Zhiyu Gong

Dr. Zhiyu Gong


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications

18 July 2024 in Research Square
Verified
Preprint
Open access
PDF file
ZGZhiyu Gong
Zhiyu Gong
GDGuoliang Dai
Guoliang Dai
XCXinsheng Chen
Xinsheng Chen
HOHaoran Ouyang
Haoran Ouyang
THTao Hu
Tao Hu
ZCZhiwei Chen
Zhiwei Chen
Bearing characteristics and interactions of a pile group are complex. and there is almost no on-site full-scale test data for cemented-soil composite pile group. In this research, vertical static load tests were conducted on two isolated pile, two-pile group and six-pile group for long-core SDCM pile. The bearing behavior of long-core SDCM pile and the interaction between pile groups have been studied. The results indicate that the long-core SDCM single pile is a typical friction type pile, and cemented soil provides most of the lateral friction resistance for the bearing capacity. In pile groups, pile spacing is the main factor affecting the pile group effect. The model calculation results based on the equivalent pier method are verified using on-site test data and the key parameters in the pile group for long-core SDCM pile including pile spacing Sij, cemented soil Elastic modulus Ec and PHC pipe pile Elastic modulus Ep are analyzed using a mathematical model. Parameter analysis results indicate that the pile group interaction for long-core SDCM pile is mainly reflected in settlement. Group effect is inapparent at pile spacing greater than 4 D. The appropriate value of Ec and Ep are taken in the range of 0.8-1.0 GPa and 30-40 GPa.

Verified
Journal Article
Open access
PDF file
LMLong Mao
Long Mao
SOShi Ouyang
Shi Ouyang
JYJiayi Yang
Jiayi Yang
GDGuoliang Dai
Guoliang Dai
ZGZhiyu Gong
Zhiyu Gong
WZWenbo Zhu
Wenbo Zhu
Large caisson foundations in sea-crossing bridges are often constructed in non-uniform bedrock with fractured weak layers, where the mechanical response during sinking, bottom sealing, and core filling is complex and not well understood. Existing studies generally assume uniform and intact bedrock and focus primarily on the service stage, leaving the entire construction process in such complex strata largely unexamined. To address this gap, this study investigates a large caisson foundation using field investigation data and three-dimensional numerical simulation with PLAXIS 3D (version: V20), taking the Xihoumen Rail-cum-Road Sea-crossing Bridge as an engineering case. Sonar-derived bedrock geometry, geological exploration data, and laboratory rock properties are incorporated, and the full construction process is simulated. After sinking, the maximum longitudinal and transverse displacements are 0.6269 mm and 0.6298 mm, respectively, both located on the right side of the middle compartment, while the maximum vertical displacement is 2.918 mm in the suspended part. Stress concentrates at the caisson–bedrock interface, with a maximum vertical stress of 3825 kPa at the cutting edge. During core filling, the vertical displacement increases to 4.65 mm, while the longitudinal and transverse displacements show a fluctuating upward trend, reaching 0.854 mm and 0.87 mm, respectively. As the weak-layer thickness decreases from 0.8 m to 0.2 m, the displacements under the most unfavorable load combination decrease. For the investigated foundation, a weak-layer thickness of 0.6 m or more causes a notable increase in deformation, while the base stress changes little. These results are numerical predictions, and the 0.6 m threshold should be regarded as a project-specific recommendation rather than a universal design criterion. The findings provide a reference for similar projects.