Ian Rutherfurd

Prof. Dr. Ian Rutherfurd

School of Geography, Faculty of Science, The University of Melbourne, Carlton VIC 3053, Australia

Research Focus & Metrics

Academic Career Length

19Years (2008-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 October 2017 in Water
Verified
Journal Article
Open access
PDF file
GAGebiaw Teshome Ayele
Gebiaw Teshome Ayele
ETEngidasew Z. Teshale
Engidasew Z. Teshale
BYBofu Yu
Bofu Yu
Ian RutherfurdIan Rutherfurd
Ian Rutherfurd
Jaehak JeongJaehak Jeong
Jaehak Jeong
Inappropriate use of land and poor ecosystem management have accelerated land degradation and reduced the storage capacity of reservoirs. To mitigate the effect of the increased sediment yield, it is important to identify erosion-prone areas in a 287 km2 catchment in Ethiopia. The objectives of this study were to: (1) assess the spatial variability of sediment yield; (2) quantify the amount of sediment delivered into the reservoir; and (3) prioritize sub-catchments for watershed management using the Soil and Water Assessment Tool (SWAT). The SWAT model was calibrated and validated using SUFI-2, GLUE, ParaSol, and PSO SWAT-CUP optimization algorithms. For most of the SWAT-CUP simulations, the observed and simulated river discharge were not significantly different at the 95% level of confidence (95PPU), and sources of uncertainties were captured by bracketing more than 70% of the observed data. This catchment prioritization study indicated that more than 85% of the sediment was sourced from lowland areas (slope range: 0–8%) and the variation in sediment yield was more sensitive to the land use and soil type prevailing in the area regardless of the terrain slope. Contrary to the perception of the upland as an important source of sediment, the lowland in fact was the most important source of sediment and should be the focus area for improved land management practice to reduce sediment delivery into storage reservoirs. The research also showed that lowland erosion-prone areas are typified by extensive agriculture, which causes significant modification of the landscape. Tillage practice changes the infiltration and runoff characteristics of the land surface and interaction of shallow groundwater table and saturation excess runoff, which in turn affects the delivery of water and sediment to the reservoir and catchment evapotranspiration.

23 October 2019 in Geographical Research
Verified
Journal Article
Closed access
PDF file
SRSarah Rogers
Sarah Rogers
DCDan Chen
Dan Chen
HJHong Jiang
Hong Jiang
Ian RutherfurdIan Rutherfurd
Ian Rutherfurd
MWMark Yaolin Wang
Mark Yaolin Wang
WZWenjing Zhang
Wenjing Zhang

9 November 2018 in Water Resources Research
Verified
Journal Article
Open access
PDF file
JSJ. C. Stout
J. C. Stout
Ian RutherfurdIan Rutherfurd
Ian Rutherfurd
JGJ. Grove
J. Grove
AWA. J. Webb
A. J. Webb
AKA. Kitchingman
A. Kitchingman
JLJ. Lyon
J. Lyon
A growing worldwide body of literature is demonstrating the geomorphic and ecological roles played by wood in rivers. After more than a century of removing wood from rivers in many parts of the world, researchers and managers are now interested in returning the load of wood back to a more natural condition. The mechanical placement of wood in rivers is expensive, and so it is useful to know how long it will take for in‐stream wood loads to passively recover a target load by recruitment from riparian forests. Of fundamental interest to managers and researchers alike are the questions: (1) can a river passively recover to a preremoval load of wood, and (2) if so, how long will recovery take? We address these questions using the example of the anabranching King River, Northeast Victoria, Australia, which was desnagged twice: once in 1957 and again in 1980. We predict a recovery time of 255 ± 23 years using a complete census of recovering wood loads to develop and parameterize a mass balance delivery model run in a Monte Carlo simulation. Our results indicate that with a healthy supply of riparian vegetation and minimal interference from managers, rivers are likely to passively recover natural wood loads at least two and a half centuries after desnagging. Using the data and methods described in this paper, we develop a theory of recovery, conceptually describing the recovery process as a sequence of five stages that can be used to monitor and track wood loads through time.

