Inappropriate use of land and poor ecosystem management have accelerated land degradation and reduced the storage capacity of reservoirs. To mitigate the effect of the increased sediment yield, it is important to identify erosion-prone areas in a 287 km2 catchment in Ethiopia. The objectives of this study were to: (1) assess the spatial variability of sediment yield; (2) quantify the amount of sediment delivered into the reservoir; and (3) prioritize sub-catchments for watershed management using the Soil and Water Assessment Tool (SWAT). The SWAT model was calibrated and validated using SUFI-2, GLUE, ParaSol, and PSO SWAT-CUP optimization algorithms. For most of the SWAT-CUP simulations, the observed and simulated river discharge were not significantly different at the 95% level of confidence (95PPU), and sources of uncertainties were captured by bracketing more than 70% of the observed data. This catchment prioritization study indicated that more than 85% of the sediment was sourced from lowland areas (slope range: 0–8%) and the variation in sediment yield was more sensitive to the land use and soil type prevailing in the area regardless of the terrain slope. Contrary to the perception of the upland as an important source of sediment, the lowland in fact was the most important source of sediment and should be the focus area for improved land management practice to reduce sediment delivery into storage reservoirs. The research also showed that lowland erosion-prone areas are typified by extensive agriculture, which causes significant modification of the landscape. Tillage practice changes the infiltration and runoff characteristics of the land surface and interaction of shallow groundwater table and saturation excess runoff, which in turn affects the delivery of water and sediment to the reservoir and catchment evapotranspiration.
A growing worldwide body of literature is demonstrating the geomorphic and ecological roles played by wood in rivers. After more than a century of removing wood from rivers in many parts of the world, researchers and managers are now interested in returning the load of wood back to a more natural condition. The mechanical placement of wood in rivers is expensive, and so it is useful to know how long it will take for in‐stream wood loads to passively recover a target load by recruitment from riparian forests. Of fundamental interest to managers and researchers alike are the questions: (1) can a river passively recover to a preremoval load of wood, and (2) if so, how long will recovery take? We address these questions using the example of the anabranching King River, Northeast Victoria, Australia, which was desnagged twice: once in 1957 and again in 1980. We predict a recovery time of 255 ± 23 years using a complete census of recovering wood loads to develop and parameterize a mass balance delivery model run in a Monte Carlo simulation. Our results indicate that with a healthy supply of riparian vegetation and minimal interference from managers, rivers are likely to passively recover natural wood loads at least two and a half centuries after desnagging. Using the data and methods described in this paper, we develop a theory of recovery, conceptually describing the recovery process as a sequence of five stages that can be used to monitor and track wood loads through time.
23 May 2008 in Earth Surface Processes and Landforms
River relocation is the diversion of a river into an entirely new channel for part of their length (often called river diversions). Relocations have been common through history and have been carried out for a wide range of purposes, but most commonly to construct infrastructure and for mining. However, they have not been considered as a specific category of anthropogenic channel change. Relocated channels present a consistent set of physical and ecological challenges, often related to accelerated erosion and deposition. We present a new classification of river relocation, and present a series of case studies that highlight some of the key issues with river relocation construction and performance. Primary changes to the channel dimensions and materials, alongside changes to flow velocity or channel capacity, can lead to a consistent set of problems, and lead to further secondary and tertiary issues, such as heightened erosion or deposition, hanging tributaries, vegetation loss, water quality issues, and associated ecological impacts. Occasionally, relocated channels can suffer engineering failure, such as overtopping or complete channel collapse during floods. Older river relocation channels were constructed to minimise cost and carry large floods, and were straight and trapezoidal. In some countries, modern relocated channels represent an exciting new challenge in that they are now designed to replicate natural rivers, the success of which depends on understanding the characteristics, heterogeneity, and mechanisms at work within the natural channel. We discuss shortcomings in current practice for river relocation and highlight areas for future research for successful rehabilitation of relocated rivers.
5 February 2020 in River Research and Applications