Manex Barrenetxea

Dr. Manex Barrenetxea

orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
21 June 2019 in IEEE Transactions on Power Electronics
Verified
Journal Article
Closed access
DGDavid Garrido
David Garrido
IBIgor Baraia-Etxaburu
Igor Baraia-Etxaburu
JAJoseba Arza
Joseba Arza
MBManex Barrenetxea
Manex Barrenetxea
The measurement of fast voltage and current transients of SiC devices requires high bandwidth probes. Commercially available voltage and current probes can be expensive and in addition, the delay introduced by them must be compensated to achieve a proper time alignment (de-skew). Determining this de-skewing value is not a trivial task. In this paper, a simple and affordable measurement method is presented for the simultaneous measurement of the voltage and current transients of SiC devices. The voltage is measured by means of a high bandwidth RC attenuator while the current is estimated from the voltage drop in the stray inductance of the switching loop. Since both voltages are measured with two equal and matched high bandwidth passive voltage probes there is no need to apply any deskew. This is one of the most important advantages of the method. The presented method is experimentally evaluated and used for the estimation of energy switching losses in the tested SiC - MOSFET.

12 October 2018 in Energies
Verified
Journal Article
Open access
PDF file
JCJosé María Canales
José María Canales
IAIosu Aizpuru
Iosu Aizpuru
UIUnai Iraola
Unai Iraola
JBJon Andoni Barrena
Jon Andoni Barrena
MBManex Barrenetxea
Manex Barrenetxea
A high-speed train (HST) is a single-phase load supplied by a three-phase AC grid. The HST produces unbalanced three-line currents affecting the power quality of the grid. To balance the asymmetries on average, railway feeding sections are supplied that rotate the three phases of the grid. An electric isolation segment, called the neutral section (NS), between different sections is necessary. The HST must pass through this 1.6 km NS without power supply. In this paper, a medium-voltage AC static switch solution to feed the high-speed train in the NS is proposed. Thyristor technology is selected to design the 25 KVAC static switch. A medium-voltage power electronics procedure design is proposed to ensure proper operation in the final application. An NS operation is analyzed to identify impacts within the electric system and solution requirements are developed. Then, a low-scale prototype is used to experimentally validate the solution based on thyristor technology and the medium-voltage AC static switch is designed. Limitations on power and voltage at the Mondragon University Medium-Voltage Laboratory do not allow testing of the AC static switch at nominal conditions. A partial test procedure to test sections of the AC static switch is proposed and applied to validate the solution. Finally, experimental results for the Cordoba–Malaga (Spain) high-speed railway in real conditions with an HST crossing the NS at 300 km/h are shown.

13 May 2024 in IEEE Transactions on Power Delivery
Verified
Journal Article
Closed access
JVJone Ugarte Valdivielso
Jone Ugarte Valdivielso
JUJose Ignacio Aizpurua Unanue
Jose Ignacio Aizpurua Unanue
MBManex Barrenetxea
Manex Barrenetxea
Transformers are one of the key assets in AC distribution grids and renewable power integration. During transformer energization inrush currents appear, which lead to transformer degradation and can cause grid instability events. These inrush currents are a consequence of the transformer's magnetic core saturation during its connection to the grid. Transformer cores are normally modelled by the Jiles-Atherton (JA) model which contains five parameters. These parameters can be estimated by metaheuristic-based search algorithms. The parameter initialization of these algorithms plays an important role in the algorithm convergence. The most popular strategy used for JA parameter initialization is a random uniform distribution. However, techniques such as parameter initialization by Probability Density Functions (PDFs) have shown to improve accuracy over random methods. In this context, this research work presents a framework to assess the impact of different parameter initialization strategies on the performance of the JA parameter estimation for inrush current studies. Depending on available data and expert knowledge, uncertainty levels are modelled with different PDFs. Moreover, three different metaheuristic-search algorithms are employed on two different core materials and their accuracy and computational time are compared. Results show an improvement in the accuracy and computational time of the metaheuristic-based algorithms when PDF parameter initialization is used.

1 October 2019
Verified
Conference Paper
Closed access
JCJose Maria Canales
Jose Maria Canales
DSDaniel Serrano
Daniel Serrano
MBManex Barrenetxea
Manex Barrenetxea
JBJon Andoni Barrena
Jon Andoni Barrena
AGAnder Goikoetxea
Ander Goikoetxea
JAJon Anzola
Jon Anzola

1 September 2015
Verified
Conference Paper
Closed access
MBManex Barrenetxea
Manex Barrenetxea
IBIgor Baraia
Igor Baraia
ILIgor Larrazabal
Igor Larrazabal
IZIgnacio Zubimendi
Ignacio Zubimendi
GAG. P. Adam
G. P. Adam
BWB. W. Williams
B. W. Williams
Offshore wind farms provide benefits over onshore farms in terms of the amount of generated energy and environmental impact. Cost efficient energy transmission is one of the challenges of such installations. In this context, direct connection of DC wind turbines to the transmission line is a promising solution. This paper proposes a novel energy conversion scheme for the direct connection of the DC wind turbines to the transmission line. In addition, a brief comparison between two DC-DC converters is presented to establish the most suitable topology for the modular DC-DC converter required by the proposed energy conversion scheme.

1 September 2015
Verified
Conference Paper
Closed access
MBManex Barrenetxea
Manex Barrenetxea
IBIgor Baraia
Igor Baraia
ILIgor Larrazabal
Igor Larrazabal
IZIgnacio Zubimendi
Ignacio Zubimendi
Offshore wind farms provide benefits over onshore farms in terms of the amount of generated energy and environmental impact. Cost efficient energy transmission is one of the challenges of those installations. In this context direct connection of parallel connected DC wind turbines to the transmission line is a promising solution. Modular DC-DC converters are an attractive solution for the direct connection of the DC wind turbines to the transmission line. In addition, the phase-shifted full-bridge converter (PSFB) is a good candidate to form simple, efficient and reliable high voltage modular DC-DC converters for offshore DC networks. This paper proposes a novel energy conversion scheme for the direct connection of the DC wind turbines to the transmission line. Design criteria for the phase-shifted full-bridge converter and the medium frequency transformer are described and a modular energy conversion scheme is sized to operate with 10MW offshore wind turbines and 300kV transmission voltage.