Optimal operation scheduling of energy storage systems (ESSs) has been considered as an effective way to cope with uncertainties arising in modern grid operation such as the inherent intermittency of the renewable energy sources (RESs) and load variations. This paper proposes a scheduling algorithm where ESS power inputs are optimally determined to minimize the microgrid (MG) operation cost. The proposed algorithm consists of two stages. In the first stage, hourly schedules during a day are optimized one day in advance with the objective of minimizing the operating cost. In the second stage, the optimal schedule obtained from the first stage is repeatedly updated every 5 min during the day of operation to compensate for the uncertainties in load demand and RES output power. The ESS model is developed considering operating efficiencies and then incorporated in mixed integer linear programming (MILP). Penalty functions are also considered to acquire feasible optimal solutions even under large forecasting errors in RES generation and load variation. The proposed algorithm is verified in a campus MG, implemented using ESSs and photovoltaic (PV) arrays. The field test results are obtained using open-source software and then compared with those acquired using commercial software.
8 August 2023 in IEEE Transactions on Power Systems
With the deployment of PMUs in large-scale power systems, distributed state estimation (DSE) plays a major role in wide-area monitoring systems (WAMS). Specifically, the convergence and time efficiency of state estimators are important properties that must be preserved regardless of operating conditions. In this article, an equality-constrained PMU-based DSE strategy is proposed to enhance the numerical stability and computational efficiency of DSE. First, we identify network conditions in terms of the current flow magnitudes inducing the numerical instability of DSE. Then, we define a new local set of measurements and form equality constraints that enable the DSE problem to have a significantly reduced condition number, meaning that the numerical stability of DSE is enhanced. Moreover, an accelerated ADMM method is adopted to improve time efficiency. Furthermore, even if the measured data were corrupted, the proposed DSE strategy converges and estimate the states successfully. Numerical simulations are performed on IEEE 14-, 118-, and 1,062-bus systems, and the 1,665-bus Korean power system, to validate the performance of the proposed method. The results demonstrate the effectiveness of the method in terms of numerical stability and time efficiency under various measurement conditions.
The increasing penetration of distributed photovoltaic (PV) generation systems due to the expansion of renewable energy has posed challenges to power grid operators, particularly in managing the uncertainty caused by behind-the-meter (BTM) PV systems. These systems are unmeasured, complicating gross load estimation and grid management. To address this issue, a novel disaggregation method utilizing net load measurements and partially aggregated advanced metering infrastructure (AMI) data is proposed. The proposed method uses a weighted least squares (WLS) method by assigning higher weights to nighttime errors to mitigate daytime errors caused by PV generation. Additionally, a first-order time-scaling method is introduced to correct temporal discrepancies caused by partially aggregated AMI data. The proposed method is validated using data provided by the Korea Electric Power Research Institute (KEPRI).