The Gorona del Viento project was characterized in this article, concerning its implementation, as well as several years of exploitation in an isolated location, namely on the El Hierro island. The hybrid system includes a wind farm and a pumped storage power plant, which acts as an energy storage, and all are equipped with a control system. The planned strategy assumed a configuration based on 100% wind energy supply. However, the system does not guarantee the anticipated effectiveness. The problems with the lack of energy self-sufficiency are partly the result of changes in the project made already during construction, in particular because of the mismatch of the water reservoir’s capacity and the wind turbines’ energy production efficiency. This results in the necessity to limit the wind farm capacity to ensure grid stability and hence requires supplementation of energy from the diesel generator. The author compared the object to analogical ones which employ different technological solutions and presented potential suggestions as to improve the existing state and achieve the reliability of the system’s operation.
The paper presents selected isotropic and anisotropic mathematical models to calculate the distribution of solar radiation on the photovoltaic module plane with any spatial orientation. A comparison of solar radiation models for Poland is based on measured data and received from the Institute of Meteorology and Water Management. Power density of solar radiation for different angular positions, especially for representative days of each month, was calculated. Based on the statistical analysis of the percentage root-mean-square error (RMSE%), mean-bias error (MBE%) and the Pearson correlation coefficient of an individual mathematical model, our own correction factor for diffuse radiation was proposed. A modified Liu-Jordan model was compared with six common mathematical models showing better agreement of measured and calculated values of solar radiation density. The presented analysis explains which mathematical model is the most suitable for central Poland (Poznań, 52°25’ N, 16°56’ E) and shows the validity of applying the modified model to improve the accuracy of determination of the radiation power density for a given elevation and azimuth angle using values for a horizontal plane.
This chapter presents a pilot project, which is an innovative solution related to renewable energy sources (RES). It refers to the integrated system that covers a wind farm (4×3, 4 MW) and a pumped hydro storage PHS (16 MW). Environmental conditions and components of the system were characterised in structural and operational terms. The wind turbines that are part of the system are of considerable height (one of them is even the highest turbine in the world). This is partly the result of the hybrid construction of their towers. Around the bases, there are Bains, which function as a short-term energy storage with the total capacity of 160,000 m3 of water. The turbines were installed 200 m above sea level, and this also has a positive impact on their operational parameters. The short-term energy storage is connected with the long-term energy storage located in a valley by means of a pipeline. The response time for switching between the energy generation and storage functions is 30 s. The innovative nature of the project is determined by the short-term energy storage. The investment is fully automated. The hybrid power plant began its operation in 2018.
1 January 2017 in Poznan University of Technology Academic Journals: Electrical Engineering