Xinghong Jiang

Mr. Xinghong Jiang


Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 November 2020 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
HDHao Ding
Hao Ding
XJXinghong Jiang
Xinghong Jiang
KLKe Li
Ke Li
HGHongyan Guo
Hongyan Guo
WLWenfeng Li
Wenfeng Li
Tunnel lining crack is the most common disease and also the manifestation of other diseases, which widely exists in plain concrete lining structure. Proper evaluation and classification of engineering conditions directly relate to operation safety. Particle flow code (PFC) calculation software is applied in this study, and the simulation reliability is verified by using the laboratory axial compression test and 1:10 model experiment to calibrate the calculation parameters. Parameter analysis is carried out focusing on the load parameters, structural parameters, dimension, and direction which affect the crack diseases. Based on that, an evaluation index system represented by tunnel buried depth (H), crack position (P), crack length (L), crack width (W), crack depth (D), and crack direction (A) is put forward. The training data of the back propagation (BP) neural network which takes load-bearing safety and crack stability as the evaluation criteria are obtained. An expert system is introduced into the BP neural network for correction of prediction results, realizing classified dynamic optimization of complex engineering conditions. The results of this study can be used to judge the safety state of cracked lining structure and provide guidance to the prevention and control of crack diseases, which is significant to ensure the safety of tunnel operation.

17 February 2023 in Advances in Materials Science and Engineering
Verified
Journal Article
Open access
PDF file
XJXinghong Jiang
Xinghong Jiang
HSHengxiang Song
Hengxiang Song
KLKe Li
Ke Li
JQJing Qiang
Jing Qiang
JTJing Tian
Jing Tian
Tunnel engineering in China has developed to the stage of both construction and maintenance, and the problem of structural defect is widespread. The cast-in-situ jacketed arch treatment takes a long time and has a great impact on traffic. It is urgent to develop prefabricated treatment technology, and the guarantee of mechanical properties of the prefabricated UHPC-post-cast NC interface is the key problem. Through the oblique shear test, combined with the XTDIC full-field strain monitoring system, the failure process and failure mode of UHPC-NC specimens were studied and analyzed under different interface keyway numbers (0, 1, 2, and 3), interface agents (meshless interface agent, cement slurry, silica fume modified cement slurry, modified cement slurry mesh, cement slurry, and expansion agent), and NC pouring grades (C30, C35, C40, and C50), as well as the influencing factors of shear strength, shear stiffness, and the slip model of the bonding interface. The results show that there are four typical failure modes in UHPC-NC under compression and shear, including complete interface failure (Class A), interface failure + NC shear failure (Class B), NC compression failure (Class C), and interface failure + NC compression failure + NC slip failure in the keyway (Class D). The complete interface failure type (Type A) without keyway treatment has sudden failure, and the keyway has the ability to disperse load and limit interface slip. The principal strain decreases along the normal sides of the interface, and the influence range of UHPC and NC sides is about 16.2 mm and 17.5 mm, respectively. In practice, the thinnest part of the treatment structure should not be less than 2 cm. The shear strength of the prefabricated UHPC-post-pouring NC interface is generally low, and the maximum shear strength of 13.9 MPa obtained by the test is still lower than the recommended value of 14–21 MPa of ACI 546.3R-14. In treatment design, the interface shear reinforcement can be introduced to ensure the cooperative bearing capacity. The shear strength of the prefabricated UHPC-post-poured NC interface is slightly affected by the interface agent and postpoured concrete grade and increases linearly with the increase in the number of keyways. When the number of keyways is equivalent to the roughness index, the relationship between the shear strength and the roughness is as follows: . Under the action of keyway, the interface slip of UHPC-NC can be simplified into four stages: the interface slip stage, the keyway strengthening stage, the shear yield stage, and the specimen failure stage. Based on this, a prefabricated UHPC-post-pouring NC interface slip model was proposed, and the experimental results of key parameters such as interface bond strength, stiffness, and slip amount at different stages were obtained by fitting. In the keyway strengthening stage, the shear stiffness increases linearly first and then tends to be stable with the increase in the number of keyways. The maximum shear stiffness is about 20 MPa/mm, and the maximum interfacial slip increases with the increase in the number of keyways, which improves the overall shear resistance. The results can be used in the design of a tunnel-fabricated treatment segment.

1 September 2019 in IOP Conference Series: Earth and Environmental Science
Verified
Conference Paper
Open access
PDF file
XHXuebing Hu
Xuebing Hu
XJXinghong Jiang
Xinghong Jiang
KLKe Li
Ke Li
XCXiangyang Cui
Xiangyang Cui
The hollowing problem of tunnel lining structure is like a suspended bomb, which may affect the safety of vehicles and the safety of passengers at any time. Therefore, the study of tunnel lining structure cavity management technology has great social significance for ensuring tunnel safety. Taking a metro tunnel in Chongqing as an example, this paper proposes a reasonable lining structure reinforcement scheme of changing partial arches and reinforcing by steel strips after analyzing the environment, the bearing requirements, and the size and location of cavities. Based on the calculation formula of flexural members given by Code for Design of Concrete Structure Reinforcement, reduction system is introduced to calculate safety coefficient of flexural and compression members. The minimum value of structural bearing after treatment is 4.4, which meets the requirement of bearing capacity. Stratum structure method is used to calculate surrounding rock deformation during reinforcement. The maximum horizontal displacement is 1.9 mm, and the vertical displacement is 6 mm. The surrounding rock could be stable when treating defects, and the treatment scheme meets the requirements of bearing capacity and inner clearance. Therefore, the tunnel lining structure cavity can be reinforced by means of shotcrete and steel strips, without interrupting traffic and ensuring driving safety. The success of the treatment provides a useful reference for other similar projects.

1 January 2019 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
KLKe Li
Ke Li
XJXinghong Jiang
Xinghong Jiang
HDHao Ding
Hao Ding
XHXuebing Hu
Xuebing Hu
Displacement discontinuities method (DDM) is convenient for and efficient at dealing with discontinuity problems such as fracture and fault. However, the known method of ease iteration is not available for nonlinear joint surface problems. This paper introduces Barton‐Bandis nonlinear joint deformation failure criterion, figures out the propagation model of joint through the maximum energy release rate theory of rock fracture mechanics, and establishes three‐dimensional nonlinear displacement discontinuity model for rock joint. This paper gives results of the joint propagation pattern and its distribution law under tension and compression with different parameters and side pressure coefficients via compiled program.

1 September 2019 in IOP Conference Series: Earth and Environmental Science
Verified
Conference Paper
Open access
PDF file
XHXuebing Hu
Xuebing Hu
XJXinghong Jiang
Xinghong Jiang
KLKe Li
Ke Li
XCXiangyang Cui
Xiangyang Cui
Improper control of tunnel structure adjacent to bridge piers in soft soil area will lead to structural deformation and traffic unsafety. In view of the engineering difficulties in the construction of the near-bridge-pier interchange ramp between Shenzhen-Zhongshan Bridge and Guangzhou-Shenzhen Expressway along Yangtze River, numerical simulations are carried out based on analyses of the position relationship and geological conditions. During ramp tunnel construction, the maximum horizontal displacement of the diaphragm wall structure is 19 mm, and the maximum horizontal displacement of the bridge pier, located in the middle of the foundation pit, is 7.4 mm. The vertical uplift displacement at the bottom of the foundation pit and that at the top of the open-cut tunnel structure is large, about 5.3 mm. In view of the analysis results, control measures such as soil reinforcement treatment and timely lateral support are introduced to ensure construction safety and provide reference for similar projects.