College of Civil Engineering, National Center for International Research Collaboration in Building Safety and Environment, Hunan University, Changsha 410082, China
Dr. Guoqiang Zhang
College of Civil Engineering, National Center for International Research Collaboration in Building Safety and Environment, Hunan University, Changsha 410082, China
This paper investigates the energy performances of a hybrid system composed of a phase change materials-ventilated Trombe wall (PCMs-VTW) and a photovoltaic/thermal panel integrated with phase change material (PV/T-PCM). Equivalent overall output energy (QE) was proposed for energy performance evaluation regarding different energy forms, diversified conversions and hybrid thermal storages. This study focuses on parameters’ optimization of the PV/T-PCM system and parameters in the PCMs-VTW are kept optimal. Based on the experimentally validated numerical modelling, nine trial experiments have been conducted following Taguchi L9 (34) standard orthogonal array. The higher the better concept was implemented and the optimal combination of operating parameters was thereafter identified by using signal-to-noise (S/N) ratio and Analysis of Variance (ANOVA) method. The results show that QE is highly dependent on the mass flow rate, followed by the diameter of active cooling water pipe. However, the inlet cooling water temperature and the thickness of PCM have limited influence on QE. The optimal combination of each factor was identified as B3A3C2D1 (mass flow rate of 1 kg/s, diameter of water pipe of 0.6 m, inlet cooling water temperature of 15 °C and the thickness of PCM of 20 mm) with the highest QE of 20,700 kWh.
Heating, Ventilation, and Air-Conditioning (HVAC) system that is almost indispensable service system of modern buildings is recognized as the most important engineering control measure against pandemics. However, the effectiveness of HVAC systems has been questioned on their ability to control airborne transmission. After the outbreak of COVID-19, China has controlled the spread within a relatively short period. Considering the large population, high population density, busy transportation and the overall underdeveloped economy, China’s control measures may have some implications to other countries, especially those with limited resources. This paper intends to provide a systematic summary of Chinese ventilation guidelines issued to cope with COVID-19 transmission. The following three aspects are the main focus of these guidelines: (1) general operation and management schemes of various types of HVAC systems, (2) operation and management schemes of HVAC system in typical types of buildings, and (3) design schemes of HVAC system of makeshift hospitals. In addition, some important differences in HVAC guidelines between China and other countries/institutions are identified and compared, and the possible reasons are discussed. Further discussions are made on the following topics, including the required fresh air supply, the extended operation time, the use of auxiliary equipment, the limited capacity of existing systems, and the use of personalized systems.