Bandana Shrestha

Bandana Shrestha


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2022 in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Verified
Journal Article
Closed access
PDF file
BSBandana Shrestha
Bandana Shrestha
Pramen ShresthaPramen Shrestha
Pramen Shrestha
RMRuiko Maharjan
Ruiko Maharjan
DGDouglas Gransberg
Douglas Gransberg
Costs, change orders, and schedule performances of highway projects built using the design-bid-build (DBB) method by state departments of transportation have been tracked for more than five decades. As technology improves, it is assumed that highway project performance should improve. Therefore, the research hypotheses for this study were developed assuming that construction cost growth, change order growth, and schedule growth will decrease over time. The research hypotheses have also been tested based on project size because research has found that project performance often varies based on project size. This study has collected project costs, change orders, and schedule data from 3,957 highway construction projects built by Texas DOTs from 1987 to 2015. When converted into January 2020 equivalent costs, total project costs were $21.15 billion. These data were analyzed to determine whether there has been cost, change order, or schedule performance improvement over time. The results from statistical tests show that the cost growth of projects completed since 2001 decreased significantly until 2015. When the analysis was done by project size, it was found that the amount of cost growth decrease tends to be higher in large projects (more than $10 million) compared to small projects (less than $10 million). The study shows a decreasing trend of change order growth only for small projects. However, the study did not find any significant schedule growth decrease or increase trends in any types of projects. The major contributions of this study are the findings related to reduction in cost growth over time, irrespective of the size of the projects, and reduction in change order growth over time in large projects. This will be helpful for state DOTs project performance management personnel to learn cost and change order growth reduction strategies and use them to reduce schedule growth on highway projects.

1 February 2022 in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Verified
Journal Article
Closed access
PDF file
EBElizabeth Brogan
Elizabeth Brogan
BSBandana Shrestha
Bandana Shrestha
CCCaroline M. Clevenger
Caroline M. Clevenger
Pramen ShresthaPramen Shrestha
Pramen Shrestha
Owners that solicit proposals for lump-sum design-build transportation projects must provide a minimum level of design and other pertinent information to prospective design-builders in the procurement stages. Existing research on this topic relies heavily on a percent complete designation and demonstrates a lack of industry standards. This research presents owners’ current practices related to the recommended level of design, as well as additional information provided in design-build proposal requests. This research examines publicly available information from 22 state transportation agencies (STAs) to identify owner-provided design level at the procurement stage of design-build projects. Additionally, 17 STAs are further analyzed for additional related information provided to the design-builder during the procurement phase. The main findings include that 86% of STAs recommended owners provide prospective design-builders with 30% or below design levels at the procurement stage; and 88% of STAs provided environmental studies, geotechnical studies, right-of-way information, and existing utilities information as a part of request for proposals. The study findings will assist STAs in quantifying the level of design, as well as other information recommended for inclusion in proposal requests, so that design-builders can complete projects successfully.

24 August 2024 in Buildings
Verified
Journal Article
Open access
PDF file
BSBandana Shrestha
Bandana Shrestha
Pramen ShresthaPramen Shrestha
Pramen Shrestha
Public–private partnerships (P3s) have gained prominence in both developed and developing nations over recent decades. P3 contracts have been used in a broad spectrum of infrastructure sectors in the United States. However, it is important to demonstrate how P3 projects compare in terms of cost and schedule to traditional project delivery methods to make more informed choices when selecting a delivery method in infrastructure construction. This research focused on benchmarking the project performances of P3 highway projects against design-build (DB) and design-bid-build (DBB) highway projects by analyzing cost growth and schedule growth for highway projects undertaken using P3, DB, and DBB project delivery. Statistical tests revealed that P3 highway projects had a mean cost growth of 2.12%, whereas DB projects experienced 8.95% growth, and DBB projects 7.27%. Furthermore, the mean schedule growth for P3 highway projects was 0.59%, compared to 37.94% for DB projects and 31.39% for DBB projects. The research results can provide valuable insights to assist decision-making processes for future projects, which can be particularly useful for government agencies, private companies, and other stakeholders involved in infrastructure development. Furthermore, the stakeholders can make more informed choices when selecting a delivery method with the identified performance comparison findings, potentially reducing the likelihood of project disputes and failures.

1 August 2024 in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Verified
Journal Article
Closed access
VSVivek Shrestha
Vivek Shrestha
BSBandana Shrestha
Bandana Shrestha

13 May 2026 in Buildings
Verified
Journal Article
Open access
PDF file
Pramen ShresthaPramen Shrestha
Pramen Shrestha
BSBandana Shrestha
Bandana Shrestha
PBPooja Basnet
Pooja Basnet
Public building projects in the United States continue to face challenges related to cost escalation and schedule delays, prompting increased interest in alternative project delivery methods. Although Design–Bid–Build (DBB) remains the most commonly used approach, Design–Build (DB) and Public–Private Partnership (P3) delivery methods are increasingly adopted with the expectation of improved project performance. This study uses three statistical tests to determine whether three performance metrics related to the cost and schedule of U.S. building projects delivered using P3, DB, and DBB are significantly different. Before conducting this test, project costs were adjusted to constant 2025 dollars using the RS Means City Cost Index to account for differences in completion years. On average, all three test results indicate that P3 projects’ cost growth (−2.61%) is significantly lower than that of DB (7.95%) and DBB (24.40%). Similarly, the schedule growth of P3 projects (−2.51%) was significantly lower than that of DB (2.65%) and DBB (27.09%). However, no statistically significant difference in the schedule was observed between DB and DBB. Differences in construction intensity were not statistically significant. These findings provide quantitative insight for owners when selecting delivery methods for building projects.