The vertical actuation of multi-axis seismic simulators usually requires a redundant parallel scheme for high load capacity. Due to geometric over-constraints, the internal force coupling and the nonlinear hysteresis are high; thus, waveform reproduction quality and structural fatigue may result. A displacement–force dual closed loop cooperative control mechanism can address these problems. First, a real-time kinematic model is developed to overcome the platform pose via actuator extension, and second, a dynamic force balance loop is introduced to actively redistribute the load components. In addition, a fuzzy PID controller is incorporated to optimize gain scheduling online, compensating for hydraulic nonlinearities and time-varying structural parameters. In the experiment on a 3 × 3 m 6-DOF shaking table, the presented method performs very favorably compared to traditional methods. Under broadband random excitation, the THD of acceleration waveform drops from 15.2% (single-loop control) to 3.2%, and the internal momentum oscillation amplitude is suppressed by over 70%. The results show that our proposed method eliminates internal force dependence while maintaining high precision trajectory tracking for seismic simulation.
The autonomous grasping of flexible slings is a pivotal challenge for unmanned crane systems, primarily stemming from the slings' geometric indeterminacy, material compliance under load,and stochastic initial pose relative to the hook.To address this challenge,we propose an intelligent hook system featuring a novel compound mechanical architecture.This architecture integrates a horizontal slewing mechanism for in-plane alignment with a self-locking worm-gear drive for secure grasping.A coordinated control strategy,employing a Fuzzy PID algorithm,ensures robust dynamic performance under variable loading conditions.Finite element analysis confirms structural integrity under a rated load of 500 kg,with a maximum stress of 344.34 MPa.Experimental results demonstrate that the hook completes a full pick-and-release cycle in approximately 2 seconds for parallel slings, with a success rate exceeding 95%.This represents an approximately 60% improvement in operational efficiency over manual operation.This work provides a practical and efficient solution for automating flexible sling handling.