Closely-spaced outburst coal seams (COCS) is the main condition of coal seams in southwest China, and gas disasters are one of the major problems affecting coal mine safety. Mining a protective seam and pre gas extraction are the most safety way to improve the efficiency of mining under these conditions. However, low pre-mining gas extraction efficiency coupled with the close proximity of adjacent working faces is a problem. When mining at an old working face has been completed but the new working face is not yet ready to be mined, coal-bed gasses can flow into the new working face from adjacent seams and this commonly causes methane monitoring instruments to sound an alarm. These gas extraction difficulties lead to a conflict between mine safety and profit. To solve these problems, a sequential approach for integrated coal and gas mining of closely-spaced outburst coal seams is introduced in this paper. Two fundamental principles are proposed: (1) Fully coordinating the spatiotemporal relationships between gas extraction, roadway development, and coal mining to maximize both mine safety and coal and gas production; (2) Defining a mining sequence for outburst coal seams and choosing the coal seam with the weakest outburst risk as the protective seam. A system for comprehensive gas extraction in underground coal mines is divided into four stages for gas extraction: gas extraction before coal roadway tunneling, gas extraction before coal mining, gas extraction during coal mining, and gas extraction from the goaf after coal mining. The Songzao mining area, China, is used as a case study to demonstrate the effectiveness of this model, and it brings three major benefits: it improves underground coal mine safety with physical gas accidents decreased by 66.8%, it makes underground coal-bed methane (CBM) extraction more efficient with the average gas extraction rate were respectively 45.13 m3/t and 62.4%, the highest in China, and it reduces greenhouse gas emissions equivalent to 3.5 million tonnes of carbon dioxide. This study could be used as a valuable example for other coal deposits being mined under similar geological conditions.
A submerged floating tunnel (SFT) is considered an innovative alternative to conventional bridges and underground or immersed tunnels for passing through deep water. Assessment of hydrodynamic performance of SFT under regular wave loading is one of the important factors in the design of SFT structure. In this paper, a theoretical hydrodynamic model is developed to describe the coupled dynamic response of an SFT and mooring lines under regular waves. In this model, wave-induced hydrodynamic loads are estimated by the Morison equation for a moving object, and the simplified governing differential equation of the tunnel with mooring cables is solved using the fourth-order Runge–Kutta and Adams numerical method. The numerical results are successfully validated by direct comparison against published experimental data. On this basis, the effects of the parameters such as the cable length, buoyancy-weight ratio, wave period, wave steepness, and water/submergence depth on the dynamic response of the SFT under wave loading are studied. The results show that tunnel motions and cable tensions grow with wave height and period and decrease with submergence depth. The resonance of the tunnel will be triggered when the wave period is close to its natural vibration period, and the estimation formula of wave period corresponding to tunnel resonance is proposed in this paper.
17 November 2020 in Mathematical Problems in Engineering
Tunnel lining crack is the most common disease and also the manifestation of other diseases, which widely exists in plain concrete lining structure. Proper evaluation and classification of engineering conditions directly relate to operation safety. Particle flow code (PFC) calculation software is applied in this study, and the simulation reliability is verified by using the laboratory axial compression test and 1:10 model experiment to calibrate the calculation parameters. Parameter analysis is carried out focusing on the load parameters, structural parameters, dimension, and direction which affect the crack diseases. Based on that, an evaluation index system represented by tunnel buried depth (H), crack position (P), crack length (L), crack width (W), crack depth (D), and crack direction (A) is put forward. The training data of the back propagation (BP) neural network which takes load-bearing safety and crack stability as the evaluation criteria are obtained. An expert system is introduced into the BP neural network for correction of prediction results, realizing classified dynamic optimization of complex engineering conditions. The results of this study can be used to judge the safety state of cracked lining structure and provide guidance to the prevention and control of crack diseases, which is significant to ensure the safety of tunnel operation.
Submerged floating tunnels (SFTs) are an innovative traffic structure for transportation in deep and long-distance ocean environments. SFTs have the risk of being subjected to wave action in the complex ocean environment. Therefore, in order to ensure the safety and stability of SFTs during their service, the dynamic behavior of an SFT subjected to the action of waves is experimentally investigated in this study. Based on the wave–current flume, a physical scale-model experiment of an SFT for studying the dynamic behavior of an SFT subjected to regular waves interactions is deeply and thoroughly explored. The results show that the wave outputs from the wave-making system are verified to be reliable. The influence of major load parameters on the dynamic behavior of the SFT are deeply and thoroughly explored. The effects of wave height and wave period on acceleration, wave pressure, anchor cable force and displacement in an SFT are discussed. This experimental study has theoretical and practical significant for SFT design and safety.
As the first waterproof component of the immersed tunnel, it is very important to ensure the remaining compression of the GINA gasket to resist external water intrusion. This paper proposed a method for determining warning thresholds for the remaining compression of the GINA gasket based on a material-to-mechanical analysis. In terms of material analysis, two factors that affect the GINA gasket are investigated: rubber hardness and cross-sectional shape, and they are adopted as the basis for subsequent mechanical analysis. In terms of mechanical analysis, uneven settlement during the operation period is considered to be the major cause of joint deformation, which is further divided into four modes: bending, shear, expansion, and torsion, with the computation model of the GINA gasket established to obtain the warning threshold. After that, a graded early warning method is adopted, and corresponding thresholds are given after an investigation of previous studies, which are validated by a three-dimensional finite element analysis. The deformation monitoring data between the E28 and E29 elements of the Hong Kong–Zhuhai–Macao Bridge Immersed Tunnel are used to verify the proposed method. The results show that the GINA gasket of the Hong Kong–Zhuhai–Macao Bridge Immersed Tunnel is currently in a safe state, and its deformation is much lower than the minimum warning level.