This paper presents a multi-year transmission expansion planning (TEP) model which considers the transmission congestion and the impact of generation investment cost in the planning horizon. The Benders decomposition approach is utilized which decomposes TEP into a master problem and two subproblems representing security and optimal operation. The operation cost due to congestion (OCC) is considered in the proposed model given that the congestion level is a proper criterion for measuring the degree of competitiveness in an electricity market. The model evaluates sensitivity of the optimal TEP to congestion level, planning horizon, and financial constraints. Regulators can utilize the proposed results to provide long-term TEP to market players and to develop incentive mechanisms to trigger generation investments. The proposed approach is applied to a hypothetical system and Turkish power system.
In this paper, we propose a novel technique to determine the optimal placement of wind farms, thereby taking into account wind characteristics and electrical grid constraints. We model the long-term variability of wind speed using a Weibull distribution according to wind direction intervals, and formulate the metrics that capture wind speed characteristics at a specific location, namely the arithmetic mean of wind speed, the theoretical wind power density and the capacity factor of a prospective wind power plant, to determine the feasibility of a wind power plant establishment. Furthermore, a linear optimization formulation is provided to determine the geographical locations and the installed capacities of wind farms, in order to maximize the expected annual wind power generation, while obeying the constraints from the electrical power grid and the transmission system operator. As a case study, the proposed wind speed model and the linear optimization formulation are used to evaluate the wind characteristics and the potential wind farm sites in Turkey
27 December 2018 in Journal of Modern Power Systems and Clean Energy
Uncertainties in wind power forecast, day-ahead and imbalance prices for the next day possess a great deal of risk for the profit of generation companies participating in a day-ahead electricity market. Generation companies are exposed to imbalance penalties in the balancing market for unordered mismatches between associated day-ahead power schedule and real-time generation. Coordination of wind and thermal power plants alleviates the risks raised from wind uncertainties. This paper proposes a novel optimal coordination strategy by balancing wind power forecast deviations with thermal units in the Turkish day-ahead electricity market. The main focus of this study is to provide an optimal trade-off between the expected profit and the risk under wind uncertainty through conditional value at risk (CVaR) methodology. Coordination problem is formulated as a two-stage mixed-integer stochastic programming problem, where scenario-based wind power approach is used to handle the stochasticity of the wind power. Dynamic programming approach is utilized to attain the commitment status of thermal units. Profitability of the coordination with different day-ahead bidding strategies and trade-off between expected profit and CVaR are examined with comparative scenario studies.
18 February 2010 in IEEE Transactions on Power Systems
This paper presents a transmission expansion planning (TEP) model which coordinates investment decisions in monopolistic transmission and decentralized generator sectors. The proposed planning approach gauges transmission congestion and security constraints with respect to transmission investments while promoting investments on independent power produces (IPPs) through incentive payments. The paper includes discussions on incentive mechanisms and prioritization among qualified IPPs for several planning scenarios. Such incentives might be necessary to trigger investments on IPPs earlier than those projected by the decentralized generation system, when the power system security is threatened. The proposed planning approach would optimize the sum of transmission investments, incentive payments to IPPs, and congestion costs along the planning horizon. The case studies illustrate how the proposed planning algorithm could be utilized in order to determine incentive payments to candidate generators when necessary, and prioritize such incentives among multiple IPP candidates.
This paper presents a novel planning approach which optimizes size and location of new transmission substation (TS) investments considering capacity expansion of the existing TSs based on primary distribution network investment requirements. Mixed Integer Programming (MIP) is utilized and the problem is decomposed into investment and feasibility check subproblems. The algorithm is formulated to minimize total investment cost while supplying the spatial forecasted load considering a set of system constraints. The results of two numerical examples indicate that presented algorithm is adequate for determining requirements of new transmission substations and/or capacity expansions together with new HV/MV lines, via appropriate selection of candidates. Visualization of the planning algorithm results, in an iterative manner, gives very important verification signals regarding the necessity of the proposed investments.
This study proposes a methodology to analyze the impacts of Electric Vehicles (EVs) on Low Voltage (LV) distribution networks based on probabilistic models developed for the charging process of EVs. In addition to the battery charging characteristics, Gaussian distribution function for EV plug-in times and Weibull distribution function for daily travel times are utilized in simulations. Monte Carlo based load flow simulations are performed in order to evaluate the response of the LV networks to various EV and load scenarios and different multi-tariff mechanisms. The sample networks are investigated for branch overloads, excessive voltage drops and losses using a systematic reporting approach developed. This method guides the utilities to determine the necessary investments on LV networks and their associated time frames. The expected consumer reaction to different multi tariff systems can also be modeled to assess the economic feasibility of a new multi tariff system against necessary investments in the LV network.