Chunli Ying

Dr. Chunli Ying


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 July 2021
Verified
Book Chapter
Closed access
PDF file
DHD. Han
D. Han
CRC.N. Rolfsen
C.N. Rolfsen
BEB.D. Engeland
B.D. Engeland
Haidar HosamoHaidar Hosamo
Haidar Hosamo
HHH. Hjelmbrekke
H. Hjelmbrekke
CYChunli Ying
Chunli Ying
In the field of architecture, the virtual pre-assembly of prefabricated components (steel structure, some of concrete structure) need to obtain data through 3D laser scanning or other instruments, and then realize by computer virtual imitation. In recent years, the combination of BIM and virtual pre-assembly is more and more used in some large and complex steel structures, especially in the application of technology, and the effect is good. However, for the combination of BIM and virtual pre-assembly, there is little research on management. In this paper, the combination of BIM and virtual pre-assembly in the management of the application of a more in-depth study. Compared with the traditional construction management, the combination of BIM and virtual pre-assembly optimizes the key construction steps such as construction preparation, quality inspection, schedule management, resource coordination, etc., which can serve the whole life cycle of the project. We have applied the combination of BIM and virtual pre-assembly to the construction management of a large complex steel structure. The results show that the integration of BIM and virtual pre-assembly technology has many advantages over the traditional construction management. It can find some problems that traditional management can't find in advance, and allocate resources reasonably.

2 June 2026 in Buildings
Verified
Journal Article
Open access
PDF file
HZHao Zhu
Hao Zhu
CYChunli Ying
Chunli Ying
YCYulong Chen
Yulong Chen
JCJun Chen
Jun Chen
DHDaguang Han
Daguang Han
Corrosion-driven section loss in steel tower structures erodes load-carrying capacity, yet field assessment still relies on subjective visual grading. This paper presents a closed-loop framework coupling quantitative image-based corrosion measurement with stochastic degradation modeling, Monte Carlo reliability simulation, and Sobol’ variance-based global sensitivity decomposition. Two complementary segmentation paths—hue–saturation–value (HSV) color-space thresholding for fleet-scale screening and DeepLabV3+ deep learning for detailed evaluation—convert imagery into calibrated section-loss estimates via nonlinear regression. Three analysis modes (single-image, multi-angle weighted-median fusion, and Oriented FAST and Rotated BRIEF (ORB) feature-matched temporal differencing) feed a Bayesian-updated power-law corrosion growth model whose outputs propagate through a time-dependent limit-state function via 106-sample Monte Carlo simulation. Sobol’ indices rank each uncertain input’s contribution to the reliability-index variance. A field demonstration on a 40-year-old galvanized lattice tower in an ISO 9223 C4 coastal environment shows that the corrosion rate constant and zinc coating thickness together govern 65% of the total reliability variance and that a risk-ranked selective maintenance strategy reduces expected life-cycle cost by 71% relative to blanket intervention.

22 September 2026 in Applied Sciences
Verified
Journal Article
Open access
PDF file
JCJun Chen
Jun Chen
CYChunli Ying
Chunli Ying
YCYulong Chen
Yulong Chen
ZHZhu Hao
Zhu Hao
DHDaguang Han
Daguang Han
When gridded meteorological data drive finite element (FE) models, the interfaces carrying product identity, coordinates, axis order, time, and units are rarely checked. We built an auditable workflow linking an archived ECMWF gridded wind product, DEM metadata, Unity sampling, node exports, and ANSYS 2025 R2 comparisons, treating each interface as a gate that can fail. Three gates failed. The archived GRIB holds 48 monthly averages by hour of day (stream = mnth), not a continuous 48-h event; the runtime decoded magnitude from a constantly zero channel; and although the inline WGS84-to-UTM formula matches PROJ to 2.41 × 10−5 m, the wider mapping never closed, with none of the 234 towers inside the hard-coded wind subset and two Texture3D axes transposed. We then repaired what we could. Re-cropping the source to the line corridor and declaring the axis and vertical contracts moved tower containment from 0/234 to 234/234 and reproduced the source field to 0.0103 m/s against a 0.0307 m/s quantization step. Repeating the A–D solves with everything else fixed raised group A load from 292.050 to 355.034 N, displacement by 20.9%, and stress by 19.7%. The source time gate still fails, so results remain representative slot computations, not event responses. A synthetic control passes all six gates.