To explore the solution of the two-step method applied in the rapid construction of super large cross-section tunnels passing through IV-and V-grade surrounding rock sections in karst cave areas, based on an engineering example of the Lianhuashan Tunnel, we use the numerical calculation method to analyze the stability of surrounding rock and the design parameters of the control measures for super large cross-section tunnels during the construction of the step method. The calculated results show that the working face of IV-grade surrounding rock can be stabilized by an advanced small pipe, and the stability of the supporting structure should be controlled mainly by IV-grade surrounding rock. In order to control the stability of the tunnel face, it is necessary to use an advanced large pipe shed in the surrounding V-grade rock. The reinforcement range of the advanced large pipe shed is 120° and the length is 20 m. This is the most economical design parameter of the advanced large pipe shed, ensuring the deformation control effect. For control of the stability of the supporting structure, under the condition that the working space is suitable for large machinery, the settlement of the arch of the supporting structure can be obviously reduced by shortening the step cycle footage and reducing the step length, and the peripheral convergence of the supporting structure can be obviously reduced by reducing the step height. After comprehensive analysis and considering the development of karst caves, the advanced support measures, design parameters, bench excavation design parameters, initial support measures, karst cave treatment measures, and bench construction process of IV- and V-grade surrounding rock is determined. The application verification shows that the research results have a good control effect on the stability of the surrounding rock and cave and are suitable for large-scale mechanical operations, which can significantly improve the excavation speed of the super large cross-section tunnel passing through the IV- and V-grade surrounding rock sections in the karst cave area.
Rotor noise can obscure the acoustic response used to identify voids in structures during robotic hammering inspection. We propose a fusion method that combines raw and noise-enhanced acoustic features for void identification. Local background estimates and separately recorded rotor noise guide time-frequency attenuation. Background reliability controls attenuation strength, while accepted decay fits provide a response-protection term. Raw and enhanced responses each yield 75 acoustic features, which are combined for classification. A wall-climbing robot collected hammering sounds from two concrete specimens at three rotor-speed settings. Evaluation used 666 events from 61 recordings, with nested validation grouped by recording. The proposed fusion method achieved an overall classification accuracy of 78.23%. Compared with the matched raw-feature baseline, overall accuracy increased by 3.15 percentage points and balanced accuracy by 2.82 percentage points. The conditional 95% interval for the balanced-accuracy gain was 0.59–5.28 percentage points, based on paired resampling of recordings. Fusion corrected 30 baseline errors while introducing nine new errors. Controlled mixtures showed increased signal-to-noise ratios after enhancement, but enhanced features alone did not clearly improve recognition on measured events. Cross-specimen transfer remained weak, limiting the evidence for wider use. These results support retaining raw acoustic information alongside enhanced features for void identification in concrete under rotor noise. Further validation requires independent specimens, verified impact times and documented measurement locations.
To address the impact of environmental and equipment factors on signal identification in highway tunnel drainage pipeline blockage monitoring, this study aims to elucidate the influence patterns of pipeline flow rate, optical fiber deployment scheme, and fiber performance on blockage-induced acoustic signals. A full-scale concrete pipeline experimental platform was established. Data were acquired using a HIFI-DAS V2 sensing system. The time–frequency domain characteristics of acoustic signals under different flow rates (50 m3/h and 100 m3/h), fiber deployment schemes (inside the pipe, outside the pipe, and outside a soundproofing layer), and fiber materials (six typical types) were analyzed and compared. The degree of influence of each factor on signal amplitude and dominant frequency components was quantified. The experimental results indicate that: Compared to a flow rate of 50 m3/h, the amplitude characteristic value at the blockage channel exhibited a marked increase at 100 m3/h, accompanied by an increase in the number and amplitude of dominant frequency components. While the dominant frequency components of the acoustic signals were less stable across the three deployment schemes, the overall amplitude at the blockage channel was consistently higher than that at non-blockage channels. When the fiber was deployed farther from the fluid core (outside the soundproofing layer), the dominant frequencies essentially disappeared, with energy distributed in a broadband form. The peak amplitude and array energy of the sensitive vibration sensing fiber were 2 times and 3.6 times those of the worst-performing type, respectively. Furthermore, its physical properties are better suited to the tunnel environment, effectively enhancing signal acquisition stability and the signal-to-noise ratio. Comprehensive analysis demonstrates that deploying sensitive fibers inside the pipe is more conducive to the accurate identification of blockage events. Moreover, uniform dominant frequency components and threshold criteria are not recommended along the entire length of the drainage pipe. This research provides theoretical and experimental support for parameter optimization of DAS systems to achieve high-precision pipeline blockage monitoring in complex tunnel environments.
This study aims to quantitatively assess blockage conditions in highway tunnel drainage pipelines using acoustic wave signals. A full-scale physical model of a drainage pipeline was constructed to simulate six blockage ratio conditions ranging from 12.5% to 75%. Distributed Acoustic Sensing (DAS) technology was employed to collect acoustic signals along the pipeline. Time-domain analysis and Fast Fourier Transform (FFT)-based frequency-domain analysis were conducted to compare the waveform amplitude and dominant frequency components between blocked and unobstructed pipeline sections. The results demonstrate a significant increase in time-domain amplitude at the blockage location, with a maximum enhancement of up to 50% compared to unobstructed sections. In the frequency domain, this phenomenon is particularly pronounced within specific dominant frequency bands (core frequency bands). For instance, the 395–405 Hz band was identified as the core band under the 50% blockage ratio condition. Furthermore, the time-domain amplitude at the blockage shows a positive correlation with the blockage ratio (12.5–75%). The comprehensive analysis indicates that the time-domain characteristics of DAS-based acoustic signals can effectively identify both the location and severity of blockages in highway tunnel drainage pipelines. This research provides fundamental data for evaluating the blockage state of tunnel drainage systems based on acoustic signatures.