Karukh Hassan M.Karim

Mr. Karukh Hassan M.Karim

orcid
BSc in Civil Engineering, MSc in Construction Management and...

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2021 in Journal of Engineering
Verified
Journal Article
Open access
PDF file
Karukh Hassan M.KarimKarukh Hassan M.Karim
Karukh Hassan M.Karim
NANoori Sadiq Ali
Noori Sadiq Ali
BNBasira Majeed Najm
Basira Majeed Najm
Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine whether the overrun of project cost and schedule significantly varied depending on project type, size, duration, location, and awarded years. The findings indicated that cost overruns are very common due to variation orders. 95.6% of the projects were studied being impacted, and overrun in project cost are also huge, with 16%. Time also overruns more common than cost overruns due to the variation orders. 98.7% of the projects were studied in Sulaimani were affected by time overrun with an average of 46.3% of initial duration observed. Findings also indicated that two out of five parameters measured in the analysis had a significant correlation with project cost overruns. Three out of five considered variables correlated with construction time overruns.

1 January 2020 in Kurdistan Journal of Applied Research
Verified
Journal Article
Open access
PDF file
Karukh Hassan M.KarimKarukh Hassan M.Karim
Karukh Hassan M.Karim
NANoori Ali
Noori Ali
BMBasira Majeed
Basira Majeed
Variation orders are a permanent phenomenon in the construction of projects and industries around the world, and particularly in the province of Sulaymaniyah. Where construction industries suffer from variation orders. It includes an amendment of the initial scope of work as in the awarded contract. This study analyses the causes of variation orders and their effects on cost and time of projects in Sulaimani governorate. This study involves a questionnaire survey to selected 36 causes and 10 effects of variation orders from the perspective of owner, design consultant, and contractors. A total of 223 completed questionnaire sets were returned out of 270 questionnaires distributed among the practitioners. Then the data was analyzed statistically. Also, 40 projects at different construction sectors that constructed during 2007-2013 were investigated by calculating cost and time overrun because of variation orders. The results showed that in Sulaimani governorate the most effective causes of variation orders are owner's financial problems, preparing typical design for different districts, errors and omission in design, desired profitability of contractor and lack of adequate or appropriate site before design stage to construct of project. On the other hand of impacts of variations, the study discovered that top five effects of variation orders on the projects are: schedule overrun, cost overrun, productivity degradation, dispute between contract stockholders and payment delay. Also, all projects affected by cost and time overruns at average of 20 percent of cost and 65.4 percent of time of project.

20 April 2026 in Buildings
Verified
Journal Article
Open access
PDF file
Karukh Hassan M.KarimKarukh Hassan M.Karim
Karukh Hassan M.Karim
OAOmar Warani Aziz
Omar Warani Aziz
NANoori Sadeq Ali
Noori Sadeq Ali
Building Information Modelling (BIM) has emerged as a transformative approach for improving efficiency, coordination, and sustainability in the construction industry; however, its adoption in developing regions remains limited. In the Kurdistan Region of Iraq (KRG), BIM implementation—particularly within the residential construction sector—remains at an early stage and lacks comprehensive empirical investigation. This study aims to assess stakeholders’ perspectives on current BIM practices, identify key adoption barriers, and develop a context-specific strategic framework to support BIM implementation. A mixed-method research design was employed, incorporating literature review, expert validation through semi-structured interviews, and a structured questionnaire survey. A total of 319 valid responses were analyzed using descriptive statistics, Relative Importance Index (RII), Cronbach’s alpha for reliability, Spearman’s rank correlation, independent samples t-tests, and one-way ANOVA. In addition to ranking barriers, an inter-barrier correlation analysis was conducted to examine the relationships, clustering patterns, and hierarchical structure of BIM adoption challenges. The results indicate that while BIM awareness is moderately established among stakeholders, its practical application remains limited, particularly beyond the design phase. The most critical barriers include lack of training and expertise, absence of regulatory frameworks and standards, insufficient government support, and financial constraints. The correlation analysis reveals that these barriers are interdependent, with policy and institutional deficiencies acting as root drivers influencing technical, financial, and awareness-related challenges. Based on these findings, the study proposes a four pillar conceptual strategic framework encompassing human capital development, regulatory and standardization enablement, awareness and demand generation, and organizational and collaborative enhancement. The framework is explicitly derived from empirical results, linking barrier clusters to prioritized strategies, thereby enhancing its practical applicability. This study contributes to the existing literature by providing one of the first multi-province empirical assessments of BIM adoption in the KRG residential sector, integrating statistical validation with strategic development, and offering transferable insights for other developing regions at a similar stage of BIM adoption.