Dan Yuan

Ms. Dan Yuan


Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 June 2026 in Applied Sciences
Verified
Journal Article
Open access
PDF file
DYDan Yuan
Dan Yuan
ZXZiHao Xiong
ZiHao Xiong
XSXianghao Sun
Xianghao Sun
DLDunwen Liu
Dunwen Liu
Long asphalt tunnels serve as critical infrastructure for urban public transport, yet their construction entails substantial energy consumption and carbon emissions. This study aims to quantify and predict carbon emissions from asphalt pavement construction in long tunnels. Adopting Hybrid Life Cycle Assessment (HLCA), the asphalt paving process is divided into five stages: material production, transportation, on-site paving, milling, and ventilation. Four construction schemes are formulated via detailed calculation and analysis. A carbon emission factor database specific to long tunnel asphalt pavement construction in Guangxi is established, and a quantitative model is developed using the emission coefficient method to calculate carbon emissions of each scheme, among which Scheme 2 is determined as the optimal low-carbon construction scheme. The calculation model is validated via numerical software, and a carbon emission prediction dataset is constructed. Three prediction models, namely GA-BPNN, conventional SVR, and BPNN, are established. The results indicate that the GA-BPNN model achieves the highest predictive accuracy among the three models. This study further improves the calculation and prediction methods for carbon emissions in long tunnel asphalt pavement construction, providing theoretical support for carbon reduction and low-carbon construction management.

25 June 2026 in Fractal and Fractional
Verified
Journal Article
Open access
PDF file
DLDunwen Liu
Dunwen Liu
DYDan Yuan
Dan Yuan
YZYong Zhang
Yong Zhang
XSXianghao Sun
Xianghao Sun
In recent years, it has become inevitable to dig underneath existing highways when excavating tunnels. The soil settlement induced by ground excavation may adversely affect existing highways. In this study, a settlement monitoring system is used to obtain the settlement sequence of multiple measurement points on the pavement. Multifractal detrended fluctuation analysis (MF-DFA) is used to focus on analyzing the multiple fractal features of the pavement settlement rate. The results show that the settlement rates of the highway caused by the tunnel excavation and construction process all show multiple fractal characteristics. The fluctuations in the measurement points above and near the entrance of the tunnel are more complex and intense. Based on the moving-average method (MA), convolutional neural network (CNN), and Extreme Learning Machine (ELM), MA-CNN and MA-ELM prediction models are constructed to predict the settlement value sequences of the fluctuating points. The results indicate that the MA-ELM prediction model demonstrates superior predictive performance (with R2 values of 0.956, 0.950, and 0.979 on the test set). Further, with the help of the Dung Beetle Optimizer (DBO), a meta-heuristic algorithm for parameter optimization, the hybrid model DBO-MA-ELM greatly improves the prediction performance (R2 of 0.975, 0.997, 0.998 for the testing set).