Bruce Hartsough

Dr. Bruce Hartsough


Research Focus & Metrics

Academic Career Length

26Years (2001-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 June 2005 in International Journal of Forest Engineering
Verified
Journal Article
Closed access
Raffaele SpinelliRaffaele Spinelli
Raffaele Spinelli
BHBruce Hartsough
Bruce Hartsough
NMNatascia Magagnotti
Natascia Magagnotti
Nine chippers were tested for particle size distribution, in order to a) see how chips produced with these machines matched the quality specifications set by the district heating plants of Northeastern Italy and b) detect significant differences between machines. The benchmark was set by collecting chip samples from fourteen district heating plants in the region of interest. The effect of operator skill was minimized and all machines were fed with the same assortment: logs, supplied in lengths varying between 2.4 and 6 m. All logs had similar moisture contents, which typically ranged between 33 and 37 % on a fresh weight base. Mobile in-woods chippers fed with limb-free logs produce high-quality chips, whose particle size distribution matches that of the best chips normally fed to the Italian district heating plants. Indeed, all the tested machines produced chip samples containing almost no oversize particles, very little fines (0.5 to 1 %), and a large majority of chips within the 3–45mm range (95 to 99 %), except the auger-equipped Laimet, which is designed to produce larger chips. There were statistically significant differences between machines and machine types, which were not affected by possible variations of the tree species processed.

31 December 2001 in Biomass and Bioenergy
Verified
Journal Article
Closed access
RSR. Spinelli
R. Spinelli
BHBruce Hartsough
Bruce Hartsough

17 June 2009 in Small-scale Forestry
Verified
Journal Article
Closed access
PDF file
MLMichael J. De Lasaux
Michael J. De Lasaux
Raffaele SpinelliRaffaele Spinelli
Raffaele Spinelli
BHBruce Hartsough
Bruce Hartsough
NMNatascia Magagnotti
Natascia Magagnotti

15 November 2017 in Forests
Verified
Journal Article
Open access
PDF file
TYTakuyuki Yoshioka
Takuyuki Yoshioka
RSRin Sakurai
Rin Sakurai
SKShohei Kameyama
Shohei Kameyama
KIKoki Inoue
Koki Inoue
BHBruce Hartsough
Bruce Hartsough
The processing of woody biomass waste piles for use as fuel instead of burning them was investigated. At each landing of slash pile location, a 132 kW grapple excavator was used to transfer the waste piles into a 522 kW horizontal grinder. Economies of scale could be expected when grinding a larger pile, although the efficiency of the loading operation might be diminished. Here, three piles were ground and the operations were time-studied: Small (20 m long × 15 m wide × 4 m high), Medium (30 × 24 × 4 m), and Large (35 × 30 × 4 m) piles. Grinding the Medium pile was found to be the most productive at 30.65 bone dry tons per productive machine hour without delay (BDT/PMH0), thereby suggesting that there might be an optimum size of slash pile for a grinding operation. Modeling of the excavator and grinder operations was also examined, and the constructed simulation model was observed to well-replicate the actual operations. Based on the modeling, the productivity of grinding at a landing area of 710 m2 of slash pile location was estimated to be 31.24 BDT/PMH0, which was the most productive rate.

12 October 2017 in Preprints.org
Verified
Preprint
Open access
PDF file
TYTakuyuki Yoshioka
Takuyuki Yoshioka
RSRin Sakurai
Rin Sakurai
SKShohei Kameyama
Shohei Kameyama
KIKoki Inoue
Koki Inoue
BHBruce Hartsough
Bruce Hartsough
The processing of woody biomass waste piles for use as fuel instead of burning them was investigated. At each landing slash pile location, a 132 kW grapple excavator was used to transfer the waste piles into a 522 kW horizontal grinder. Economies of scale could be expected when grinding a larger pile, although the efficiency of the loading operation might be diminished. Here, three piles were ground and the operations were time-studied: Small (20 m long × 15 m wide × 4 m high), Medium (30 × 24 × 4 m), and Large (35 × 30 × 4 m) piles. Grinding the Medium pile was found to be the most productive at 30.65 bone dry tons per productive machine hour without delay (BDT/PMH0), thereby suggesting that there might be an optimum size of slash pile for a grinding operation. We also examined modeling of the excavator and grinder operations, and we observed that the constructed simulation model well-replicated the actual operations. Based on the modeling, we estimated that the productivity of grinding at a landing area of 710 m2 of slash pile location was 31.24 BDT/PMH0, which was the most productive rate.