Hua Wen

Prof. Hua Wen


Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 March 2009 in Frontiers of Architecture and Civil Engineering in China
Verified
Journal Article
Closed access
PDF file
HWHua Wen
Hua Wen
QCQiangong Cheng
Qiangong Cheng
FMFanchao Meng
Fanchao Meng
XCXiaodong Chen
Xiaodong Chen

27 March 2026 in Coatings
Verified
Journal Article
Open access
PDF file
STShucheng Tan
Shucheng Tan
HWHua Wen
Hua Wen
HTHua Tang
Hua Tang
WFWentao Fu
Wentao Fu
XGXiaoyan Guo
Xiaoyan Guo
XTXiaoyu Tan
Xiaoyu Tan
Water-based drill cuttings generated during onshore natural gas development are complex solid wastes that may pose environmental risks if improperly managed. This study evaluates the feasibility of reutilizing water-based drill cuttings as pavement base materials after stabilization using a novel composite stabilizer composed of cement, stabilizer liquid agent, and water-reducing powder (CLP stabilizer). Mix proportion optimization was conducted through compaction and 7-day unconfined compressive strength tests, followed by evaluation of road performance, including strength, compressive rebound modulus, water stability, and temperature shrinkage, with stabilized powder stabilized soil as a control. Microstructural characteristics were analyzed using X-ray diffraction and scanning electron microscopy, and environmental safety was assessed through heavy metal leaching tests and background soil investigation. The results show that the optimal mixture ratio of curing agent (5% cement + 2% liquid stabilizer + 8% superplasticizer powder) satisfies the strength requirement for pre-drilling road bases, exhibiting superior performance compared to the control group. When the stabilizer dosage reaches 9%, the 7-day unconfined compressive strength achieves a maximum of 3.38 MPa, representing a 51% increase over the control group. At a stabilizer dosage of 12%, the splitting tensile strength reaches a peak value of 0.901 MPa, showing a 60.3% improvement. These results indicate enhanced deformation resistance, water stability, and reduced temperature shrinkage rates. Microstructural analysis indicates that the formation of calcium silicate hydrate (C-S-H) gel and ettringite (AFt phase) leads to a denser structure and enhanced durability. Heavy metal concentrations comply with relevant standards, demonstrating controllable environmental risks and supporting sustainable pavement base application.

9 September 2026 in Buildings
Verified
Journal Article
Open access
PDF file
YZYulin Zhang
Yulin Zhang
HWHua Wen
Hua Wen
XFXiang Fan
Xiang Fan
NZNingchuan Zhang
Ningchuan Zhang
QXQian Xi
Qian Xi
ZXZiyu Xu
Ziyu Xu
The geotextile bag retaining wall is a reinforced soil retaining structure that has been widely adopted in recent engineering practice; its construction method involves stacking geotextile bags along the slope surface to provide surface load support for the backfill. This structure is characterized by simple construction, low cost, excellent reinforcement performance, and environmental friendliness. However, traditional geotextile bag retaining walls often suffer from drawbacks such as excessive lateral deformation and localized slope instability. Therefore, this study proposes an improved composite retaining wall structure combining soil and geotextile bag systems with geogrid reinforcement; this structure represents an enhancement and optimization of existing geotextile bag support systems; this approach integrates the individual geotextile bags into a unified whole, thereby enhancing the structural bearing capacity. Then, using a simplified shear-strength-reduction scenario in FLAC3D, we analyzed the load-bearing performance of this modified geotextile bag retaining wall under rainfall conditions, offering recommendations for regions with frequent precipitation. It is emphasized that additional slope stabilization measures should be implemented when employing this configuration. The test results indicate that the ultimate bearing capacity varies from 132.09 kPa to 207.47 kPa under different slope ratios with fixed 1 m geogrid reinforcement length. The geogrid-wrapped configuration reduces wall-facing horizontal deformation significantly, and increases its load-bearing capacity.

11 June 2026 in Coatings
Verified
Journal Article
Open access
PDF file
HWHua Wen
Hua Wen
XTXiaoyu Tan
Xiaoyu Tan
XWXin Wei
Xin Wei
XLXu Lei
Xu Lei
STShucheng Tan
Shucheng Tan
YLYing Liu
Ying Liu
Sulfate attack is a major cause of deterioration in tunnel lining concrete under aggressive underground conditions. This study investigates the sulfate resistance of fiber-reinforced ferroaluminate cement concrete incorporating steel slag powder through combined experimental and numerical approaches. Specimens with different fiber contents (0, 0.2%, and 0.4%) were subjected to dry–wet cycles in a 5% sodium sulfate solution. The results show that fiber incorporation significantly enhances sulfate resistance, with the optimal performance achieved at 0.2% fiber content. Compared with ordinary Portland cement concrete, ferroaluminate cement-based concrete exhibits improved durability, including lower mass variation, reduced strength degradation, and more stable dynamic elastic modulus. Microstructural analyses indicate that hydration products refine the pore structure, while fibers effectively inhibit crack propagation and expansion damage. Numerical simulation of tunnel lining structures further demonstrates that the optimized material reduces stress concentration, displacement, and crack development. Overall, the proposed material shows superior performance and promising application potential for tunnel linings in sulfate-rich environments.

9 September 2026 in Coatings
Verified
Journal Article
Open access
PDF file
STShucheng Tan
Shucheng Tan
XCXiaobing Chen
Xiaobing Chen
HWHua Wen
Hua Wen
XGXiaoyan Guo
Xiaoyan Guo
HTHua Tang
Hua Tang
BHBinfeng Huang
Binfeng Huang
In recent years, traditional cast-in-place concrete construction for pre-drilling engineering in unconventional natural gas fields has generated large amounts of waste concrete, consumed significant resources, and prolonged project schedules. To address these issues, this study proposes a prefabricated pavement slab system as a green and low-carbon alternative. Based on vehicle load surveys at shale-gas well sites in southwestern China, three loading conditions (design, overload, and ultimate axle loads) were defined. Theoretical calculations were then performed for reinforcement design, crack-width control, and local bearing capacity verification. A full-scale precast slab (3000 × 1495 × 150 mm) was fabricated and tested under static monotonic loading to measure deflection, crack development, steel strain, and concrete strain until failure. Separately, a three-dimensional finite element model of a four-panel pavement system (including a mortar-leveling layer and soil subgrade) was developed in ANSYS to simulate static and, preliminarily, moving loads. The experimental slab reached an ultimate load of about 365 kN (based on a single specimen, and thus not statistically representative), with ductile bending failure and crack/deflection patterns typical of reinforced concrete. The numerical model reproduced the cracking load and peak capacity with deviations below 17% from the test data, though post-cracking deflections were underestimated. Overall, the results demonstrate that the proposed prefabricated system is structurally feasible for heavy-duty drilling sites. It enables factory production, rapid on-site assembly, and reuse after dismantling, thereby reducing construction waste, shortening timelines, and supporting energy conservation and emission-reduction goals in the context of China’s green building policies.