15 September 2020 in Environment and Planning A: Economy and Space
Verified
Journal Article
Open access
PDF file
BFBent Flyvbjerg
Bent Flyvbjerg
ABAlexander Budzier
Alexander Budzier
DLDaniel Lunn
Daniel Lunn
The Olympic Games are the largest, highest-profile, and most expensive megaevent hosted by cities and nations. Average sports-related costs of hosting are $12.0 billion. Non-sports-related costs are typically several times that. Every Olympics since 1960 has run over budget, at an average of 172 percent in real terms, the highest overrun on record for any type of megaproject. The paper tests theoretical statistical distributions against empirical data for the costs of the Games, in order to explain the cost risks faced by host cities and nations. It is documented, for the first time, that cost and cost overrun for the Games follow a power-law distribution. Olympic costs are subject to infinite mean and variance, with dire consequences for predictability and planning. We name this phenomenon "regression to the tail": it is only a matter of time until a new extreme event occurs, with an overrun larger than the largest so far, and thus more disruptive and less plannable. The generative mechanism for the Olympic power law is identified as strong convexity prompted by six causal drivers: irreversibility, fixed deadlines, the Blank Check Syndrome, tight coupling, long planning horizons, and an Eternal Beginner Syndrome. The power law explains why the Games are so difficult to plan and manage successfully, and why cities and nations should think twice before hosting. Based on the power law, two heuristics are identified for better decision making on hosting. Finally, the paper develops measures for good practice in planning and managing the Games, including how to mitigate the extreme risks of the Olympic power law.

11 October 2021 in Journal of Benefit-Cost Analysis
Verified
Journal Article
Closed access
PDF file
BFBent Flyvbjerg
Bent Flyvbjerg
DBDirk W. Bester
Dirk W. Bester
Most cost-benefit analyses assume that the estimates of costs and benefits are more or less accurate and unbiased. But what if, in reality, estimates are highly inaccurate and biased? Then the assumption that cost-benefit analysis is a rational way to improve resource allocation would be a fallacy. Based on the largest dataset of its kind, we test the assumption that cost and benefit estimates of public investments are accurate and unbiased. We find this is not the case with overwhelming statistical significance. We document the extent of cost overruns, benefit shortfalls, and forecasting bias in public investments. We further assess whether such inaccuracies seriously distort effective resource allocation, which is found to be the case. We explain our findings in behavioral terms and explore their policy implications. Finally, we conclude that cost-benefit analysis of public investments stands in need of reform and we outline four steps to such reform.

1 January 2011 in SSRN Electronic Journal
Verified
Preprint
Open access
PDF file
BFBent Flyvbjerg
Bent Flyvbjerg
ABAlexander Budzier
Alexander Budzier
Out-of-control information technology (IT) projects have ended the careers of top managers, such as EADS CEO Noël Forgeard and Levi Strauss’ CIO David Bergen. M

