Jiaxin Ling

Jiaxin Ling

orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 September 2022 in Building and Environment
Verified
Journal Article
Closed access
YSYi Shen
Yi Shen
JLJiaxin Ling
Jiaxin Ling
XLXiaojun Li
Xiaojun Li
HLHaijiang Li
Haijiang Li
SFShouzhong Feng
Shouzhong Feng
HZHehua Zhu
Hehua Zhu

17 March 2022 in Tunnelling and Underground Space Technology
Verified
Journal Article
Closed access
YSYi Shen
Yi Shen
JLJiaxin Ling
Jiaxin Ling
TLTanci Li
Tanci Li
LZLong Zhou
Long Zhou
SFShouzhong Feng
Shouzhong Feng
HZHehua Zhu
Hehua Zhu

11 July 2023 in Tunnelling and Underground Space Technology
Verified
Journal Article
Closed access
XLXiaojun Li
Xiaojun Li
LTLi Tang
Li Tang
JLJiaxin Ling
Jiaxin Ling
CCChao Chen
Chao Chen
YSYi Shen
Yi Shen
HZHehua Zhu
Hehua Zhu

4 August 2022 in Tunnelling and Underground Space Technology
Verified
Journal Article
Closed access
YSYi Shen
Yi Shen
JLJiaxin Ling
Jiaxin Ling
WWWenzhong Wang
Wenzhong Wang
HZHehua Zhu
Hehua Zhu
ZYZhiguo Yan
Zhiguo Yan

12 December 2023 in Tunnelling and Underground Space Technology
Verified
Journal Article
Closed access
YDYue Deng
Yue Deng
HZHehua Zhu
Hehua Zhu
YSYi Shen
Yi Shen
JLJiaxin Ling
Jiaxin Ling
SFShouzhong Feng
Shouzhong Feng

6 February 2024 in Frontiers in Earth Science
Verified
Journal Article
Open access
XLXiaojun Li
Xiaojun Li
ZCZiyang Chen
Ziyang Chen
LTLi Tang
Li Tang
CCChao Chen
Chao Chen
TLTao Li
Tao Li
Yi RuiYi Rui
Yi Rui
The rock mass rating (RMR) system plays a crucial role in geomechanics assessments for tunnel projects. However, conventional methods combining empirical and geostatistical approaches often yield inaccuracies, particularly in areas with weak strata such as faults and karst caves. To address these uncertainties and errors inherent in empirical techniques, we propose a progressive RMR prediction strategy based on the Bayesian framework. This strategy incorporates three key components: 1) Variogram modeling: utilizing observational data from the excavation face, we construct and update a variogram model to capture the spatial variability of RMR. 2) TSP-RMR statistic model: we integrate a TSP-RMR statistical model into the Bayesian sequential update process. 3) Bayesian maximum entropy (BME) integration: the BME method combines geological information obtained from tunnel surface excavation with tunnel seismic prediction (TSP) data, ultimately enhancing the RMR prediction accuracy. Our methodology is applied to the Laoying rock tunneling project in Yunnan Province, China. Our findings demonstrate that the fusion of soft data and geological interpretation significantly improves the accuracy of RMR predictions. At selected prediction points, the relative error of our method is less than 15% when compared to the traditional Kriging method. This approach holds substantial potential for advancing RMR estimation ahead of tunnel excavation, particularly when advanced geological forecast data are available.