributors to analytical credibility and reliability. The study contributes a practitioner-centered perspective to the VfM literature and highlights the importance of strengthening the institutional foundations of VfM practice through improved data collection, post-completion evaluation, transparency, independent review and public-sector analytical capacity. The findings suggest that enhancing the quality of information and governance surrounding VfM analysis may be as important as methodological refinement in improving future procurement evaluations.

14 September 2026 in Preprints.org
Verified
Preprint
Open access
PDF file
PBPooja Basnet
Pooja Basnet
Pramen ShresthaPramen Shrestha
Pramen Shrestha
Value for Money (VfM) analysis is the primary mechanism by which U.S. state agencies evaluate whether a project should be delivered through a public-private partnership (P3) or conventional public procurement. While the methodology has been widely applied, relatively little is known about how practitioners conduct these analyses and apply VfM in practice. This study addresses that gap through semi-structured interviews with ten practitioners involved in VfM analyses for U.S. highway projects. Framework analysis was used to examine practitioner perspectives on VfM objectives, assumption development, risk assessment, financing, discounting, and critical success factors. The findings indicate that VfM practice is shaped by funding constraints, reliance on professional judgment, and the quality of stakeholder engagement. Participants described project environments in which fiscal considerations strongly influenced procurement decisions and payment mechanisms. Across all major modeling components, practitioners relied heavily on historical benchmarks, expert judgment, and comparable project experience due to the limited availability of project-specific empirical data during the pre-procurement stage. Communication, stakeholder engagement, and the transparency of assumptions were consistently identified as important contributors to analytical credibility and reliability. The study contributes a practitioner-centered perspective to the VfM literature and highlights the importance of strengthening the institutional foundations of VfM practice through improved data collection, post-completion evaluation, transparency, independent review and public-sector analytical capacity. The findings suggest that enhancing the quality of information and governance surrounding VfM analysis may be as important as methodological refinement in improving future procurement evaluations.

12 February 2026 in Buildings
Verified
Journal Article
Open access
PDF file
Pramen ShresthaPramen Shrestha
Pramen Shrestha
SSShrijan Shrestha
Shrijan Shrestha
PBPooja Basnet
Pooja Basnet
Across the United States, growing reinvestment needs, aging assets, and rising service expectations are placing increasing pressure on how water and wastewater projects are delivered. Traditional Design–Bid–Build (DBB) has been widely used, but alternative delivery methods such as Design–Build (DB) and Construction Management-at-Risk (CMAR) are being adopted with the expectation of better cost and schedule performance. Their increased use has created a need to assess their performance and compare these delivery methods in terms of cost and time. Performance comparisons of this nature have been conducted in the highway and building sectors; however, there has been limited research in the water and wastewater sectors. In addition, a performance comparison including construction intensity with a large sample size across all three delivery methods has not been conducted in water and wastewater projects. Hence, this study conducts a statistical comparison of DBB, DB, and CMAR using three project performance indicators: cost growth, schedule growth, and construction intensity, with costs normalized to 2025 for inflation and durations measured in working days. The analysis compares outcomes across delivery methods for both the full project sample and a consistent project-size range. Results indicate that cost growth is generally low and does not differ significantly between methods irrespective of project size. However, schedule performance and construction intensity vary by delivery approach and project size. The study found that DB and DBB schedule growth is better than CMAR when considering all samples. With samples of projects costing $10 million to $110 million, only DB schedule growth was found to be better than DBB and CMAR. Considering the entire sample, the construction intensity of DB was found to be superior to DBB and CMAR, and CMAR was superior to DBB. When the data are separated between $10 million and $110 million, only DB construction intensity was found to be superior to DBB and CMAR water and wastewater projects. The outcomes of the cost and schedule comparison among the three delivery methods can assist water and wastewater project owners in making well-informed decisions regarding the selection of the delivery method based on their project scope, time, and budget.

13 May 2026 in Buildings
Verified
Journal Article
Open access
PDF file
Pramen ShresthaPramen Shrestha
Pramen Shrestha
BSBandana Shrestha
Bandana Shrestha
PBPooja Basnet
Pooja Basnet
Public building projects in the United States continue to face challenges related to cost escalation and schedule delays, prompting increased interest in alternative project delivery methods. Although Design–Bid–Build (DBB) remains the most commonly used approach, Design–Build (DB) and Public–Private Partnership (P3) delivery methods are increasingly adopted with the expectation of improved project performance. This study uses three statistical tests to determine whether three performance metrics related to the cost and schedule of U.S. building projects delivered using P3, DB, and DBB are significantly different. Before conducting this test, project costs were adjusted to constant 2025 dollars using the RS Means City Cost Index to account for differences in completion years. On average, all three test results indicate that P3 projects’ cost growth (−2.61%) is significantly lower than that of DB (7.95%) and DBB (24.40%). Similarly, the schedule growth of P3 projects (−2.51%) was significantly lower than that of DB (2.65%) and DBB (27.09%). However, no statistically significant difference in the schedule was observed between DB and DBB. Differences in construction intensity were not statistically significant. These findings provide quantitative insight for owners when selecting delivery methods for building projects.