To study the strengthening mechanism and effect underlying the reinforcement of a fractured rock mass with grouting, compressive shear tests were conducted with an RMT-150B rock mechanics test system. Prefabricated structural surfaces were strengthened with a new inorganic dual-liquid grouting material at five water–cement ratios (0.6–1.5). The effects of these water–cement ratios of the grouting on the deformation, strength, and failure characteristics of the prefabricated structural surface were analyzed. The results show that reinforcement with grouting significantly influenced the bearing capacity of the structural surface. The shear strength of the structure was significantly improved and the deformation resistance of the structural surface was enhanced. The shear stress–displacement curves, generated in compressive shear tests of the grouting-reinforced structures, were all nonlinear. The shearing process comprised three stages: elasticity, yield, and failure. Decreasing the water–cement ratio of the grouting material weakened the plasticity of the grouted structural surface and enhanced its brittleness. The deformation type changed from plastic slip to brittle shear. The shear strength, cohesion, and angle of internal friction of the grouting-reinforced structural surface increased with decreasing water–cement ratio.
An RMT-150B electrohydraulic servo testing system was used to perform uniaxial compression and uniaxial grading relaxation (creep) tests. The deformation, strength, and failure characteristics of the progressive failure process of coal samples under three loading modes were analyzed. The analysis results show that the prepeak stress-strain curve of the coal samples and the load relationships are not clear and that the whole compression process of coal still showed compression, elastic, yielding, and failure stages. The local stress drop characteristics during our relaxation creep grading tests showed no clear peak value and showed a yield curve with the shape of a conventional single plateau. The values of the mechanical parameters of axial compression were significantly higher than those obtained in the grade relaxation (creep) tests, which showed the mechanical parameters of coal samples with aging characteristics. In the relaxation (creep) tests, when the stress ratio was less than 70%, the relaxation (creep) characteristics of the sample were not clear. When the ratio of stress relaxation (creep) was more than 70% in the relaxation (creep) tests during displacement (stress) with a constant relaxation (creep) over the duration of the test, the evolution, development, and convergence of microcracks in the coal samples were observed. Relaxation (creep) stress was higher, failure duration was shorter, and the duration of failure was longer. For fully mechanized coal faces, increasing the support resistance and timely moving the support after coal cutting may prevent rib spalling accidents by reducing coal stress and exposure time in the front of the working face. Additionally, routine uniaxial compressive failures showed a simple form, having a clear tension-shear dual rupture surface. The staged relaxation creep failure testing of coal is more complex. The entire coal samples were divided into many thin-sheet debris via gradual collapse and shedding, and the number of cracks increased significantly, showing evident lateral expansion characteristics that are similar to the rib spalling characteristics in high coal mining working faces.
This research presents the grouting method of preventing rib sloughage which severely impacts mine safety and longwall retreat speed in thick coal seam with numerical simulation and laboratory tests. Based on the analysis of the plastic failure mode of five types of coal seam, roof strata ahead of the longwall face, and fractures developed in the coal seam, the following results are drawn, the range and degree of plastic failure generated in the coal seam and roof strata ahead of the longwall face gradually decreased as the coal mass strength increased; the grouting boreholes are essentially laid out within the coal rib instead of the roof. For a particular case of a coal mine in Shanxi province, a novel cement-based material was grouted, which fulfilled the reinforcement requirements under the tectonic stress regions and front abutment zones. Besides, the grouting borehole construction requested predrilled boreholes, full borehole intubation, lengthened hole sealing, and multiple-step drilling and grouting. This study can provide a theoretical framework of a design overview and practical basis for similar mining conditions in other coalfields.
In order to analyze the relationship between the configuration characteristics, variable mass permeability characteristics and the catastrophe mechanism of falling column process, The influence of the permeability was studied by diffraction instrument, And using the seepage test system of the fall column, The seepage instability process of variable mass broken rock mass is analyzed, The findings suggest that, The proportion of coarse particles accounted for 89.86%, Fine particles accounted for 10.14%, Broken rock particles is better, Low compression performance; The fall column, under strong hydrodynamic conditions, Due to its strong characteristics of migration and loss with water flow, It is easy to induce the subsidence column protrusion water disaster; As the ratio between coarse and fine aggregates increases, Porosity and permeability are both increased; When the axial displacement does not change, With the increasing circumference pressure, The permeability of the broken rock samples is decreasing; The fitting of the seepage velocity of the broken rock mass to the pore pressure gradient follows the Forchheimer relationship, The seepage of the broken rock mass belongs to the category of non-Darcy flow under the triaxial stress; The instability of the subsidence column fracture rock mass presents three seepage instability forms: initial seepage stage, seepage mutation stage and piping stage in different stages.
At present, it exists that the information level of coal mine production and management is low. On the basis of modeling the typical system for mine production, it simulates typical production accidents and establishes databases of mine safety production. Based on the High Level Architecture (abbr. HLA) and Distributed Interactive Simulation (abbr. DIS), it is able to design a set of simulation system for mine safety production, with the function of visualization network and integration. The system is able to model actual production process, educate and train the miners. It can also provide disaster early-warning for mine production. This paper analyses crucial technical problems and technology.
At present, it exists that the information level of coal mine production and management is low. On the basis of modeling the typical system for mine production, it simulates typical production accidents and establishes databases of mine safety production. Based on the High Level Architecture (abbr. HLA) and Distributed Interactive Simulation (abbr. DIS), it is able to design a set of simulation system for mine safety production, with the function of visualization network and integration. The system is able to model actual production process, educate and train the miners. It can also provide disaster early-warning for mine production. This paper analyses crucial technical problems and technology.