Jakub Pietras

Mr. Jakub Pietras

Faculty of Geo-Data Science, Geoengineering and Environmental Engineering, AGH University of Krakow, Kraków, Małopolskie, Poland
orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 November 2024
Verified
Conference Paper
Closed access
JPJakub Pietras
Jakub Pietras
DKDamian Kurdek
Damian Kurdek
AMAgnieszka Malinowska
Agnieszka Malinowska
Underground mining operation in salt deposits requires special control over rock mass stability. Changes in stress within the rock mass cause gradual convergence of underground workings. A slow convergence process with a complex spatiotemporal distribution requires the measurements with high accuracy, which is carry out on a well-planned spatial distribution of observation network. The aim of the study was to present the procedure of designing and implementing observations of convergence in salt caverns within a salt dome deposit in Klodawa salt mine in Poland. The studies focused on identifying the most important factors that should be considered when establishing new observation networks to assess the stability of salt rock mass. The algorithm was developed based on experiences is measurements conducted over a period of 50 years in one section of the Klodawa mine. The most significant components of spatio-temporal deformation process in 3D space were presented. Measured convergence in relation to the salt dome geometry, geological and mining condition were taken into account to design a new network in another part of salt dome. Presented experiences may originate as a premise for designing a new observation network in other salt mines where extraction is planned with the chamber and pillar method.

1 June 2026 in Measurement: Sensors
Verified
Journal Article
Open access
JPJakub Pietras
Jakub Pietras
AMAgnieszka Malinowska
Agnieszka Malinowska

30 October 2026
Verified
Conference Paper
Open access
PDF file
AMA. A. Malinowska
A. A. Malinowska
PKP. Koczwara
P. Koczwara
JPJakub Pietras
Jakub Pietras
RHR. H. Hejmanowski
R. H. Hejmanowski
The long-term preservation of underground cultural heritage is a challenge in engineering geology. Historical mine workings may continue deforming long after extraction ends, yet it is uncertain whether this behaviour indicates progressive deterioration or geomechanical stabilisation. This issue is critical at heritage sites, where engineering interventions may disrupt established stress conditions. This study examines historical chambers at Levels I and III of the UNESCO-listed Wieliczka Salt Mine, Poland. These levels contain the analysed chamber complexes, provide the most continuous chamber-scale levelling records for 1992–2020, and represent contrasting depth intervals. Nearly three decades of underground and surface levelling were integrated with chamber inventories and three-dimensional excavation geometry. Geological interpretation considered the Miocene evaporite succession of the Carpathian Foredeep, comprising bedded and brecciated rock salt interlayered with claystone, marl, and gypsum-bearing horizons. Results show persistent but highly stable deformation despite cumulative subsidence locally exceeding 450 mm. Displacement trends remained nearly linear, with no evidence of acceleration, instability, or regime shifts. The greatest displacements occurred in roadway systems and transition zones rather than directly above the principal chambers, indicating that excavation geometry controls long-term deformation more strongly than chamber volume alone. Historical chambers showed lower deformation rates and more stable displacement patterns, consistent with stress redistribution and long-term rock-mass adaptation. The findings demonstrate that measurable deformation does not necessarily imply increasing instability. Instead, deformation may coexist with geomechanical stability. This study provides rare empirical evidence from an underground heritage site and clarifies relationships among deformation, excavation geometry, rock-mass stabilisation, and heritage preservation.

10 September 2026 in Mining
Verified
Journal Article
Open access
PDF file
JPJakub Pietras
Jakub Pietras
DKDamian Kurdek
Damian Kurdek
Ryszard HejmanowskiRyszard Hejmanowski
Ryszard Hejmanowski
AMAgnieszka Agnieszka Malinowska
Agnieszka Agnieszka Malinowska
Rock-salt mines deform through chamber closure and vertical translation of the surrounding rock mass, yet these responses are commonly evaluated separately. This study integrates underground levelling, convergence monitoring, and mine geometry to identify the depth at which vertical motion changes from subsidence to uplift in the Kłodawa Salt Mine, Poland. The database comprises levelling campaigns conducted between 1962 and 2021 and 337 convergence series containing 7671 observations. Annual vertical velocities were calculated between actual survey epochs. The zero-vertical-velocity zone (ZVVZ) was estimated between adjacent measured levels with opposite median velocities; bootstrap resampling and mutual-nearest benchmark pairing quantified sampling uncertainty and local consistency. No transition was bracketed within the monitored 450–630 m interval in 1987–1992. In 1992–1994, shallow levels continued to subside while deeper levels uplifted, yielding crossing depths of 570.4 m in Field 1, 514.4 m in Field 2, and 476.8 m in Field 3. Field 1 retained the reversal in the 1994–2021 average, with a crossing near 585.3 m, although that long interval cannot resolve intermediate changes. Independent, mostly later convergence records show a marked increase in closure below 690 m and increasing horizontal dominance with depth. The ZVVZ is therefore a spatially variable kinematic boundary within a mining-modified deformation field, not a strain-free horizon: roof descent and floor uplift may generate rapid closure while mean vertical translation remains near zero. The method provides a reproducible monitoring state for deep salt mines. Future work should re-adjust the historical levelling networks, acquire synchronous levelling and convergence data at 690–780 m, and test excavation, geology, and backfilling controls using a calibrated three-dimensional viscoplastic model.