Marat Bulatovich Koshumbayev

Dr. Marat Bulatovich Koshumbayev

orcid

Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
27 April 2026 in Preprints.org
Verified
Preprint
Open access
PDF file
ADArystan Dikhanbayev
Arystan Dikhanbayev
BDBayandy Dikhanbaev
Bayandy Dikhanbaev
MKMarat Bulatovich Koshumbayev
Marat Bulatovich Koshumbayev
KBKuat Talgatovich Baubekov
Kuat Talgatovich Baubekov
KYKhakim Tanatuly Yessentay
Khakim Tanatuly Yessentay
SYSultan Ybray
Sultan Ybray
In the Republic of Kazakhstan, more than 300 million tons of ash are stored in dumps, containing substantial quantities of valuable metals. The aim of this work is to achieve waste-free and carbon-neutral processing of Ekibastuz coal. The innovations include: a smelter using new "ideal mixing–ideal displacement" method, lowering energy consumption by two to three times compared to current models; extraction degree exceeding 70% for germanium and zinc, and successful production of stone-cast products; a distiller based on the "counter colliding jets" method, with tenfold reduction in energy consumption, compared to a traditional one; a zinc-method for hydrogen production, reducing electricity to one-third of that required by electrolysis; carbon reduction from its dioxide by hydrogen. The analysis suggests that reaching carbon neutrality by 2060 for a boiler with a power rating of 125 MW will necessitate increasing its power output by approximately 2.58 times. A comprehensive assessment of the economic efficiency related to the processing of Ekibastuz coal, including 15% gas decarbonization, suggests that the system could realize a payback period of around eight years.