1 July 2016 in SSRN Electronic Journal
Verified
Preprint
Open access
PDF file
BFBent Flyvbjerg
Bent Flyvbjerg
ASAllison Stewart
Allison Stewart
ABAlexander Budzier
Alexander Budzier
Given that Olympic Games held over the past decade each have cost USD 8.9 billion on average, the size and financial risks of the Games warrant study. The objectives of the Oxford Olympics study are to (1) establish the actual out turn costs of previous Olympic Games in a manner where cost can consistently be compared across Games; (2) establish cost overruns for previous Games, i.e., the degree to which final out turn costs reflect projected budgets at the bid stage, again in a way that allows comparison across Games; (3) test whether the Olympic Games Knowledge Management Program has reduced cost risk for the Games, and, finally, (4) benchmark cost and cost overrun for the Rio 2016 Olympics against previous Games. The main contribution of the Oxford study is to establish a phenomenology of cost and cost overrun at the Olympics, which allows consistent and systematic comparison across Games. This has not been done before. Main findings of the study are, first, that average actual out turn cost for Summer Games is USD 5.2 billion (2015 level), and USD 3.1 billion for Winter Games. The most costly Summer Games to date are London 2012 at USD 15 billion; the most costly Winter Games Sochi 2014 at USD 21.9 billion. The numbers cover the period 1960-2016 and include only sports-related costs, i.e., wider capital costs for general infrastructure, which are often larger than sports-related costs, have been excluded. Second, at 156 percent in real terms, the Olympics have the highest average cost overrun of any type of mega-project. Moreover, cost overrun is found in all Games, without exception; for no other type of mega-project is this the case. 47 percent of Games have cost overruns above 100 percent. The largest cost overrun for Summer Games was found for Montreal 1976 at 720 percent, followed by Barcelona 1992 at 266 percent. For Winter Games the largest cost overrun was 324 percent for Lake Placid 1980, followed by Sochi 2014 at 289 percent. Third, the Olympic Games Knowledge Management Program appears to be successful in reducing cost risk for the Games. The difference in cost overrun before (166 percent) and after (51 percent) the program began is statistically significant. Fourth, and finally, the Rio 2016 Games, at a cost of USD 4.6 billion, appear to be on track to reverse the high expenditures of London 2012 and Sochi 2014 and deliver a Summer Games at the median cost for such Games. The cost overrun for Rio – at 51 percent in real terms, or USD 1.6 billion – is the same as the median cost overrun for other Games since 1999. Given the above results, for a city and nation to decide to stage the Olympic Games is to decide to take on one of the most costly and financially most risky type of mega-project that exists, something that many cities and nations have learned to their peril.

3 July 2022 in Journal of Management Information Systems
Verified
Journal Article
Open access
BFBent Flyvbjerg
Bent Flyvbjerg
ABAlexander Budzier
Alexander Budzier
JLJong Seok Lee
Jong Seok Lee
MKMark Keil
Mark Keil
DLDaniel Lunn
Daniel Lunn
DBDirk W. Bester
Dirk W. Bester
If managers assume a normal or near-normal distribution of Information Technology (IT) project cost overruns, as is common, and cost overruns can be shown to follow a power-law distribution, managers may be unwittingly exposing their organizations to extreme risk by severely underestimating the probability of large cost overruns. In this research, we collect and analyze a large sample comprised of 5,392 IT projects to empirically examine the probability distribution of IT project cost overruns. Further, we propose and examine a mechanism that can explain such a distribution. Our results reveal that IT projects are far riskier in terms of cost than normally assumed by decision makers and scholars. Specifically, we found that IT project cost overruns follow a power-law distribution in which there are a large number of projects with relatively small overruns and a fat tail that includes a smaller number of projects with extreme overruns. A possible generative mechanism for the identified power-law distribution is found in interdependencies among technological components in IT systems. We propose and demonstrate, through computer simulation, that a problem in a single technological component can lead to chain reactions in which other interdependent components are affected, causing substantial overruns. What the power law tells us is that extreme IT project cost overruns will occur and that the prevalence of these will be grossly underestimated if managers assume that overruns follow a normal or near-normal distribution. This underscores the importance of realistically assessing and mitigating the cost risk of new IT projects up front.

6 September 2017
Verified
Book
Closed access
AAAtif Ansar
Atif Ansar
BFBent Flyvbjerg
Bent Flyvbjerg
ABAlexander Budzier
Alexander Budzier
DLDaniel Lunn
Daniel Lunn
This chapter characterizes the propensity of big capital investments to systematically deliver poor outcomes as “fragility”—a notion suggested by Nassim Taleb. A thing or system that is easily harmed by randomness is fragile. It is argued that, contrary to their appearance, big capital investments break easily—they deliver negative net present value—due to various sources of uncertainty that impact them during their long gestation, implementation, and operation periods. The existence of economies of scale and scope is not refuted; instead, it is argued that big capital investments have a disproportionate (non-linear) exposure to uncertainties that deliver poor or negative returns above and beyond their economies of scale and scope. It is further argued that to succeed, leaders of capital projects need to carefully consider where scaling pays off and where it does not. To automatically assume that “bigger is better,” which is common in megaproject management, is a recipe for failure.