23 May 2008 in Earth Surface Processes and Landforms
Verified
Journal Article
Open access
PDF file
SWScott Wilkinson
Scott Wilkinson
Ian RutherfurdIan Rutherfurd
Ian Rutherfurd
RKRobert J. Keller
Robert J. Keller
Pool–riffle sequences (PRSs) are periodic river‐bed morphologies with wavelengths several times the channel width. Causes of PRS formation and maintenance are not clearly understood, which may limit the effectiveness of protection and rehabilitation measures. Some confusion has existed about whether the PRS morphology is the same as or distinct from alternate bars. In this paper we investigate whether the bar instability forming alternate bars also contributes to PRS formation, periodicity and maintenance. This was unclear because bar instability occurs only when the ratio of channel width/depth exceeds a critical value, generally understood to be approximately 10, which is larger than the width‐to‐depth ratio of many PRSs. A mobile‐bed physical model is used to test whether bar instability occurs in channels characteristic of PRS morphology, with low width‐to‐depth ratio, and high relative roughness. The physical model was scaled from a prototype PRS in a gravel and cobble bed river. Alternate bars formed in the model at channel width‐to‐depth ratios as low as 3·8. The wavelength of the alternate bars formed was generally 2·2–5 times channel width, which was similar to the prototype PRS. Therefore, bar instability can occur in virtually all PRSs, and it contributes to the widespread formation of periodic PRS morphology. The model showed that maintenance of the bar height in the prototype PRS also depends on variations in channel width. It is concluded that periodic PRSs are formed and maintained by the interaction between bar instability, and flow deflections associated with variations in channel geometry such as width variation. Resonance between bar instability and three‐dimensional bed forms such as alternate bars and variations in channel geometry. Variations in channel geometry are also important in determining the location and dimensions of individual pools and bars. Copyright © 2008 John Wiley & Sons, Ltd.

29 September 2018 in Water
Verified
Journal Article
Open access
PDF file
AFAlissa Flatley
Alissa Flatley
Ian RutherfurdIan Rutherfurd
Ian Rutherfurd
RHRoss Hardie
Ross Hardie
River relocation is the diversion of a river into an entirely new channel for part of their length (often called river diversions). Relocations have been common through history and have been carried out for a wide range of purposes, but most commonly to construct infrastructure and for mining. However, they have not been considered as a specific category of anthropogenic channel change. Relocated channels present a consistent set of physical and ecological challenges, often related to accelerated erosion and deposition. We present a new classification of river relocation, and present a series of case studies that highlight some of the key issues with river relocation construction and performance. Primary changes to the channel dimensions and materials, alongside changes to flow velocity or channel capacity, can lead to a consistent set of problems, and lead to further secondary and tertiary issues, such as heightened erosion or deposition, hanging tributaries, vegetation loss, water quality issues, and associated ecological impacts. Occasionally, relocated channels can suffer engineering failure, such as overtopping or complete channel collapse during floods. Older river relocation channels were constructed to minimise cost and carry large floods, and were straight and trapezoidal. In some countries, modern relocated channels represent an exciting new challenge in that they are now designed to replicate natural rivers, the success of which depends on understanding the characteristics, heterogeneity, and mechanisms at work within the natural channel. We discuss shortcomings in current practice for river relocation and highlight areas for future research for successful rehabilitation of relocated rivers.

5 February 2020 in River Research and Applications
Verified
Journal Article
Closed access
PDF file
Ian RutherfurdIan Rutherfurd
Ian Rutherfurd
CKChristine Kenyon
Christine Kenyon
Martin ThomsMartin Thoms
Martin Thoms
JGJames Grove
James Grove
JTJodie Turnbull
Jodie Turnbull
SLSusan Lawrence
Susan Lawrence