Modular multilevel converter (MMC), as a new type of topology, has aroused widespread concern in the research on HVDC system. However, there are some problems such as low anti-interference performance and output instability in their internal control systems. Based on these problems, this paper improves pole control on original control strategy. The improved control strategy not only can achieve active and reactive power independent control as well as stability control of the DC voltage, but also can reduce the oscillation amplitude and cut down the recovery time, as a consequence, the transient and steady-state performance are improved efficaciously. This paper establishes MMC-HVDC two AC systems and conducts the contrastive simulation analyses between the improved control strategies and original strategies in the MATLAB/Simulink. The results verify the validity and effectiveness of the theory.
1 August 2018 in Journal of Physics: Conference Series
When the UHVDC project was put into operation, grounding electrode grounding current may affect the transformer in the substation near the pole, it will cause transformer DC bias saturation, which leads to higher transformer temperature rise, too high harmonic and reactive power consumption, which will cause transformer damage or power grid blackout. The earth resistivity model of grounding pole is not accurate enough and the calculation of surface potential distribution is not accurate enough, which will cause the deviation between the evaluation and actual damage degree before and after the project put into operation. In order to simulate the grounding potential distribution directly after grounding, the simulation analysis with different methods can be checked with each other, and the related design units used CDEGS to simulate the earth potential rise. In this paper, the influence of DC transmission grounding electrode on the distribution of ground surface potential is analyzed, and the calculation method of DC grounding electrode current field is deduced. The 6 layers earth soil model was established. CDEGS and ANSYS were applied. The earth potential rise distribution in the 0~100 km radius of the earth electrode was calculated respectively. In this paper, the results of the earth potential distribution in the 0-50 km range of the two schemes were compared and analyzed. The results show that the calculation results of ANSYS were slightly smaller than those calculated by CDEGS, and the difference was about 0.6 V. The calculation results of the two schemes could provide reference for field practical monopole operation and commissioning.
1 August 2018 in Journal of Physics: Conference Series
It is necessary to reduce CO2 emission and improve energy efficiency saving in microgrid power generation scheduling. In this context, both cost and benefit are analyzed. Considering the CO2 emission, the energy efficiency saving and some constraint conditions, an economic model including the power supply and fuel gas supply is provided. The model is solved by genetic algorithm. The optimization results of calculation example show that the model provided is feasible and reliable. And it can also be applied to a large-scale power grid.
The short-circuit ratio is a key index used to measure the voltage support capability of new energy grid-connected systems, which contradicts its accuracy and practicability. The current short-circuit ratio index (SCR-U) does not consider the influence of the coupling impedance between power supply and load on the short-circuit ratio in the calculation process. This paper derives the coupled short-circuit ratio (SCR-O) based on SCR-U and the coupled equivalent impedance. The coupled critical short-circuit ratio (CSCR-O) is then numerically obtained based on the maximum transmission power, and the extreme value of the critical short-circuit ratio is calculated to provide a numerical basis to determine the accuracy of SCR-U and SCR-O. Finally, simulations demonstrate the superiority of the coupling short circuit to the short-circuit ratio index. It can provide more accurate results and reflect the system’s real-time voltage stability.
1 August 2018 in Journal of Physics: Conference Series
This paper introduced the boundary conditions of the complex soil potential. Then the simulation is carried out with the ANSYS software. And effect of the ground potential distribution in rivers and mountains of the complex geological conditions are analyzed. It is pointed out that rivers can change the potential distribution, and mountains can hardly change the potential. The rational use of these characteristics can effectively alleviate the effect of the grounding electrode potential on the power system and the environment. At last, the importance of establishing a three-dimensional geoelectric field model is put forward, and the geodetic structure is more accurately understood by considering the transversal difference of the earth. Then the current field distribution around the DC ground electrode is calculated accurately. It is better to serve the construction of UHVDC power transmission project in China.
With the evolution of the new power system, the importance of substation grounding network performance is increasingly prominent, the optimization of the old substation renovation work is also gradually into the right track and attention. In this paper, the impact of resistive coupling between the grounding network system and its surrounding underground metal pipe network system in the substation renovation project is explored and analyzed in depth, and the electromagnetic field model of the grounding network and the pipe network is established respectively by using the research method of field-circuit coupling and the two simulation software CDEGS and ETAP are integrated to focus on the changes in key performance parameters during the renovation of substation grounding network, and it is found that its resistive coupling effect leads to some fluctuations in the key performance parameters. Based on the above research content, a series of optimized protection measures suitable for the actual reconstruction project are further proposed, aiming at guaranteeing the safe and stable operation of the grounding system as well as the surrounding metal pipe network under fault conditions. This study provides a theoretical basis and practical technical support for the optimization of substation grounding network and similar projects.